ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.
Vizsla Silver Corporation

Vizsla Silver Corporation (VZLA)

1.96
0.03
(1.55%)
Closed July 27 4:00PM
1.98
0.02
(1.02%)
After Hours: 4:46PM

Real-time discussions and trading ideas: Trade with confidence with our powerful platform.

Key stats and details

Current Price
1.98
Bid
-
Ask
-
Volume
543,906
1.90 Day's Range 1.98
0.935 52 Week Range 2.21
Market Cap
Previous Close
1.93
Open
1.97
Last Trade
3957
@
1.96
Last Trade Time
Financial Volume
$ 1,060,411
VWAP
1.9496
Average Volume (3m)
1,221,126
Shares Outstanding
235,096,755
Dividend Yield
-
PE Ratio
-47.23
Earnings Per Share (EPS)
-0.06
Revenue
-
Net Profit
-13.59M

About Vizsla Silver Corporation

Vizsla Silver Corp is a junior mineral exploration and development company focused on advancing its Panuco silver-gold project located in Sinaloa, Mexico. The property contains quartz-carbonate veins with workings defining both steeply plunging and sub-horizontal ore shoots. Mineralization occurs as... Vizsla Silver Corp is a junior mineral exploration and development company focused on advancing its Panuco silver-gold project located in Sinaloa, Mexico. The property contains quartz-carbonate veins with workings defining both steeply plunging and sub-horizontal ore shoots. Mineralization occurs as silver sulphides including argentite and acanthite, native gold, electrum and native silver associated with pyrite, minor galena, sphalerite and rare chalcopyrite. Show more

Sector
Miscellaneous Metal Ores,nec
Industry
Miscellaneous Metal Ores,nec
Headquarters
Vancouver, British Columbia, Can
Founded
1970
Vizsla Silver Corporation is listed in the Miscellaneous Metal Ores sector of the American Stock Exchange with ticker VZLA. The last closing price for Vizsla Silver was $1.93. Over the last year, Vizsla Silver shares have traded in a share price range of $ 0.935 to $ 2.21.

Vizsla Silver currently has 235,096,755 shares outstanding. The market capitalization of Vizsla Silver is $453.74 million. Vizsla Silver has a price to earnings ratio (PE ratio) of -47.23.

VZLA Latest News

VIZSLA SILVER DELIVERS EXCEPTIONAL ECONOMICS FOR PANUCO IN PRELIMINARY ECONOMIC ASSESSMENT

VIZSLA SILVER DELIVERS EXCEPTIONAL ECONOMICS FOR PANUCO IN PRELIMINARY ECONOMIC ASSESSMENT Canada NewsWire VANCOUVER, BC, July 24, 2024 NYSE:ย VZLAย ย ย ย  TSX-V: VZLA After-Tax NPV (5%) of US$1,137...

VIZSLA SILVER REPORTS MORE HIGH-GRADE RESULTS AT COPALA AND COPALA 3, DEMONSTRATING STRONG MINERAL CONTINUITY

VIZSLA SILVER REPORTS MORE HIGH-GRADE RESULTS AT COPALA AND COPALA 3, DEMONSTRATING STRONG MINERAL CONTINUITY Canada NewsWire VANCOUVER, BC, July 9, 2024 NYSE:ย VZLAย  TSX-V: VZLA VANCOUVER, BC...

VIZSLA SILVER HITS VISIBLE GOLD IN HIGHEST GRADE INTERCEPT EVER AT PANUCO: 9,920 G/T SILVER & 663 G/T GOLD OVER 0.64 METRES TRUE WIDTH AT COPALA

VIZSLA SILVER HITS VISIBLE GOLD IN HIGHEST GRADE INTERCEPT EVER AT PANUCO: 9,920 G/T SILVER & 663 G/T GOLD OVER 0.64 METRES TRUE WIDTH AT COPALA Canada NewsWire VANCOUVER, BC, June 26, 2024...

Vizsla Silver Announces Effective Date of Vizsla Royalties Spinout

Vizsla Silver Announces Effective Date of Vizsla Royalties Spinout PR Newswire VANCOUVER, BC, June 20, 2024 NYSE: VZLAย ย ย ย  TSX-V: VZLA VANCOUVER, BC, June 20, 2024 /PRNewswire/ - Vizsla Silver...

Vizsla Silver Announces Receipt of Court Approval and Expected Closing Date for Vizsla Royalties Spinout

Vizsla Silver Announces Receipt of Court Approval and Expected Closing Date for Vizsla Royalties Spinout PR Newswire VANCOUVER, BC, June 19, 2024 NYSE: VZLAย ย ย ย  TSX-V: VZLA VANCOUVER, BC, June...

PeriodChangeChange %OpenHighLowAvg. Daily VolVWAP
10.147.608695652171.842.051.848655611.94977213CS
40.2212.51.762.211.688870051.93139577CS
120.6245.58823529411.362.211.33212211261.74348045CS
260.6346.66666666671.352.211.079049561.58802254CS
520.8169.23076923081.172.210.9355576691.50791161CS
156-0.41-17.15481171552.392.390.913141041.4722987CS
260-0.41-17.15481171552.392.390.913141041.4722987CS

Movers

View all
  • Most Active
  • % Gainers
  • % Losers
SymbolPriceVol.
WINTWindtree Therapeutics Inc
$ 8.24
(150.46%)
48.57M
BFIBurgerFi International Inc
$ 0.4206
(97.37%)
313.59M
NBSTWNewbury Street Acquisition Corporation
$ 0.1349
(92.71%)
122.1k
YIBOPlanet Image International Ltd
$ 2.915
(53.43%)
260.07k
CREVCarbon Revolution Public Ltd
$ 9.00
(45.87%)
8.06M
NMHINatures Miracle Holding Inc
$ 0.2035
(-48.06%)
7.69M
TANHTantech Holdings Ltd
$ 0.2585
(-47.23%)
6.75M
DXCMDexCom Inc
$ 64.00
(-40.66%)
53.92M
PSIGPS International Group Ltd
$ 1.42
(-31.40%)
716.26k
POAIPredictive Oncology Inc
$ 1.36
(-27.27%)
6.02M
SLNASelina Hospitality PLC
$ 0.0305
(-18.88%)
408.61M
BFIBurgerFi International Inc
$ 0.4206
(97.37%)
313.59M
NVDANVIDIA Corporation
$ 113.06
(0.69%)
293.33M
SQQQProShares UltraPro Short QQQ
$ 9.10
(-2.88%)
176.49M
SGMOSangamo Therapeutics Inc
$ 0.8612
(28.15%)
123.71M

VZLA Discussion

View Posts
Oleblue Oleblue 2 days ago
VIZSLA SILVER DELIVERS EXCEPTIONAL ECONOMICS FOR PANUCO IN PRELIMINARY ECONOMIC ASSESSMENT

After-Tax NPV (5%) of US$1,137 million, After-Tax IRR of 85.7%, Initial Capex of US$224 million, Average Annual Production of 15.2 million oz AgEq at AISC of US$9.40 per oz AgEq

Vancouver, British Columbia (July 24, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) is pleased to announce the results from the independent preliminary economic assessment (โ€œPEAโ€) on its 100%-owned flagship Panuco silver-gold project ("Panuco" or the โ€œPanuco Projectโ€) located in Mexico.

The PEA, completed by Ausenco Engineering Canada ULC (โ€œAusencoโ€), supported by Entech Mining Ltd. (โ€œEntechโ€) and SGS Canada Inc. (โ€œSGSโ€), provides a robust base case assessment for developing Panuco as a long-life, high-margin underground precious metals mine with low initial capital requirements and a fast timeline to production.

โ€œAn estimated after-tax NPV (5%) of more than US$1.1 billion, an after-tax IRR of 85.7% and a payback period of approximately nine months, helps solidify Panuco as a world class development project in the precious metals space,โ€ commented Michael Konnert, President and CEO. โ€œThe PEA, based on conservative metals prices of US$26/oz silver and US$1,975/oz gold, outlines a high-margin, underground silver primary mine with substantial silver-gold production of 162.1 million silver-equivalent ounces over an initial 11-year mine life.

Annually, the mine is projected to produce an average of 15.2 million silver-equivalent ounces, providing exceptional free cash flow, particularly in the early years, allowing for a very rapid payback of the estimated low initial Capex of US$224 million. Itโ€™s important to note, that this PEA represents only a snapshot of the potential value of Panuco, as we have only explored less than 30% of the known targets in the district.

Furthermore, ongoing drilling with two drill rigs continues to expand and convert high-grade veins in and around the proposed mine plan, enhancing the potential for improved economics in a feasibility study planned for the second half of 2025. Panuco benefits from excellent access to existing infrastructure, significant exploration upside potential to discover new mineralized centers and potentially new standalone projects hosting similar economics to that outlined in todayโ€™s study. As such, itโ€™s becoming increasingly clear that Panuco will be a meaningful contributor to the silver industry for decades to come. I would like to thank everyone at Vizsla Silver, our stakeholders and community members for all the hard work over the years to reach this monumental milestone.โ€

The Company cautions that the results of the PEA are preliminary in nature and include inferred mineral resources that are considered too speculative geologically to have economic consideration applied to them to be classified as mineral reserves. There is no certainty that the results of the PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

PEA Webcast

Vizsla Silver will be hosting a webcast to discuss the PEA at 10:00 am PT (1:00 pm ET) on Thursday, July 25, 2024. To register, please click here.

CONTINUED:
https://mailchi.mp/c2eb3344f25d/9q3gdbv5bm-5722052?e=0ca03548e2

Weekly Chart
๐Ÿ‘๏ธ0
Joe Kaplan Joe Kaplan 2 weeks ago
Wish I knew the answer to that.
Seems to me , if VZLA keeps pulling up bucket loads of extremely high grade silver/gold in the drill samples, they will have any number of prospective partners and possible buyout offers. Its all win - win IMHO, so a delay may if fact be a positive in the long run. Lets be real, seems to me, these drill cores are off the chart in grams/ton and they are all very very good news. Any one else see it that way ??

We will see about the PEA sooner or later.
๐Ÿ‘๏ธ0
Gene_Simmons Gene_Simmons 2 weeks ago
Question, have they delayed it? It was said for a long time 'early Q3'. Now I hear 'in time for Beaver Creek in September.

That is ungodly frustrating if true.
๐Ÿ‘๏ธ0
Joe Kaplan Joe Kaplan 2 weeks ago
Ready for a great PEA and, a bright future, along with, I hope, a first class partnership deal. I would not be surprised if there are feelers out there for a buyout, esp because of the "spinout" royalties. Should be interesting to see the market price of the spinout shares.

https://newagemetals.com/understanding-preliminary-economic-assessments-a-crucial-tool-for-junior-mining-companies-and-investors/
๐Ÿ‘๏ธ0
Oleblue Oleblue 3 weeks ago
VIZSLA SILVER REPORTS MORE HIGH-GRADE RESULTS AT COPALA AND COPALA 3, DEMONSTRATING STRONG MINERAL CONTINUITY
Vancouver, British Columbia (July 09, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizslaโ€ or the โ€œCompanyโ€) is pleased to report results from six new drill holes targeting the Copala resource area at its 100%-owned, flagship Panuco silver-gold project ("Panuco" or the "Project") located in Mexico. The reported drilling, designed to infill near-surface Indicated Mineral Resources, continues to confirm high-grade continuity throughout Copala including new high-grade intercepts on the Copala 3 hanging-wall vein splay.

Highlights

CS-24-366 returned 2,398 grams per tonne (g/t) silver equivalent (AgEq) over 7.00 metres true width (mTW) (1,898 g/t silver and 9.51 g/t gold)
Including 5,385 g/t AgEq over 0.56 mTW (3,950 g/t silver and 25.40 g/t gold)
And, 4,457 g/t AgEq over 1.29 mTW (3,430 g/t silver and 18.95 g/t gold)


CS-24-359 returned 1,027 g/t AgEq over 7.80 mTW (788 g/t silver and 4.40 g/t gold)
Including 6,343 g/t AgEq over 0.86 mTW (5,010 g/t silver and 25.30 g/t gold)
And, 1,749 g/t AgEq over 0.53 m TW (1,360 g/t silver and 7.26 g/t gold)


CS-24-361 returned 2,023 g/t AgEq over 3.50 mTW (1,617 g/t silver and 7.83 g/t gold)
Including 6,331 g/t AgEq over 0.39 mTW (5,230 g/t silver and 22.30 g/t gold)


CS-24-363 returned 2,193 g/t AgEq over 2.68 mTW (1,831 g/t silver and 7.47 g/t gold)
Including 4,787 g/t AgEq over 0.78 mTW (4,040 g/t silver and 15.75 g/t gold)

โ€œOngoing infill drilling at Copala, where initial mining will likely take place, continues to demonstrate exceptional mineral continuity,โ€ commented Michael Konnert, President & CEO. โ€œTight-spaced drilling along Copala Main and its hanging-wall splay structures has now expanded the high-grade footprint closer to surface, potentially reducing the overall development required to access the minerlization. The more we drill on the property, the more confidence we have that Panuco will be a high-margin, low capex project. Moving forward, we will continue our conversion drilling at Copala as we de-risk the Project ahead of the maiden PEA, slated for early Q3 2024.โ€
Figure 1: Plan map of recent drilling centered on the Copala structure.
The precious metals dominant Copala structure, located in the western portion of the Panuco district, is situated ~800 m to the east of the Napoleon Vein. Copala currently hosts Indicated Resources of 83.3 Moz AgEq at 573 g/t AgEq and Inferred Resources of 48.3 Moz AgEq at 476 g/t AgEq within a broad envelope of vein-breccia interlayered with host rock, up to 82 metres thick (please refer to our Technical Report on Updated Mineral Resource Estimate for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico, by Allan Armitage, Ben Eggers and Peter Mehrfert, dated February 12, 2024 and to Vizslaโ€™s press release dated January 8, 2024). Interpretations by Vizsla geologists indicate Copala has an average dip of ~46ยฐ to the east (~35ยฐ in its northern sector and steepening to ~65ยฐ in the southern sector).

Exploration and Resource drilling at Copala has traced mineralization along ~1,770 metres of strike length and ~400 metres down dip. The infill holes reported herein are part of an ongoing ~10,000 program (~35 holes), planned to convert near surface Indicated Mineral Resources in the central portion of main Copala into the Measured Resource category. The six infill holes reported were drilled at approximately 25 metre centers from pre-existing holes and continue to successfully confirm grade continuity along the main Copala structure. Additionally, some of these holes also intercepted high-grades on Copala 3, which sits between 10-45 metres to the east of Copala main, on the hanging-wall side of the structure. The Copala 3 vein is demonstrating good continuity with many holes having previously intercepted the structure, as shown by the blue pierce points in Figure 3. The high grades seen in Copala 3, may contribute to a further improved, overall grade profile as more resources are converted to higher confidence categories in the central portion of Copala. Vizsla plans to complete its ongoing ~10,000 infill program by mid to late July. Based on the results received, Vizsla is analysing additional drilling metres to continue upgrading and expanding mineral resources in high priority areas at Copala.
Figure 2: Inclined longitudinal section for Copala structure with drillhole pierce points. The section is 1x along strike to 1.4x along the dip to compensate for the average 46-degree dip of Copala. The gray and black dash outlines represent Copala 2, Copala 3 and Copala 4 vein splays.
Figure 3: Inclined longitudinal section for Copala 3 vein splay with drillhole pierce points. The section is 1x along strike to 1.4x along the dip to compensate for the average 46-degree dip of Copala.
Figure 4: Cross section showing Copala structure, Cristiano, Copala 3, Copala 4 and FW Splay veins with completed drilling.
Note: AgEq = Ag g/t x Ag rec. + (Au g/t x Au Rec x Au price/gram)/Ag price/gram. Metal price assumptions are $24.00/oz silver and $1,800/oz gold and metallurgical recoveries assumed are 91% for silver and 94% for gold. Gold and silver metallurgical recoveries used in this release are from metallurgical test results of the Copala vein (see press release dated August 16, 2023).

Table 1: Downhole drill intersections from the holes reported for Copala and Copala 3 veins. The two intercepts on main Copala for CS-24-359 occur within a broad (9.90 m) lower grade vein-breccia structure.
Table 2: Drillhole details for the reported drillholes. Coordinates in WGS84, Zone 13.


About the Panuco Project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 17,856.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq (please refer to our Technical Report on Updated Mineral Resource Estimate for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico, by Allan Armitage, Ben Eggers and Peter Mehrfert, dated February 12, 2024 and to our Companyยดs press release dated January 8, 2024).

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 368,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver has budgeted +30,000 metres of resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as test other high priority targets across the district.

Quality Assurance / Quality Control

Drill core samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver and rock samples were shipped to SGS Lab in Durango Mexico for sample preparation and analysis. The ALS Zacatecas, North Vancouver facilities and SGS lab are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption (โ€œAAโ€) spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish.

Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Companyโ€™s quality assurance / quality control protocol.

Qualified Person

In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP., Vice President of Exploration, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.

Information Concerning Estimates of Mineral Resources

The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the โ€œSECโ€). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the โ€œCIM Definition Standardsโ€), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.

You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, โ€œinferred mineral resourcesโ€ are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of โ€œcontained ouncesโ€ in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute โ€œreservesโ€ by SEC standards as in place tonnage and grade without reference to unit measures.

Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the โ€œSEC Modernization Rulesโ€), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of โ€œmeasured mineral resourcesโ€, โ€œindicated mineral resourcesโ€ and โ€œinferred mineral resourcesโ€. Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be โ€œsubstantially similarโ€ to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as โ€œmeasured mineral resourcesโ€, โ€œindicated mineral resourcesโ€ and โ€œinferred mineral resourcesโ€ under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer

Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain โ€œForward-Looking Statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ under applicable Canadian securities laws. When used in this news release, the words โ€œanticipateโ€, โ€œbelieveโ€, โ€œestimateโ€, โ€œexpectโ€, โ€œtargetโ€, โ€œplanโ€, โ€œforecastโ€, โ€œmayโ€, โ€œwouldโ€, โ€œcouldโ€, โ€œscheduleโ€ and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including plans for resource/discovery-based drilling, designed to upgrade, and expand the maiden resource as well as test other high priority targets across the district.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of the COVID-19 pandemic; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silverโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect Vizsla Silverโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption โ€œRisk Factorsโ€ in Vizsla Silverโ€™s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

https://mailchi.mp/9097f1f06fe7/9q3gdbv5bm-5692500?e=0ca03548e2

Weekly Chart
๐Ÿ‘๏ธ0
Gene_Simmons Gene_Simmons 4 weeks ago
We are now officially in PEA any day now-mode
👍️ 1
Joe Kaplan Joe Kaplan 4 weeks ago
FYI.......
Have received the "Spin Co " shares posted now in my brokerage account.
Also received the warrant shares .
There is no value/amount on the securities however..
and there is no ticker symbol for either of them.
Presumably there will be a value on them soon, and that will happen in the near future when those begin trading, whenever that will happen.
My guess/hope is in the very near future. . We will see.
The best to all.
👍️ 1
Oleblue Oleblue 1 month ago
VIZSLA SILVER HITS VISIBLE GOLD IN HIGHEST GRADE INTERCEPT EVER AT PANUCO: 9,920 G/T SILVER & 663 G/T GOLD OVER 0.64 METRES TRUE WIDTH AT COPALA
Vancouver, British Columbia (June 26, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizslaโ€ or the โ€œCompanyโ€) is pleased to report results from five new drill holes targeting the Copala resource area at its 100%-owned, flagship Panuco silver-gold project ("Panuco" or the "Project") located in Mexico. The reported drilling, designed to infill near-surface Indicated Mineral Resources, continues to confirm high-grade continuity throughout Copala and reveals how rich the mineralizing hydrothermal system involved in initial vein formation was.

Highlights

CS-24-356 returned 8,817 grams per tonne (g/t) silver equivalent (AgEq) over 4.20 metres true width (mTW) (1,694 g/t silver and 103.20 g/t gold)
Including 55,769 g/t AgEq over 0.64 mTW (9,920 g/t silver and 663.00 g/t gold)


CS-24-362 returned 1,103 g/t AgEq over 10.50 mTW (804 g/t silver and 5.27 g/t gold)
Including 4,881 g/t AgEq over 1.47 mTW (3,437 g/t silver and 24.87 g/t gold)
And, 1,379 g/t AgEq over 0.91 m TW (1,145 g/t silver and 4.78 g/t gold)

โ€œTodayโ€™s results represent some of the highest-grade gold intercepts drilled to date at the Panuco Project,โ€ commented Michael Konnert, President & CEO. โ€œOur ongoing infill program, targeting the near-surface ultra high-grade zone at Copala continues to deliver exceptional silver and gold grades over very broad widths. In addition to confirmation of continuity, hole CS-24-356 also expanded high-grade mineralization closer to surface. Moving forward we will continue our conversion drilling at Copala as we de-risk the project ahead of the maiden PEA, slated for early Q3 2024.โ€

https://mailchi.mp/9bd45d56e2ea/9q3gdbv5bm-5691796?e=0ca03548e2
๐Ÿ‘๏ธ0
Joe Kaplan Joe Kaplan 1 month ago
RE SILVER SUPPLY DEMAND IMBALANCE....... + VIDEO
https://themarket.ch/english/the-silver-market-is-experiencing-a-deficit-for-the-third-consecutive-year-ld.11348



Precious metals are attracting increasing interest. After a long sideways trend, gold and silver have come to life. Meanwhile, consolidation among mine operators is progressing.

Pan American Silver is one of the leading silver mining companies. The Vancouver-based group is primarily active in Latin America. With the acquisition of Yamana Goldโ€™s South American portfolio in spring 2023, it has significantly expanded its presence in the region.

For CEO Michael Steinmann, it is evident that silver will play an increasingly important role in the modern economy, especially regarding the energy transition to renewables. However, while demand is increasing, supply capacities will remain limited for the foreseeable future.

«There will soon be very little inventory left,» says the Swiss mining executive with more than 25 years of experience in the sector. «Consequently, any uptick in investment demand, coupled with ongoing industrial usage, could create a particularly bullish scenario.»

In an in-depth conversation with The Market NZZ, Mr. Steinmann talks about the fundamentals in the global silver market, important trends in the industry, and the companyโ€™s strategy to further grow production in the coming years.
๐Ÿ‘๏ธ0
Oleblue Oleblue 1 month ago
Vizsla Silver Announces Shareholder Approval at Special Meeting
Vancouver, British Columbia (June 17, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) is pleased to announce that Vizsla Silver shareholders (โ€œShareholdersโ€) approved the plan of arrangement (the โ€œArrangementโ€) with Vizsla Royalties Corp. (โ€œSpincoโ€) at the special meeting of Shareholders held today (the โ€œMeetingโ€).

Under the Arrangement, the owners of common shares of Vizsla Silver (each a โ€œVZLA Shareโ€) are entitled to receive one-third of a common share of Spinco and one-third of a common share purchase warrant of Spinco for each VZLA Share held immediately prior to the closing of the Arrangement. Following the Arrangement, Spinco will no longer be a wholly owned subsidiary of Vizsla Silver.

Shareholders voted a total number of 101,847,455 Vizsla Silver shares representing 43.69% of the outstanding shares present in person or represented by proxy at the Meeting held today.

The Arrangement was approved by 85.03% of the votes cast by Shareholders.

Shareholders also approved the share option plan of the Spinco (the โ€œSpinco Option Planโ€) at the Meeting. The Spinco Option Plan was approved by 69.16% of the votes cast by Shareholders.

The Company intends to make an application to the Supreme Court of British Columbia (the โ€œCourtโ€) for a Final Order on June 19, 2024.

On June 11, 2024, the Company announced that it anticipated that June 21, 2024, would be the record date, and that Shareholders of record on such date will be entitled to receive Spinco securities. The Company wishes to clarify that the Transaction is an โ€œEffective Dateโ€ transaction. Accordingly, Shareholders of record as of the close of business on the last trading day immediately prior to the Effective Date, which last trading day is currently expected to be on or about June 21, 2024, will receive Spinco securities.

This announcement is for informational purposes only and does not constitute a solicitation or a proxy.

About the Panuco Project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 17,856.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq (please refer to our Technical Report on Updated Mineral Resource Estimate for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico, by Allan Armitage, Ben Eggers and Peter Mehrfert, dated February 12, 2024 and to our Companyยดs press release dated January 8, 2024).

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 368,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver has budgeted +30,000 metres of resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as test other high priority targets across the district.

In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

NOTE REGARDING FORWARD LOOKING STATEMENTS

The information contained herein contains โ€œforward-looking statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ within the meaning of applicable Canadian securities legislation. โ€œForward-looking informationโ€ includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as โ€œplansโ€, โ€œexpectsโ€, โ€œis expectedโ€, โ€œbudgetโ€, โ€œscheduledโ€, โ€œestimatesโ€, โ€œforecastsโ€, โ€œintendsโ€, โ€œanticipatesโ€, or โ€œbelievesโ€ or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results โ€œmayโ€, โ€œcouldโ€, โ€œwouldโ€, โ€œmightโ€ or โ€œwill be takenโ€, โ€œoccurโ€ or โ€œbe achievedโ€ or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements with respect to timing, structure and completion of the Arrangement, the treatment of Vizsla Silver and Spincoโ€™s securities under the Arrangement and Court, stock exchange and regulatory approvals for the Arrangement.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Companyโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Companyโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Companyโ€™s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Companyโ€™s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Companyโ€™s management team and outside contractors; risks regarding mineral resources and reserves; the Companyโ€™s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Companyโ€™s interactions with surrounding communities and artisanal miners; the Companyโ€™s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption โ€œRisk Factorsโ€ in the Companyโ€™s management discussion and analysis and other public disclosure documents.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

https://mailchi.mp/633822b351f8/9q3gdbv5bm-5691184?e=0ca03548e2

๐Ÿ‘๏ธ0
CashCowMoo CashCowMoo 1 month ago
Saw that article today on ZH. Silver has been promoted for decades to surge to $50, but now its getting different with all the solar stuff coming online.
๐Ÿ‘๏ธ0
Joe Kaplan Joe Kaplan 1 month ago
Solar and the coming SILVER SQUEEZE....
https://www.zerohedge.com/commodities/silver-demand-solar-sector-could-squeeze-silver-supply-future

and that makes no mention of BRICS and 59 nations using something besides the once almighty dollar for trade, esp the petro dollar. .
๐Ÿ‘๏ธ0
Oleblue Oleblue 2 months ago
Vancouver, British Columbia (June 11, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) wants to remind its valued shareholders that if the spinout of Vizsla Royalties Corp. (the โ€œArrangementโ€) is approved at the Special Meeting being held on June 17, 2024, the Company will seek a final order from the Supreme Court of British Columbia (the โ€œCourtโ€) to approve the Arrangement and closing will occur on or about June 24, 2024. It anticipates that June 21, 2024, will be the record date (the โ€œRecord Dateโ€), which shareholders of record will be entitled to receive spinout shares and spinout warrants.

The owners of common shares of Vizsla Silver (each a โ€œVizsla Silver Shareโ€) are entitled to receive one-third of a common share of Vizsla Royalties Corp. (the โ€œSpinco Sharesโ€) and one-third of a common share purchase warrant of Vizsla Royalties Corp. (the โ€œSpinco Warrantsโ€) for each Vizsla Silver Share held on the Record Date. Each full Spinco Warrant will entitle the holder thereof to purchase one Spinco Share at an exercise price of $0.05 per share for a period expiring on the earlier of: (i) 120 days after the date the Spinco Shares and Spinco Warrants are listed on the TSX Venture Exchange (the โ€œTSXVโ€); and (ii) December 31, 2025.

Current Holders of Vizsla Silver Corp. Warrants

For any current outstanding Vizsla Silver Corp. Warrants (โ€œVizsla Silver Warrantsโ€) held on the Record Date that are exercised for the original exercise price following the completion of the Arrangement, the Warrantholder will be entitled to receive, and will accept (in lieu of the Vizsla share to which such Warrantholder was until then entitled), one New Vizsla Silver share and one-third of one SpinCo Share. Any fractional entitlements to SpinCo Shares will be rounded down, and no fractional SpinCo Shares will be issued.

Any Warrantholders that exercise their warrants before June 20, 2024, to receive the Vizsla Silver Shares and holds those shares on the Record Date, will receive one-third of a common share of a Spinco Share and one-third of a common share purchase warrant of a Spinco Warrant. Anyone Warrantholder wishing to exercise their warrants can contact, Jennifer Hanson, Corporate Secretary, jen@vizslasilver.ca.

This announcement is for informational purposes only and does not constitute a solicitation or a proxy.

Post-Arrangement Matters

Immediately after completion of the Arrangement, shareholders of Vizsla Silver are expected to hold approximately 45% of the issued and outstanding Spinco Shares, while Vizsla Silver will retain the remaining approximately 55%.

Spinco has made an application to list the Spinco Shares and Spinco Warrants on the TSXV. There is no guarantee when, or if, such listings will be completed. Such listings will be subject to Spinco fulfilling all of the listing requirements of the TSXV.

Following closing of the Arrangement, Vizsla Silver and Spinco intend to complete a number of steps, including the following (collectively, the โ€œPost-Closing Stepsโ€): (a) the parties will settle an outstanding loan from Vizsla Silver into Spinco Shares, (b) Vizsla Silver will make an additional $3,500,000 loan to Spinco, (c) Spinco will exercise its buyback right on an underlying royalty on the Panuco Project, after which point the royalty held by Spinco will consist of a 2% net smelter returns royalty on the entire Panuco Project, (d) Spinco will complete a private placement for gross proceeds of at least $3,000,000, and (e) Spinco will complete a consolidation of the Spinco Shares on the basis of one new Spinco Share for every ten old Spinco Shares.

Vizsla Silver and Spinco have entered into a royalty right agreement which provides that, if Vizsla Silver or any of its affiliates acquires any a mineral property within a two-kilometer boundary around the Panuco Project, it must offer Spinco a net smelter returns royalty on such mineral property to Spinco on terms proposed by Vizsla Silver.

The foregoing discussion of the Arrangement and the Post-Closing Steps is intended to provide a general summary only. Shareholders are encouraged to read the Circular in its entirety.

About the Panuco Project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 7,189.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +35,000 metres of resource/discovery-based drilling designed to upgrade and expand the Projectโ€™s mineral resource, as well as test other high priority targets across the district.

In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

NOTE REGARDING FORWARD LOOKING STATEMENTS

The information contained herein contains โ€œforward-looking statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ within the meaning of applicable Canadian securities legislation. โ€œForward-looking informationโ€ includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as โ€œplansโ€, โ€œexpectsโ€, โ€œis expectedโ€, โ€œbudgetโ€, โ€œscheduledโ€, โ€œestimatesโ€, โ€œforecastsโ€, โ€œintendsโ€, โ€œanticipatesโ€, or โ€œbelievesโ€ or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results โ€œmayโ€, โ€œcouldโ€, โ€œwouldโ€, โ€œmightโ€ or โ€œwill be takenโ€, โ€œoccurโ€ or โ€œbe achievedโ€ or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: timing, structure and completion of the Arrangement; the terms of the Arrangement; the Post-Closing Steps; and exploration, development, and production at Panuco.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Companyโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Companyโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Companyโ€™s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Companyโ€™s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Companyโ€™s management team and outside contractors; risks regarding mineral resources and reserves; the Companyโ€™s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Companyโ€™s interactions with surrounding communities and artisanal miners; the Companyโ€™s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption โ€œRisk Factorsโ€ in the Companyโ€™s management discussion and analysis and other public disclosure documents.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

https://mailchi.mp/0fe3ed1aa0f2/9q3gdbv5bm-5690532?e=0ca03548e2
๐Ÿ‘๏ธ0
Joe Kaplan Joe Kaplan 2 months ago
seems evidence indicates the economy and income may win out over radical environmental concerns
but then nothing is certain in this old world. ...like the cartels in mexico and political corruption/endless wars on the part of the US.

https://apnews.com/article/mexico-energy-climate-change-lopez-obrador-claudia-sheinbaum-058347fcf1ea90544d536ccdaf2364a2

https://www.cruxinvestor.com/posts/mexicos-pivotal-election-could-boost-prospects-for-silver-miners-all-eyes-for-mining-policy-shifts

https://mexicobusiness.news/mining/news/sheinbaum-favor-lithium-ev-development
๐Ÿ‘๏ธ0
BestFishes BestFishes 2 months ago
My concern that is top of mind for all companies I'm researching are assets located in Mexico. The potential environmentalists who may soon run the politics of this country are not mining friendly. Yes, they've made statements about open pit mining, but that only signals that they are not mining friendly. Next, I believe they would come for the underground assets.
๐Ÿ‘๏ธ0
Joe Kaplan Joe Kaplan 2 months ago
A thought that makes some sense to me, especially with the Silver Supply/Demand Imbalance that is in place.
There must be a hand full of companies that would like to get in with Vizsla somehow.
Looks like a world class silver/pm find that VZLA is securing.
As such............
I would believe either VZLA could be bought outright,
friendly or unfriendly, or VZLA could acquire a solid partner or even two.
Looking for higher silver/pm prices. Fiat currencies are inflated and indebted to the max.

Any thoughts appreciated.
๐Ÿ‘๏ธ0
Oleblue Oleblue 2 months ago
Vizsla Silver Mails Management Information Circular in Connection with Special Meeting to Approve Spinout of Vizsla Royalties

Vancouver, British Columbia (May 22, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) has filed the management information circular (the โ€œCircularโ€) and related meeting materials in connection with the special meeting of shareholders (the โ€œMeetingโ€) to be held on June 17, 2024 at 10:00 a.m. (PST) at 555 Burrard Street, 11th Floor, Suite 1165, Vancouver, British Columbia. The board of directors of the Company set May 13, 2024 as the record date for determining the shareholders entitled to receive notice and vote at the Meeting.

The purpose of the Meeting is to seek approval of the previously announced spinout by way of a plan of arrangement (the โ€œArrangementโ€) between Vizsla Silver and Vizsla Royalties Corp. (โ€œSpincoโ€), whereby the owners of common shares of Vizsla Silver (each a โ€œVizsla Silver Shareโ€) are entitled to receive one-third of a common share of Spinco (the โ€œSpinco Sharesโ€) and one-third of a common share purchase warrant of Spinco (the โ€œSpinco Warrantsโ€) for each Vizsla Silver Share held immediately prior to the closing of the Arrangement. Each full Spinco Warrant will entitle the holder thereof to purchase one Spinco Share at an exercise price of $0.05 per share for a period expiring on the earlier of: (i) 120 days after the date the Spinco Shares and Spinco Warrants are listed on the TSX Venture Exchange (the โ€œTSXVโ€); and (ii) December 31, 2025.

The Arrangement will require approval by at least two-thirds (66.6%) of the votes cast by shareholders present in person or represented by proxy and entitled to vote at the Meeting. Vizsla Silver has obtained an interim order of the Supreme Court of British Columbia (the โ€œCourtโ€). Subject to approval by the Vizsla Silver shareholders, Vizsla Silver will seek a final order from the Court approving the Arrangement. The Company anticipates the Arrangement to close on or about June 24, 2024, and it is expected that shareholders of record on June 21, 2024 will be entitled to receive spinout shares.

Mailing of the management information circular and related meeting materials has commenced and shareholders should receive them shortly. All of the meeting materials can be downloaded from Vizsla Silverโ€™s website at https://vizslasilvercorp.ca and also from the Companyโ€™s profile on SEDAR+ at www.sedarplus.ca.

The deadline for returning proxies for the Meeting is June 15, 2024 at 10:00 a.m. (PST).

This announcement is for informational purposes only and does not constitute a solicitation or a proxy.

Post-Arrangement Matters

Immediately after completion of the Arrangement, shareholders of Vizsla Silver are expected to hold approximately 45% of the issued and outstanding Spinco Shares, while Vizsla Silver will retain the remaining approximately 55%.

Spinco has made an application to list the Spinco Shares and Spinco Warrants on the TSXV. There is no guarantee when, or if, such listings will be completed. Such listings will be subject to Spinco fulfilling all of the listing requirements of the TSXV.

Following closing of the Arrangement, Vizsla Silver and Spinco intend to complete a number of steps, including the following (collectively, the โ€œPost-Closing Stepsโ€): (a) the parties will settle an outstanding loan from Vizsla Silver into Spinco Shares, (b) Vizsla Silver will make an additional $3,500,000 loan to Spinco, (c) Spinco will exercise its buyback right on an underlying royalty on the Panuco Project, after which point the royalty held by Spinco will consist of a 2% net smelter returns royalty on the entire Panuco Project, (d) Spinco will complete a private placement for gross proceeds of at least $3,000,000, and (e) Spinco will complete a consolidation of the Spinco Shares on the basis of one new Spinco Share for every ten old Spinco Shares.

Vizsla Silver and Spinco have entered into a royalty right agreement which provides that, if Vizsla Silver or any of its affiliates acquires any a mineral property within a two-kilometer boundary around the Panuco Project, it must offer Spinco a net smelter returns royalty on such mineral property to Spinco on terms proposed by Vizsla Silver.

The foregoing discussion of the Arrangement and the Post-Closing Steps is intended to provide a general summary only. Shareholders are encouraged to read the Circular in its entirety.

About the Panuco Project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Projectโ€™s mineral resource, as well as test other high priority targets across the district.

In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

NOTE REGARDING FORWARD LOOKING STATEMENTS

The information contained herein contains โ€œforward-looking statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ within the meaning of applicable Canadian securities legislation. โ€œForward-looking informationโ€ includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as โ€œplansโ€, โ€œexpectsโ€, โ€œis expectedโ€, โ€œbudgetโ€, โ€œscheduledโ€, โ€œestimatesโ€, โ€œforecastsโ€, โ€œintendsโ€, โ€œanticipatesโ€, or โ€œbelievesโ€ or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results โ€œmayโ€, โ€œcouldโ€, โ€œwouldโ€, โ€œmightโ€ or โ€œwill be takenโ€, โ€œoccurโ€ or โ€œbe achievedโ€ or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: timing, structure and completion of the Arrangement; the terms of the Arrangement; the Post-Closing Steps; and exploration, development, and production at Panuco.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Companyโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Companyโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Companyโ€™s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Companyโ€™s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Companyโ€™s management team and outside contractors; risks regarding mineral resources and reserves; the Companyโ€™s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Companyโ€™s interactions with surrounding communities and artisanal miners; the Companyโ€™s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption โ€œRisk Factorsโ€ in the Companyโ€™s management discussion and analysis and other public disclosure documents.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

https://mailchi.mp/02106e6c15e2/9q3gdbv5bm-5689072?e=0ca03548e2
๐Ÿ‘๏ธ0
glenn1919 glenn1919 2 months ago
VZLA...................https://stockcharts.com/h-sc/ui?s=VZLA&p=W&b=5&g=0&id=p86431144783
๐Ÿ‘๏ธ0
Oleblue Oleblue 2 months ago
May Presentation

https://vizslasilvercorp.com/site/assets/files/5345/vizsla_ppt_may_2024_final-1.pdf

Weekly Chart
๐Ÿ‘๏ธ0
Oleblue Oleblue 3 months ago
VIZSLA SILVER TO ACQUIRE LARGE CLAIM PACKAGE ALONG HIGHLY PROSPECTIVE STRUCTURAL TREND, SOUTH OF PANUCO

Vancouver, British Columbia (April 16, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) is pleased to announce that it has entered into an agreement to acquire two large claims comprising 10,667.0 Ha (the โ€œEl Richard โ€“ San Enrique claimsโ€ or โ€œSan Enrique prospectโ€) located south and partially adjacent to the Companyโ€™s Panuco project (the โ€œPanuco Projectโ€ or โ€œPanucoโ€). The San Enrique prospect is situated along the highly prospective Panuco โ€“ San Dimas corridor and is covered 100% with LiDAR and partially covered with high-resolution aero-magnetic and radiometric surveys.

Highlights

Large property package comprised of 10,667 Ha just south of Panuco (almost 50% larger than Panuco).
The area is covered with a LiDAR survey and partially covered (~60%) with high-resolution air magnetic and radiometric surveys.
The prospect contains dome complexes and covers the SE extensions of the NW trending Copala fault and Cordon del Oro - Animas veins.
Preliminary recognizance mapping in the NE has identified favourable andesite lithologies, quartz veining and breccias.
The area has never been systematically mapped and prospected.
Vizsla Silver has agreed to issue to the seller US$650,000 in common shares.

โ€œVizsla Silver continues to expand its land position in the Sinaloa Silver Belt with the acquisition of the San Enrique prospect,โ€ stated Michael Konnert, President, and CEO. โ€œThese claims are located southeast along trend from several of our existing mineralised vein corridors, including the high grade Copala structure and they add significant exploration upside potential to Vizslaโ€™s growing portfolio of projects. With preliminary geophysics and LiDAR complete, we intend to move forward with regional recognizance-mapping and a stream-sediment geochemical survey to aid in ongoing drill targeting. Although Vizsla Silver remains committed to the near-term development of the advanced-stage Panuco-Copala district, this acquisition combined with the recently announced La Garra acquisition, further positions Vizsla Silver as a globally significant silver explorer-developer, with the potential to build a multi-generational asset base in Mexico.โ€
Figure 1: Location map of the San Enrique Prospect, Panuco Project and La Garra. See Company news release dated January 8, 2024 on โ€œUpdated Mineral Resource Estimateโ€ for the Panuco project.
Figure 2. Geology of the silver-gold-rich Panuco โ€“ San Dimas corridor.
Figure 3. Map showing the San Enrique prospect with high resolution aero-mag overlain on top of the LiDAR terrain model.

About the San Enrique prospect

The San Enrique prospect area is adjacent to the southern boundary of the Panuco project. The prospect comprises two titled mining claims covering 10,667.0 Ha (El Richard with 3,688.6 Ha and San Enrique with 6,978.4 Ha) in the emerging silver-gold-rich Panuco โ€“ San Dimas corridor with estimated past production plus current resources and reserves of 1.2-Boz Ag and 15-Moz Au (Figure 2).

The LiDAR and mag survey from the San Enrique prospect show strong NW-trending lineaments, indicative of regional faults and fractures. Two of these lineaments are aligned and seem to be the SE extensions of the Copala fault and the Cordon del Oro - Animas vein structures in Panuco (Figure 3). The main lithologies identified to date are predominantly rhyolite domes which produce strong magnetic anomalies in the north, and felsic flows and tuffs (rhyolites and dacites). Recent 40Ar/39Ar age dating on adularia separates from veins in Panuco project indicates that epithermal mineralization post dates felsic volcanism in the area. Additionally, preliminary recognizance mapping in the northeast has revealed the presence of andesite tuffs and flows, quartz veining and breccia structures. The Santa Fe mine is located three kilometres south of San Enrique, is owned and operated by Inca Azteca Gold and is a small scale mine producing high-grade silver and gold from a NW trending epithermal vein. This supports the hypothesis that the NW trending structures within San Enrique have the potential to host additional veins yet to be discovered.

The San Enrique prospect contains several indicators that suggest it is a highly prospective area, namely: location (Panuco โ€“ San Dimas corridor), high-grade deposits immediately north (Copala and Panuco), structural controls (southeast extensions of the Copala fault and Cordon - Animas lineament), domes and an operating mine to the south along another NW regional fault (Santa Fe mine, Inca Azteca).

Vizsla Silver is in the process of acquiring a multispectral World View III satellite image covering the whole Panuco and San Enrique claims to speed up the target generation process. Furthermore, the Company intends to conduct regional recognizance-mapping and a stream-sediment geochemical survey at San Enrique in the near future.

Terms of the Acquisition

The Company entered into an asset purchase agreement (the โ€œAcquisition Agreementโ€) dated March 5, 2024, with Inca Azteca Gold S.A.P.I. de C.V. (the โ€œSellerโ€) and the Companyโ€™s wholly owned subsidiary, Minera Canam, S.A. de C.V. (โ€œMinera Canamโ€) pursuant to which the Company agreed to acquire, through Minera Canam, all of the Sellerโ€™s right, title and interest in and to the mineral concessions (the โ€œAcquisitionโ€).

Pursuant to the Acquisition Agreement, the Company has agreed to issue an aggregate of US$650,000 in common shares in the capital of the Company, at the exchange rate and market price applicable on the effective date (collectively, the โ€œConsideration Sharesโ€) plus any applicable value added tax to the Seller. The Consideration Shares are subject to a four-month hold period pursuant to applicable Canadian securities laws and the Seller has agreed to voluntary resale restrictions, whereby 12.5% of the Consideration Shares will become free trading on the date that is four months and one day from the effective date and an additional 12.5% will become free trading every three months thereafter.

About the Panuco Project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 17,856.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as test other high priority targets across the district.

Qualified Person

In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP., Vice President of Exploration, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.

Information Concerning Estimates of Mineral Resources

The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the โ€œSECโ€). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the โ€œCIM Definition Standardsโ€), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.

You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, โ€œinferred mineral resourcesโ€ are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of โ€œcontained ouncesโ€ in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute โ€œreservesโ€ by SEC standards as in place tonnage and grade without reference to unit measures.

Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the โ€œSEC Modernization Rulesโ€), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of โ€œmeasured mineral resourcesโ€, โ€œindicated mineral resourcesโ€ and โ€œinferred mineral resourcesโ€. Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be โ€œsubstantially similarโ€ to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as โ€œmeasured mineral resourcesโ€, โ€œindicated mineral resourcesโ€ and โ€œinferred mineral resourcesโ€ under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain โ€œForward-Looking Statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ under applicable Canadian securities laws. When used in this news release, the words โ€œanticipateโ€, โ€œbelieveโ€, โ€œestimateโ€, โ€œexpectโ€, โ€œtargetโ€, โ€œplanโ€, โ€œforecastโ€, โ€œmayโ€, โ€œwouldโ€, โ€œcouldโ€, โ€œscheduleโ€ and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at the Panuco Project and the San Enrique prospect, including the potential acquisition of a multispectral World View III satellite image covering the whole Panuco and San Enrique claims and the conduct of regional recognizance-mapping and a stream-sediment geochemical survey at San Enrique.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silverโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect Vizsla Silverโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption โ€œRisk Factorsโ€ in Vizsla Silverโ€™s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

https://finance.yahoo.com/news/vizsla-silver-acquire-large-claim-110000093.html
👍️ 1
glenn1919 glenn1919 4 months ago
VZLA....................................https://stockcharts.com/h-sc/ui?s=VZLA&p=W&b=5&g=0&id=p86431144783
๐Ÿ‘๏ธ0
glenn1919 glenn1919 4 months ago
VZLA....................................https://stockcharts.com/h-sc/ui?s=VZLA&p=W&b=5&g=0&id=p86431144783
๐Ÿ‘๏ธ0
Oleblue Oleblue 4 months ago
VIZSLA SILVER PROVIDES CORPORATE AND ROYALTY UPDATE
CNW Group
Wed, Mar 27, 2024, 7:00 AM EDT10 min read

NYSE: VZLA TSX-V: VZLA

/This news release is not for distribution to U.S. newswire services or for dissemination in the United Shares/

VANCOUVER, BC, March 27, 2024 /CNW/ - Vizsla Silver Corp. (TSXV: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to announce that it has executed an arrangement agreement with Vizsla Royalties Corp. ("Vizsla Royalties"), whereby the business of the Company will be reorganized into two companies by way of a plan of arrangement (the "Arrangement") under the Business Corporations Act (British Columbia). Vizsla Silver shareholders will vote on the Arrangement at a special meeting of shareholders ("Meeting") to be held on a date to be announced. To be effective, the Arrangement must be approved by a special resolution passed by at least 66?% of the votes cast by Vizsla Silver shareholders present in person or represented by proxy at the Meeting, which shareholders are entitled to one vote for each Vizsla Silver share held.

Vizsla Silver Corp. logo (CNW Group/Vizsla Silver Corp.)
Vizsla Silver Corp. logo (CNW Group/Vizsla Silver Corp.)
The Arrangement involves, among other things, the distribution of common shares (the "Vizsla Royalties Shares") and warrants of Vizsla Royalties (the "Vizsla Royalties Warrants") to Vizsla Silver shareholders such that each shareholder as of a particular date, immediately prior to closing of the transaction (the "Record Date") will receive 1/3 of a Vizsla Royalties Share and 1/3 of a Vizsla Royalties Warrant for each common share of Vizsla Silver (the "Vizsla Silver Shares") held as of the Record Date. Vizsla Silver warrants will also be adjusted and Vizsla Silver options will be replaced pursuant to the Arrangement as described in more detail in the information circular ("Circular") that will be mailed to shareholders prior to the Meeting.

After careful consideration, the Board of Directors has unanimously determined that the Arrangement is fair to shareholders and is in the best interests of the Company. A description of the various factors considered by the Board of Directors in arriving at this determination will be provided in the Circular.

ATM Program

The Company also announces that it has entered into an equity distribution agreement (the "Distribution Agreement") with Canaccord Genuity Corp. ("Canaccord Genuity") and filed a Prospectus Supplement (as defined below) in respect of an at-the-market equity program (the "ATM Program").

The ATM Program allows the Company to issue and sell up to C$50,000,000 of Vizsla Silver Shares from treasury to the public, from time to time, through Canaccord Genuity, at the Company's discretion and in accordance with the terms and conditions of the Distribution Agreement. All Vizsla Silver Shares issued under the ATM Program will be sold in transactions that are deemed to be "at-the-market distributions" as defined in National Instrument 44-102 โ€“ Shelf Distributions, including sales made directly on the TSX Venture Exchange or on any other "marketplace" (as defined in National Instrument 21-101 โ€“ Marketplace Operation) in Canada, and/or any other method permitted by applicable law, at the prevailing market price at the time of sale and, as such, prices may vary among purchasers during the period of the ATM Program.

"It is prudent for Vizsla Silver to have an ATM Program available for optionality," commented Michael Konnert, President & CEO. "The Company never utilized the ATM that it had in place from April 2021 until March 2023. The Company does not expect to use the ATM Program in the regular course of business."

The ATM Program is intended to provide the Company with additional financing flexibility should it be required in the future. The volume and timing of distributions under the ATM Program, if any, will be determined in the Company's sole discretion. Distributions of the Vizsla Silver Shares under the ATM Program will be made pursuant to the terms and conditions of the Distribution Agreement.

The ATM Program will be effective until the earlier of the date on which (i) the issuance and sale of all of the Vizsla Silver Shares issuable pursuant to the ATM Program have been completed, and (ii) the receipt issued for the Shelf Prospectus (as defined below) ceases to be effective, unless earlier terminated prior to such date by the Company or Canaccord Genuity in accordance with the terms of the Distribution Agreement. The Company intends to use the net proceeds from the ATM Program, if any, for general corporate purposes and working capital needs. The Company will pay Canaccord Genuity a cash fee equal to 3% of the gross proceeds of Vizsla Silver Shares sold under the Distribution Agreement.

The offering of Vizsla Silver Shares under the ATM Program is qualified by a prospectus supplement dated March 26, 2024 (the "Prospectus Supplement") to the short form base shelf prospectus dated March 31, 2023 (the "Shelf Prospectus"), which were each filed with the applicable securities regulatory authorities in each of the provinces and territories in Canada. The Distribution Agreement, the Prospectus Supplement and the Shelf Prospectus are available on the System for Electronic Document Analysis and Retrieval + website at www.sedarplus.ca. Alternatively, Canaccord Genuity will send copies of the Distribution Agreement, the Prospectus Supplement and the Shelf Prospectus upon request by contacting Canaccord Genuity at: Canaccord Genuity Corp., Suite 2100, 40 Temperance Street, Toronto, Ontario M5H 0B4 or by email at ecm@cgf.com.

This news release does not constitute an offer to sell or the solicitation of an offer to buy the Vizsla Silver Shares, nor shall there be any sale of the Vizsla Silver Shares in any province, state or jurisdiction in which such an offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of any such province, state or jurisdiction.

About the Panuco Project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on derisking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project's mineral resource, as well as test other high priority targets across the district.

Qualified Person

In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP., Vice President of Exploration, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

The information contained herein contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Forward-looking statements in this news release include, among other things, statements regarding the Arrangement, including statements regarding the Meeting and the Circular, the issuance, sale and distribution of Vizsla Silver Shares pursuant to the ATM Program, including the price, volume and timing of any distributions; the intended use of net proceeds from the ATM Program, if any; and other statements that are not historical facts.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Company's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption "Risk Factors" in the Company's annual information form and other public disclosure documents.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

SOURCE Vizsla Silver Corp.

https://finance.yahoo.com/news/vizsla-silver-provides-corporate-royalty-110000400.html
๐Ÿ‘๏ธ0
Oleblue Oleblue 4 months ago
VIZSLA SILVER AGREES TO ACQUIRE NEWLY CONSOLIDATED PAST-PRODUCING SILVER DISTRICT IN THE EMERGING SILVER-GOLD-RICH PANUCO - SAN DIMAS CORRIDOR IN MEXICO
PR Newswire
Thu, Mar 28, 2024, 9:42 AM EDT17 min read

VANCOUVER, BC, March 28, 2024 /PRNewswire/ - Vizsla Silver Corp. (TSXV: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to announce that it has entered into an agreement to acquire the past-producing La Garra-Metates district (the "La Garra-Metates District" or "La Garra") situated in the heart of the silver-gold-rich Panuco โ€“ San Dimas corridor. Reconnaissance work conducted by Vizsla Silver's geologists shows the presence of at least two vein systems with respective strike lengths of 2.6 km and 1.8 km carrying significant silver and gold grades.

Highlights

Large property package at 16,962 Ha (more than 2x the area of the Company's Panuco project (the "Panuco Project")).

While this district has seen past production dating back centuries, the La Garra-Metates District has seen minimal exploration and no drilling.

Vizsla Silver's sampling demonstrated multi-kilo silver equivalent grades over several kilometers of strike.

Epithermal vein systems trending N-NNW in a geological setting akin that of the Panuco Project and First Majestics Silver Corp.'s San Dimas project ("San Dimas").

Potential for high-grade shoots along-strike and at depth on two known vein systems with estimated strike length of 2.6 km and 1.8 km, respectively.

Significant potential to discover new veins given the underexplored nature of the district.

The La Garra-Metates District has been acquired for less than 3% of Vizsla Silver's market capitalization.

"Vizsla Silver has agreed to acquire another highly prospective precious metals rich district in the Sinaloa Silver Belt, marking the first time that the La Garra-Metates District has ever been in a public company." Stated Michael Konnert, President, and CEO. "The consolidation and acquisition of a vastly under-explored, past-producing district in the state of Sinaloa is an excellent addition to our portfolio and demonstrates our strength in the region. Similar to our flagship Panuco Project, which represents one of the largest, undeveloped, high-grade silver primary assets globally, La Garra hosts sub-vertical structures reminiscent of Vizsla Silver's Napoleon vein, as well as flat-lying structures like Copala. Additionally, the La Garra-Metates District is located ~32 kilometers to the south of First Majestic Silver's San Dimas Mine, a prolific precious metals producer and is one of nine billion-ounce silver equivalent districts in Mexico. Vizsla Silver has a long-term view of its role in the silver industry and within this region of Mexico. We believe we have the potential to build a multi-generational asset base and become a globally significant producer of silver in Sinaloa. While Vizsla Silver's focus continues to be to develop the Panuco-Copala district while exploring for new centers of high-grade mineralization, this acquisition allows for new major discoveries in the future and a growing pipeline of potential production as we continue to generate a dominant footprint in this emerging, but globally significant silver-belt."

https://finance.yahoo.com/news/vizsla-silver-agrees-acquire-newly-134200429.html
๐Ÿ‘๏ธ0
glenn1919 glenn1919 4 months ago
VZLA.......................https://stockcharts.com/h-sc/ui?s=VZLA&p=W&b=5&g=0&id=p86431144783
๐Ÿ‘๏ธ0
glenn1919 glenn1919 5 months ago
VZLA...............................https://stockcharts.com/h-sc/ui?s=VZLA&p=W&b=5&g=0&id=p86431144783
๐Ÿ‘๏ธ0
Oleblue Oleblue 5 months ago
VIZSLA SILVER ANNOUNCES CLOSING OF $34.5 MILLION BOUGHT DEAL FINANCING
CNW Group
Thu, Feb 29, 2024, 8:33 AM EST

/NOT FOR DISSEMINATION IN THE US OR THROUGH US NEWSWIRE SERVICES/

NYSE: VZLA TSX-V: VZLA

VANCOUVER, BC, Feb. 29, 2024 /CNW/ - Vizsla Silver Corp. (TSXV: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to announce that it has completed its previously announced bought deal prospectus offering of 23,000,000 common shares of the Company (the "Offered Shares") at a price of C$1.50 per Offered Share for aggregate gross proceeds of C$34,500,000, which includes the exercise in full of the Underwriters' (as defined below) over-allotment option for 3,000,000 Offered Shares (the "Offering").

Vizsla Silver Corp. logo (CNW Group/Vizsla Silver Corp.)
The Offering was conducted by PI Financial Corp., as lead underwriter and sole bookrunner, and Canaccord Genuity Corp., CIBC World Markets Inc., Raymond James Ltd., Stifel Nicolaus Canada Inc. and BMO Nesbitt Burns Inc. (collectively, the "Underwriters"). In consideration for the services provided by the Underwriters in connection with the Offering, the Company paid to the Underwriter a cash commission equal to 6% of the gross proceeds raised under the Offering. As further consideration for the services provided by the Underwriters in connection with the Offering, the Company issued compensation warrants to the Underwriters, exercisable at any time on or before February 28, 2026, to acquire that number of common shares of the Company which is equal to 6% of the number of Offered Shares sold under the Offering at an exercise price of C$1.50. The Offering was completed pursuant to a prospectus supplement dated February 23, 2024 to the short form base shelf prospectus of the Company dated March 31, 2023 in each of the provinces and territories of Canada (except Quebec), in the United States on a private placement basis pursuant to an exemption from the registration requirements of the U.S. Securities Act of 1933, as amended (the "U.S. Securities Act") and applicable state securities laws and other jurisdictions outside of Canada and the United States on an exempt basis. The Offering remains subject to the final approval of the TSX Venture Exchange (the "TSX-V").

The net proceeds of the Offering will be used to advance the exploration, drilling and development of the Company's Panuco Project, as well as for working capital and general corporate purposes.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the U.S. Securities Act or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

This news release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful.

About the Panuco project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits. The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq. The indicated mineral resource is estimated at 9.5 million tonnes ("Mt") grading 289 grams per tonne ("g/t") silver, 2.41 g/t gold, 0.27% lead, and 0.84% zinc (511 g/t silver equivalent). The mineral resource estimate includes indicated mineral resources of 88.2 million ounces ("Moz") of silver, 736 thousand ounces ("koz") of gold, 25.4 kilotonnes ("kt") of lead, and 79.9 kt of zinc (155.8 Moz AgEq). The inferred mineral resource is estimated at 12.2 Mt grading 239 g/t silver, 1.93 g/t gold, 0.29% lead, and 1.03% zinc (433 g/t AgEq). The mineral resource estimate includes inferred mineral resources of 93.7 Moz of silver, 758 koz of gold, 35.4 kt of lead, and 125.3 kt of zinc (169.6 Moz AgEq). Silver equivalent is calculated using the following formula: AgEq = Ag ppm + (((Au ppm x Au price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Ag price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Panuco Project's mineral resource, as well as test other high priority targets across the district.

In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

The information contained herein contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: the intended use of the net proceeds of the Offering, receipt of final TSX-V approval; and future drilling and exploration activities at the Panuco Project.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Company's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption "Risk Factors" in the Company's management discussion and analysis and other public disclosure documents.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

SOURCE Vizsla Silver Corp.
๐Ÿ‘๏ธ0
kingclever kingclever 5 months ago
VZLA back on the radar!
๐Ÿ‘๏ธ0
Oleblue Oleblue 5 months ago
Vizsla Silver Announces $30 Million Bought Deal Financing
PI Financial Corp.
Wed, Feb 21, 2024, 7:15 AM EST9 min read

In This Article:
VZLA
-1.35%
NOT FOR DISSEMINATION IN THE US OR THROUGH US NEWSWIRE SERVICES

VANCOUVER, British Columbia, Feb. 21, 2024 (GLOBE NEWSWIRE) -- Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) is pleased to announce that it has entered into an agreement with PI Financial Corp. as sole bookrunner and lead underwriter, on its own behalf and on behalf of a syndicate of underwriters (the โ€œUnderwritersโ€), pursuant to which the Underwriters have agreed to purchase, on a โ€œbought dealโ€ basis, 20,000,000 common shares (the โ€œSharesโ€) of the Company at a price of $1.50 per Share for aggregate gross proceeds of $30,000,000 (the โ€œOfferingโ€), excluding additional proceeds raised from the exercise of the Over-Allotment Option (defined below).

The Company has agreed to grant the Underwriters an option to cover over-allotments (the โ€œOver-Allotment Optionโ€), which will allow the Underwriters to purchase up to an additional 15% of the Shares sold pursuant to the Offering, on the same terms as the Offering. The Over-Allotment Option may be exercised in whole or in part at any time, for a period of 30 days after the Closing Date (as defined herein).

The net proceeds from the Offering will be used to advance the exploration, drilling and development of the Companyโ€™s Panuco Project, as well as for working capital and general corporate purposes. The Shares will be offered in each of the provinces and territories of Canada (other than the Province of Quebec) by way of a prospectus supplement to the Companyโ€™s base shelf prospectus dated March 31, 2023, which will be filed with the securities regulators in each of the provinces and territories of Canada, and may also be offered by way of private placement in the United States and such other jurisdictions as agreed between the parties.

The closing of the Offering is anticipated to occur on or about February 29, 2024 (the โ€œClosing Dateโ€) and is subject to certain conditions including, but not limited to, the receipt of all necessary regulatory approvals, including the acceptance of the TSX Venture Exchange.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the โ€œU.S. Securities Actโ€) or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

This news release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful.

About the Panuco project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits. The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq. The indicated mineral resource is estimated at 9.5 million tonnes (โ€œMtโ€) grading 289 grams per tonne (โ€œg/tโ€) silver, 2.41 g/t gold, 0.27% lead, and 0.84% zinc (511 g/t silver equivalent). The mineral resource estimate includes indicated mineral resources of 88.2 million ounces (โ€œMozโ€) of silver, 736 thousand ounces (โ€œkozโ€) of gold, 25.4 kilotonnes (โ€œktโ€) of lead, and 79.9 kt of zinc (155.8 Moz AgEq). The inferred mineral resource is estimated at 12.2 Mt grading 239 g/t silver, 1.93 g/t gold, 0.29% lead, and 1.03% zinc (433 g/t AgEq). The mineral resource estimate includes inferred mineral resources of 93.7 Moz of silver, 758 koz of gold, 35.4 kt of lead, and 125.3 kt of zinc (169.6 Moz AgEq). Silver equivalent is calculated using the following formula: AgEq = Ag ppm + (((Au ppm x Au price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Ag price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Projectโ€™s mineral resource, as well as test other high priority targets across the district.

In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer

Tel: (604) 364-2215

Email: info@vizslasilver.ca

Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

The information contained herein contains โ€œforward-looking statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ within the meaning of applicable Canadian securities legislation. โ€œForward-looking informationโ€ includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as โ€œplansโ€, โ€œexpectsโ€, โ€œis expectedโ€, โ€œbudgetโ€, โ€œscheduledโ€, โ€œestimatesโ€, โ€œforecastsโ€, โ€œintendsโ€, โ€œanticipatesโ€, or โ€œbelievesโ€ or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results โ€œmayโ€, โ€œcouldโ€, โ€œwouldโ€, โ€œmightโ€ or โ€œwill be takenโ€, โ€œoccurโ€ or โ€œbe achievedโ€ or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: the filing of a prospectus supplement for the Offering, the timing, structure, activities and completion of the Offering; the use of proceeds from the Offering, the Over-Allotment Option; and exploration and development at Panuco.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Companyโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Companyโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Companyโ€™s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Companyโ€™s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Companyโ€™s management team and outside contractors; risks regarding mineral resources and reserves; the Companyโ€™s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Companyโ€™s interactions with surrounding communities and artisanal miners; the Companyโ€™s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption โ€œRisk Factorsโ€ in the Companyโ€™s management discussion and analysis and other public disclosure documents.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
๐Ÿ‘๏ธ0
Oleblue Oleblue 5 months ago
VIZSLA SILVER ANNOUNCES UPDATE ON ROYALTY SPINOUT
Vancouver, British Columbia (February 12, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) is pleased to announce that, further to its news release dated January 17, 2024, it intends to enter into an arrangement agreement with its wholly-owned subsidiary Vizsla Royalties Corp. (โ€œSpincoโ€) within 45 days of this news release in respect of the spinout of the shares of Spinco to the Companyโ€™s shareholders (the โ€œSpinoutโ€). Spinco currently holds, indirectly, a net smelter royalty on any future mineral production at Vizsla Silverโ€™s flagship, 100% owned Panuco silver-gold project located in Mexico.

The Company further announces that holders of its common shares (the โ€œVizsla Silver Sharesโ€) will be entitled to 1/3 of a common share of Spinco and 1/3 of a common share purchase warrant of Spinco for each Vizsla Silver Share held on the share distribution record date.

Additional details regarding the Spinout, including the share distribution record date, will be disclosed as they become available.

Shareholders are invited to contact Vizsla Silver via email at info@vizslasilver.ca for additional information regarding the Spinout.

About the Panuco Project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project's mineral resource, as well as test other high priority targets across the district.

In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

The information contained herein contains โ€œforward-looking statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ within the meaning of applicable Canadian securities legislation. โ€œForward-looking informationโ€ includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as โ€œplansโ€, โ€œexpectsโ€, โ€œis expectedโ€, โ€œbudgetโ€, โ€œscheduledโ€, โ€œestimatesโ€, โ€œforecastsโ€, โ€œintendsโ€, โ€œanticipatesโ€, or โ€œbelievesโ€ or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results โ€œmayโ€, โ€œcouldโ€, โ€œwouldโ€, โ€œmightโ€ or โ€œwill be takenโ€, โ€œoccurโ€ or โ€œbe achievedโ€ or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: timing, structure and completion of the Spinout; the terms of the Spinout; and exploration, development, and production at Panuco.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Companyโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Companyโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Companyโ€™s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Companyโ€™s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Companyโ€™s management team and outside contractors; risks regarding mineral resources and reserves; the Companyโ€™s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Companyโ€™s interactions with surrounding communities and artisanal miners; the Companyโ€™s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption โ€œRisk Factorsโ€ in the Companyโ€™s management discussion and analysis and other public disclosure documents.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
๐Ÿ‘๏ธ0
Oleblue Oleblue 6 months ago
VIZSLA SILVER ADDS UNPARALLELED MINE-BUILDING
AND OPERATING EXPERTISE, APPOINTS SIMON CMRLEC
TO THE ROLE OF COO
Vancouver, British Columbia (January 30, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) is pleased to announce Simon Cmrlec will be joining Vizsla Silver as Chief Operating Officer (โ€œCOOโ€). Mr. Cmrlec is a highly experienced senior engineer with over 30-years of industry experience who has been a director of Vizsla Silver since its formation and has most recently held the position of Chief Operating Officer of Ausenco, a global mining engineering and consulting firm. He has extensive experience in building mining projects around the world and across a number of different commodities and will be tasked with advancing Vizsla Silverโ€™s world-class Panuco silver-gold Project towards production, with the goal of becoming one of the worldโ€™s largest single-asset silver producers. Mr. Cmrlec commences the role on April 1, 2024.
โ€œSimon has been involved with Vizsla Silver since its inception, preceding the acquisition of the Panuco-Copala District,โ€ commented Michael Konnert, President & CEO. โ€œHis guidance as a director has been invaluable in establishing the culture and direction of the Company. Now, we are honoured to welcome him as the incoming Chief Operating Officer as we embark on the next stage of development for the Panuco Project. We thank Martin for all of his contributions and wish him the best in his future endeavours.โ€

โ€œI am delighted to work closely with Mike and our excellent Vizsla team as we de-risk and develop the worldโ€™s next tier one silver asset,โ€ commented Simon Cmrlec. โ€œProjects that are as well endowed as Panuco are rare and itโ€™s a privilege to be part of its future.โ€
Mr. Cmrlec began his career with Western Mining Corporation (WMC) at its Olympic Dam Mine in South Australia where he held several technical and operations roles. He was an Owners Representatives for the Olympic Dam Expansion Project (ODP) where he supported the design, construction and commissioning of the Smelter and Hydrometallurgical facilities. Following the completion of the ODP project Mr. Cmrlec joined Kvaerner and was involved in the construction and commissioning of various base metals, iron ore and gold projects in the US, South America, Middle East and South Africa. In 2001, he joined Inco on the Goro Nickel project in New Caledonia as the Project Manager responsible for the Refinery facility. Mr. Cmrlec held a number of roles on the Goro Nickel project including Senior Project Manager and Construction director in his eight years there. Mr. Cmrlec joined Ausenco in 2009 as the Manager, Project Delivery before assuming the role of President APAC/Africa. In 2015, Mr. Cmrlec moved to Canada and became Ausencoโ€™s President North America before transitioning to President Americas in 2017 and the Chief Operating Officer in 2019.

Mr. Cmrlec graduated with a B.Eng (Hons) in Metallurgical Engineering from the Gartrell School of Mining, Metallurgy and Applied Geology at the University of South Australia in 1994.

Mr. Cmrlec will replace Martin Dupuis, who is no longer with the Company. We want to thank Mr. Dupuis for his many contributions, which have helped advance the Panuco project through its maiden resource and two subsequent resource updates.

About the Panuco Project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 7,189.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco (the โ€œUpdated Mineral Resourceโ€). The Updated Mineral Resource includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq. An updated technical report is being prepared on the updated Mineral Resource Estimate in accordance with National Instrument 43-101 โ€“ Standards of Disclosure for Mineral Projects and will be available on the Companyโ€™s website and SEDAR within 45 days of the date of announcement of the Updated Mineral Resource.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project's mineral resource, as well as test other high priority targets across the district.

Information Concerning Estimates of Mineral Resources

The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the โ€œSECโ€). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the โ€œCIM Definition Standardsโ€), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.

You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, โ€œinferred mineral resourcesโ€ are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of โ€œcontained ouncesโ€ in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute โ€œreservesโ€ by SEC standards as in place tonnage and grade without reference to unit measures.

Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the โ€œSEC Modernization Rulesโ€), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of โ€œmeasured mineral resourcesโ€, โ€œindicated mineral resourcesโ€ and โ€œinferred mineral resourcesโ€. Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be โ€œsubstantially similarโ€ to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as โ€œmeasured mineral resourcesโ€, โ€œindicated mineral resourcesโ€ and โ€œinferred mineral resourcesโ€ under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain โ€œForward-Looking Statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ under applicable Canadian securities laws. When used in this news release, the words โ€œanticipateโ€, โ€œbelieveโ€, โ€œestimateโ€, โ€œexpectโ€, โ€œtargetโ€, โ€œplanโ€, โ€œforecastโ€, โ€œmayโ€, โ€œwouldโ€, โ€œcouldโ€, โ€œscheduleโ€ and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including plans for resource/discovery-based drilling designed to upgrade and expand the mineral resource.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla, future growth potential for Vizsla and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; Vizslaโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect Vizslaโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; the ongoing military conflict in Ukraine; general economic facts; and the factors identified under the caption โ€œRisk Factorsโ€ in Vizsla Silverโ€™s management discussion and analysis and other public disclosure documents. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
๐Ÿ‘๏ธ0
Oleblue Oleblue 6 months ago
VIZSLA SILVER TO SPIN OUT NET SMELTER
ROYALTY TO SHAREHOLDERS
Vancouver, British Columbia (January 17, 2024) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) is pleased to announce its intention to spin out the shares of Vizsla Royalties Corp. (โ€œVizsla Royaltiesโ€), a wholly-owned subsidiary of Vizsla Silver, to the Companyโ€™s shareholders (the โ€œSpinoutโ€). Vizsla Royalties currently holds, indirectly, a net smelter royalty (the โ€œRoyaltyโ€) on any potential future mineral production at Vizsla Silverโ€™s flagship, 100% owned Panuco silver-gold project located in Sinaloa, Mexico (the โ€œProjectโ€ or โ€œPanucoโ€).

The Royalty consists of: (i) a 2.0% net smelter return royalty on certain unencumbered concessions comprising the Project; and (ii) a 0.5% net smelter return royalty on certain encumbered concessions comprising the Project which have a pre-existing 3.0% net smelter return royalty (the โ€œUnderlying Royaltyโ€).

Vizsla Silver is also expected to: (i) transfer to Vizsla Royalties the right to purchase one-half of the 3% Underlying Royalty; (ii) grant Vizsla Royalties the right to acquire a royalty on any future projects acquired by Vizsla Silver in the 24-month period after completion of the Spinout, which right would automatically terminate upon a change of control of Vizsla Royalties or Vizsla Silver and (iii) make a cash injection into Vizsla Royalties.

It is expected that the Spinout will be completed pursuant to a plan of arrangement under the Business Corporations Act (British Columbia). The Spinout would be subject to shareholder, court, stock exchange and regulatory approvals, as well as, at managementโ€™s continued discretion. Pursuant to the Spinout, common shares of Vizsla Royalties would be distributed to shareholders of Vizsla Silver. Vizsla Silver is expected to hold approximately a 49% ownership interest in Vizsla Royalties, with the remaining shares of Vizsla Royalties being distributed to shareholders of Vizsla Silver on a pro-rata basis at a time to be determined by the board of directors of Vizsla Silver. There will be no change in shareholdersโ€™ holdings in Vizsla Silver as a result of the Spinout.

Subsequent to completion of the Spinout, the board of directors of Vizsla Royalties (the โ€œVizsla Royalties Boardโ€) may decide to pursue a listing on the TSX Venture Exchange if and when the Vizsla Royalties Board determines it is in the best interests of the Vizsla Royalties shareholders. It is expected that, at the time Vizsla Royalties pursues a listing on the TSX Venture Exchange, a majority of the members of its management team and the Vizsla Royalties Board will be independent of Vizsla Silver.

Additional details regarding the Spinout, including the proposed record date, will be provided as they become available. There is no certainty Vizsla Silver will proceed with the Spinout.

Shareholders are invited to contact Vizsla Silver via email at info@vizslasilver.ca for additional information regarding the Spinout.

About the Panuco Project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco (the โ€œUpdated Mineral Resourceโ€). The Updated Mineral Resource includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq. An updated technical report is being prepared on the updated Mineral Resource Estimate in accordance with National Instrument 43-101 โ€“ Standards of Disclosure for Mineral Projects and will be available on the Companyโ€™s website and SEDAR within 45 days of the date of announcement of the Updated Mineral Resource.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project's mineral resource, as well as test other high priority targets across the district.

In accordance with National Instrument 43-101 โ€“ Standards of Disclosure for Mineral Projects, Martin Dupuis, P.Geo., Chief Operating Officer, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

The information contained herein contains โ€œforward-looking statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ within the meaning of applicable Canadian securities legislation. โ€œForward-looking informationโ€ includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as โ€œplansโ€, โ€œexpectsโ€, โ€œis expectedโ€, โ€œbudgetโ€, โ€œscheduledโ€, โ€œestimatesโ€, โ€œforecastsโ€, โ€œintendsโ€, โ€œanticipatesโ€, or โ€œbelievesโ€ or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results โ€œmayโ€, โ€œcouldโ€, โ€œwouldโ€, โ€œmightโ€ or โ€œwill be takenโ€, โ€œoccurโ€ or โ€œbe achievedโ€ or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: timing, structure and completion of the Spinout; the transfer of assets from Vizsla Silver to Vizsla Royalties; the timing and receipt of required shareholder, court, stock exchange and regulatory approvals for the Spinout; the retained ownership interest of Vizsla Silver in Vizsla Royalties; the terms of the Spinout; the listing of Vizsla Royalties on the TSX Venture Exchange; and exploration, development, and production at Panuco.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Companyโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Companyโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Companyโ€™s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Companyโ€™s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Companyโ€™s management team and outside contractors; risks regarding mineral resources and reserves; the Companyโ€™s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Companyโ€™s interactions with surrounding communities and artisanal miners; the Companyโ€™s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption โ€œRisk Factorsโ€ in the Companyโ€™s management discussion and analysis and other public disclosure documents.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
๐Ÿ‘๏ธ0
Oleblue Oleblue 6 months ago
Updated Mineral Resource Estimate

๐Ÿ‘๏ธ0
Oleblue Oleblue 7 months ago
VIZSLA SILVER ANNOUNCES SIGNIFICANT INCREASE IN CONTAINED OUNCES AND INCREASE IN GRADE OF INDICATED CATEGORY TO 551 G/T AGEQ IN UPDATED MINERAL RESOURCES ESTIMATE
Vancouver, British Columbia (January 8, 2024) โ€“ Vizsla Silver Corp. (NYSE: VZLA) (TSX-V: VZLA) (Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) is pleased to announce an updated mineral resource estimate (โ€œUpdated Mineral Resource Estimateโ€) for its flagship, 100% owned Panuco silver-gold project (the โ€œProjectโ€ or โ€œPanucoโ€) located in Sinaloa, Mexico. The Updated Mineral Resource Estimate was completed by Allan Armitage, Ph.D., P.Geo., of SGS Geological Services.

Highlights of the Updated Mineral Resource Estimate, including a comparison to the previous mineral resource estimate released in January 2023:
48.7% increase in indicated mineral resources from 104.8 to 155.8 Moz AgEq
48.7% increase in inferred mineral resources from 114.1 to 169.6 Moz AgEq
17% increase in average indicated mineral resource grade from 437 to 511 g/t AgEq
New addition of La Luisa containing 4.0 Moz AgEq indicated and 25.3 Moz AgEq of Inferred Resources
Key Statistics:
The Updated Mineral Resource represents less than 10% of the known vein strike of the newly consolidated district
90% of the value of the Updated Mineral Resource Estimate is comprised of precious metals, including 56% from silver
A total of 11 epithermal veins were included in the Updated Mineral Resource Estimate
Total all-in exploration cost of US$0.32/oz AgEq discovered
Indicated Mineral Resources are estimated at 9.5 million tonnes (โ€œMtโ€) grading 289 grams per tonne (โ€œg/tโ€) silver, 2.41 g/t gold, 0.27% lead, and 0.84% zinc (511 g/t silver equivalent (โ€œAgEqโ€)). The Updated Mineral Resource Estimate includes indicated mineral resources of 88.2 million ounces (โ€œMozโ€) of silver, 736 thousand ounces (โ€œkozโ€) of gold, 25.4 kilotonnes (โ€œktโ€) of lead, and 79.9 kt of zinc (155.8 Moz AgEq).

Inferred Mineral Resources are estimated at 12.2 Mt grading 239 g/t silver, 1.93 g/t gold, 0.29% lead, and 1.03% zinc (433 g/t AgEq). The Updated Mineral Resource Estimate includes inferred mineral resources of 93.7 Moz of silver, 758 koz of gold, 35.4 kt of lead, and 125.3 kt of zinc (169.6 Moz AgEq).

The Updated Mineral Resource Estimate is centred on the western portion of Panuco, encompassing ~8 km of the known 86 km of cumulative vein strike in the district. The Updated Mineral Resource Estimate includes 178 new infill/expansion holes (100,222 metres) completed by Vizsla Silver between September 2022 and September 2023. In total, the Updated Mineral Resource Estimate is based on a total drill database of 822 holes (302,931 metres) completed by Vizsla Silver since November 2019.
โ€œWe are pleased to announce another significant resource update milestone for the high-grade Panuco silver gold district,โ€ commented Michael Konnert, President and CEO. โ€œAlthough substantial, this update represents only a moment in time at the Project, as drills continue to turn in 2024.โ€

โ€œThe Projectโ€™s indicated resource now stands at 88 million ounces of silver and 736 thousand ounces of gold, while the inferred resource contains 94 million ounces of silver and 758 thousand ounces of gold. This represents a 49% increase in both indicated and inferred ounces and a 17% increase in indicated grade relative to the previous estimate. Resource focused drilling throughout 2023 was successful in converting almost half of the January 2023 inferred resource to the indicated category while exploration drilling added new resources at both Copala and Napoleon. The bulk of this yearโ€™s resource growth came from the Napoleon Area, largely driven by the inclusion of La Luisa, which added an additional 25Moz AgEq in inferred mineralization.โ€

โ€œWhatโ€™s most impressive is that although we continue to expand the Projectโ€™s mineral inventory year after year, our current resource still accounts for less than 10% of the known veins we have in the district. Going forward, we will focus on de-risking and advancing the high-grade resource in the west towards development, taking advantage of the Projectโ€™s incredible infrastructure, while simultaneously hunting for the next epicenter of mineralization in the central and eastern portions of the district. This is an outstanding achievement that comes as a result of hard work and perseverance. I want to thank everyone from the entire Vizsla team, including our contractors and local communities, and look forward to another successful year in 2024.โ€
Vizsla Silver will be hosting a webcast to discuss the Updated Mineral Resource Estimate at 10:00am PT on Thursday, January 11th, 2024. To register, please click here.

A technical report is being prepared on the Updated Mineral Resource Estimate in accordance with National Instrument 43-101 (โ€œNI-43-101โ€) and will be available on the Companyโ€™s website and SEDAR within 45 days of the date of this release. The effective date of the Updated Mineral Resource Estimate is September 1, 2023.

Panuco Project Resource Summary (150 g/t AgEq cut-off)

Panuco Project Indicated & Inferred Mineral Resource Summary by Vein (150 g/t AgEq cut-off)

*Animas is Rosarito and Cuevillas veins
Panuco Project Indicated & Inferred Mineral Resource Sensitivity Table

Note:
1AgEq = Ag ppm + (((Au ppm x Au price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Ag price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.
2AuEq = Au ppm + (((Ag ppm x Ag price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Au price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.
Panuco Project Updated Mineral Resource Estimate Notes:
The classification of the Updated Mineral Resource Estimate into indicated and inferred mineral resources is consistent with current 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves. The effective date for the Updated Mineral Resource Estimate is September 1, 2023.
All figures are rounded to reflect the relative accuracy of the estimate and numbers may not add due to rounding.
All mineral resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.
Mineral resources are not mineral reserves. Mineral resources which are not mineral reserves, do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
The database comprises a total of 822 drill holes for 302,931 metres of drilling completed by Vizsla Silver between November 2019 and September 2023.
The mineral resource estimate is based on 28 three-dimensional (โ€œ3Dโ€) resource models, constructed in Leapfrog, representing the Napoleon area (15 wireframes), the Copala area (7 wireframes), Tajitos (1 wireframe), Animas (5 wireframes) and San Antonio (1 wireframe).
Silver, gold, lead and zinc were estimated for each mineralization domain in the Panuco Project. Blocks within each mineralized domain were interpolated using 1.5 metre capped composites assigned to that domain. To generate grade within the blocks, the inverse distance squared (ID2) interpolation method was used for all domains. All estimates are based on variable block dimensions (by deposit area) and estimation search parameters (by domain).
Average density values were assigned per zone based on 1,919 samples analysed by ALS in Zacatecas, Mexico or inhouse with 5% checks by ALS.
It is envisioned that the Panuco Project deposits may be mined using underground mining methods. Mineral resources are reported at a base case cut-off grade of 150 g/t AgEq. The mineral resources grade blocks were quantified above the base case cut-off grade, below surface and within the constraining mineralized wireframes.
The base-case AgEq Cut-off grade considers metal prices of $24.00/oz Ag, $1800/oz Au, $2425/t Pb and $2976/t Zn and considers metal recoveries of 93% for silver, 90% for gold, 94% for Pb and 94% for Zn.
The base case cut-off grade of 150 g/t AgEq considers a mining cost of US$45.00/t rock and processing, treatment and refining, transportation and G&A cost of US$50.00/t of mineralized material.
The Updated Mineral Resource Estimate may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
The Company remains well-funded for its ongoing +65,000 metre 2024 drill program with four drill rigs designed to upgrade and expand the Projectโ€™s resource base and test high priority targets located in the west, central and eastern areas of the district. Dependent on ongoing exploration success, the Company plans to publish a further update to the Updated Mineral Resource Estimate in the second half of 2024.

Discovery Costs

To date, the Company has incurred an aggregate of approximately US$103.0 million in exploration expenditures over the life of the Project. This equates to an estimated discovery cost per silver equivalent ounce of US$0.32 for resources defined in the Updated Mineral Resource Estimate.

About the Panuco project

The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlรกn. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 310,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Projectโ€™s mineral resource, as well as test other high priority targets across the district.

Quality Assurance / Quality Control

Drill core and rock samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver. The ALS Zacatecas and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption (โ€œAAโ€) spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish.

Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Companyโ€™s quality assurance / quality control protocol.

Qualified Person

The Updated Mineral Resource Estimate was completed by Allan Armitage, Ph.D., P.Geo., of SGS Geological Services. Mr. Armitage is an independent Qualified Person as defined by NI 43-101. Mr. Armitage has reviewed and approved the technical contents of this news release.

Information Concerning Estimates of Mineral Resources

The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the โ€œSECโ€). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the โ€œCIM Definition Standardsโ€), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.

You are cautioned not to assume that any part or all of the mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, โ€œinferred mineral resourcesโ€ are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of โ€œcontained ouncesโ€ in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute โ€œreservesโ€ by SEC standards as in place tonnage and grade without reference to unit measures.

The SEC adopted new mining disclosure rules Pursuant to subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the โ€œSEC Modernization Rulesโ€). As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of โ€œmeasured mineral resourcesโ€, โ€œindicated mineral resourcesโ€ and โ€œinferred mineral resourcesโ€. As an eligible issuer under the Multijurisdictional Disclosure System the Company is exempt from compliance with the SEC Modernization Rules and information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according tothe SEC Modernization Rules. While the SEC Modernization Rules are purported to be โ€œsubstantially similarโ€ to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as โ€œmeasured mineral resourcesโ€, โ€œindicated mineral resourcesโ€ and โ€œinferred mineral resourcesโ€ under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

Contact Information: For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain โ€œForward-Looking Statementsโ€ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and โ€œforward-looking informationโ€ under applicable Canadian securities laws. When used in this news release, the words โ€œanticipateโ€, โ€œbelieveโ€, โ€œestimateโ€, โ€œexpectโ€, โ€œtargetโ€, โ€œplanโ€, โ€œforecastโ€, โ€œmayโ€, โ€œwouldโ€, โ€œcouldโ€, โ€œscheduleโ€ and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including drilling programs, the mobilization of drill rigs; and the potential for underground mining methods; the preparation of a technical report on the Updated Mineral Resource Estimate; and the potential further update to the Updated Mineral Resource Estimate in the second half of 2023.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on managementโ€™s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on managementโ€™s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of the COVID-19 pandemic; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silverโ€™s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect Vizsla Silverโ€™s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption โ€œRisk Factorsโ€ in Vizsla Silverโ€™s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
๐Ÿ‘๏ธ0
Oleblue Oleblue 7 months ago
VIZSLA SILVER PUBLISHES INAUGURAL SUSTAINABILITY REPORT
Vancouver, British Columbia (December 18, 2023) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA)
(Frankfurt: 0G3) (โ€œVizsla Silverโ€ or the โ€œCompanyโ€) is pleased to announce the release of its inaugural
Sustainability Report (the โ€œReportโ€), highlighting the Company's commitment to sustainable practices and
responsible corporate citizenship.
โ€œVizsla has always placed sustainability at the heart of its strategy," commented Michael Konnert, President
and CEO. "This inaugural Report demonstrates our ongoing commitment to the environment, our people, the
communities in which we operate, and our high standards of corporate governance. Furthermore, the Report
highlights the Companyโ€™s ethical leadership, dedication to transparency, accountability, and the continuous
improvement of its sustainability practices. I am very proud of the progress Vizsla has made so far as we
position ourselves to be the leaders in regenerative mining practices."
The Report provides detailed insights into Vizslaโ€™s performance and initiatives across three key pillars of
sustainability โ€“ environmental stewardship, social responsibility, and ethical governance.

https://vizslasilvercorp.com/site/assets/files/7601/2023-12-18_vizsla_announces_esg_report_final.pdf

๐Ÿ‘๏ธ0
Oleblue Oleblue 8 months ago
Nice move up this week with OBV turning up as well and an increase in volume.

๐Ÿ‘๏ธ0
Oleblue Oleblue 8 months ago
VIZSLA SILVER REPORTS ADDITIONAL HIGH-GRADE INTERCEPTS
ON THE COPALA AND COPALA 2 STRUCTURES
Vancouver, British Columbia (November 27, 2023) โ€“ Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA)
(Frankfurt: 0G3) (โ€œVizslaโ€ or the โ€œCompanyโ€) is pleased to report new drill results from 22 expansion and
infill holes targeting the Copala resource area at its 100%-owned, flagship Panuco silver-gold project
("Panuco" or the "Project") located in Mexico. The reported results have successfully expanded Copala
mineralization by ~100m to the southeast and identified new vein splays situated in-between Copala and
the high-grade Cristiano structure.
Highlights
โ€ข CS-23-304 returned 1,722 grams per tonne (g/t) silver equivalent (AgEq) over 2.80 metres true
width (mTW) (1,366 g/t silver and 6.80 g/t gold)
o Including 6,618 g/t AgEq over 0.55 mTW (5,320 g/t silver and 25.20 g/t gold)
โ€ข CS-23-300 returned 724 g/t AgEq over 3.10 mTW (519 g/t silver and 3.57 g/t gold)
o Including 1,749 g/t AgEq over 1.00 mTW (1,255 g/t silver and 8.61 g/t gold)
โ€œResource expansion drilling at Copala, both to the north and southeast, continue to highlight a robust
precious metals structure well beyond the January 2023 resource boundary,โ€ commented Michael
Konnert, President & CEO. โ€œNew step out drilling has extended the total mineralized strike length of Copala
by approximately 100 metres to the south and it remains open in both directions. Additionally, drilling has
confirmed the continuity of the high-grade Copala 2 vein located between Tajitos and Copala main which
now measures a total of 600 metres in mineralized strike. Moving forward, we intend to continue infilling
and expanding these high-grade zones with two drill rigs, in preparation for the updated resource estimate
planned for January 2024.โ€
www.vizslasilvercorp.ca | 2
Figure 1: Plan map of recent drilling centered on the Copala structure.
The precious metals dominant Copala Structure, located in the western portion of the Panuco district, is
situated ~800 m to the east of the Napoleon vein. Copala currently hosts Indicated Resources of 51.1 Moz
AgEq at 516 g/t AgEq and Inferred Resources of 55.4 Moz AgEq at 617 g/t AgEq within a broad envelope
of vein-breccia interlayered with host rock, up to 82 metres thick. Interpretations by Vizsla geologists
indicate Copala has an average dip of ~46ยฐ to the east (~35ยฐ in its northern sector and steepening to ~52ยฐ
in the southern sector).
Ongoing drilling at Copala has now traced mineralization along ~1,770 metres of strike length and ~400
metres down dip. The recently completed batch of resource expansion drilling consisted of 21 holes drilled
at ~50 m and ~100 m centres in the southern extent of Copala and one hole in the north, targeting both
the main Copala structure and the Copala 2 vein to the footwall. At Copala, hole CS-23-300 in the north,
intercepted a broad mineralized structure (~30 mTW) consisting of two high grade zones enveloping a low
grade stockwork zone carrying anomalous silver and gold grades throughout (see cross section on figure
5). Results from seven step-out holes in the south show that the Copala structure gets steeper at depth
(~70ยฐ) and develops vein splays carrying significant silver and gold grades. The recently interpreted Copala
4 and FW Splay vein sit between Cristiano and Copala, approximately 100 m and 50 m west of Copala,
respectively. To date, drilling has traced Copala 4 approximately 300 m along strike and 400 m down dip
whereas the FW Splay has been traced for ~350 m along strike and 250 m down dip. The vein splays strike
at 15ยฐ to 35ยฐ due northwest and dip at 60ยฐ to 70ยฐ to the east. These new splays, like Cristiano, are relatively
narrow compared to the main Copala structure, and host precious metals rich epithermal mineralization.
The drilling completed in the southern extent of Copala was designed to explore and/or infill the Copala
structure. Due to geometry those holes could not efficiently test the projection of the Cristiano vein, which
remains an open target. Vizsla is preparing an exploration program for next year that will consider
additional exploration on the southern extent of Cristiano and the newly identified splays.
The Copala 2 vein sits at the footwall of the main Copala structure and is bounded to the west by the
Tajitos vein and to the east by the Copala Fault. The Vein strikes northeast, dips to the southeast at
approximately 48ยฐ and has been traced for ~330 metres along strike and ~290 metres down dip. Refer to
www.vizslasilvercorp.ca | 3
the Companyโ€™s news releases dated July 13, 2023, and May 19, 2022, for previous drillhole results from
Copala 2.
To date, Vizsla has completed ~89,800 m of its fully funded 90,000 m 2023 drill program.
Figure 2: Inclined longitudinal section for Copala structure with drillhole pierce points. The section is 1x
along strike to 1.4x along the dip to compensate for the average 46-degree dip of Copala. The black dash
outlines represent Copala 2 in the north and the footwall vein (FW Splay) in the south.

https://vizslasilvercorp.ca/site/assets/files/7542/2023-11-27_vizsla_silver_copala_main_final.pdf
๐Ÿ‘๏ธ0
Oleblue Oleblue 10 months ago
Vizsla Silver President & CEO Michael Konnert presents at Precious Metals Summit
๐Ÿ‘๏ธ0
Oleblue Oleblue 10 months ago
Continues the uptrend

๐Ÿ‘๏ธ0
Oleblue Oleblue 10 months ago
๐Ÿ‘๏ธ0
Oleblue Oleblue 10 months ago
Vizsla Silver Intercepts 764 g/t AgEq Over 11.20 Metres at La Luisa and Commences Drilling Shallow Horizon 500 Metres North
Drill Results Silver MexicoFollowTSX.V: VZLAWebsite
Mr. Michael Konnert reports:

VANCOUVER, BC, Sept. 11, 2023 /CNW/ - Vizsla Silver Corp. (TSXV: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to report results from 13 new drillholes targeting the recently discovered La Luisa Vein located ~700 metres west of the Napoleon Area resource, at its 100%-owned flagship Panuco silver-gold project ("Panuco") in Mexico. The new drill results at La Luisa have expanded the local high-grade footprint by approximately 350 metres to the south and confirmed shallow vein mineralization located 500 metres along strike to the north.

Highlights
NP-23-395 returned 764 grams per tonne (g/t) silver equivalent (AgEq) over 11.20 metres true width (mTW) (229 g/t silver, 7.14 g/t gold, 0.34 % lead and 1.64 % zinc)
Including, 10,485 g/t AgEq over 0.64 mTW (3,140 g/t silver, 102.00 g/t gold, 2.99 % lead and 16.30 % zinc)
NP-23-376 returned 415 g/t AgEq over 5.65 mTW (340 g/t silver, 1.23 g/t gold, 0.15 % lead and 0.34 % zinc)
NP-23-377 returned 342 g/t AgEq over 7.70 mTW (67 g/t silver, 1.80 g/t gold, 0.75 % lead and 3.74 % zinc)
Including, 1,612 g/t AgEq over 0.54 mTW (250 g/t silver, 12.35 g/t gold, 5.65 % lead and 10.45 % zinc)
NP-23-381A returned 503 g/t AgEq over 5.00 mTW (155 g/t silver, 2.49 g/t gold, 0.91 % lead and 4.52 % zinc)
Including, 1,194 g/t AgEq over 0.97 mTW (476 g/t silver, 9.29 g/t gold, 1.60 % lead and 2.11 % zinc)
"La Luisa continues to impress with very high precious metals grades over increasingly broader widths," commented Michael Konnert, President and CEO. "We have now expanded the high-grade mineralized footprint at La Luisa to ~700 metres along strike by 400 metres down dip and it remains open in all directions. Moreover, new drilling approximately 500 meters along strike to the north has discovered shallow vein mineralization believed to be the continuation of La Luisa. Not only does this add significant strike potential to La Luisa, but it also supports our exploration model that the vein corridor has been tilted, with the southern extent being at the top of the mineralized horizon, near surface. Moving forward, we continue to explore La Luisa with two drill rigs."

Figure 1: Plan map of recent drilling along the La Luisa vein. (CNW Group/Vizsla Silver Corp.)Figure 1: Plan map of recent drilling along the La Luisa vein.

Details of the La Luisa vein discovery
The La Luisa Vein is located approximately 700 metres to the west of Napoleon in the southwest portion of the Panuco district. The structure has been mapped on surface for approximately 1,500 metres with an average strike of N30°W and dip of 70° - 80° to the northeast. La Luisa does not currently host any resources. To date including this release, Vizsla Silver has reported 33 holes from La Luisa outlining a mineralized footprint approximately 700 metres along strike by 400 metres down dip with a weighted average grade of 449 g/t AgEq (175 g/t silver, 3.40 g/t gold, 0.28 % lead and 1.33 % zinc) and average width 3.07 mTW. The upper level of the vein are hosted primarily by rhyolite tuffs (the upper part of the regional lower volcanic sequence), whereas deeper vein-intercepts occur in the more favourable diorite host rock.

Initial shallow drilling at La Luisa returned significant gold concentrations with relatively low silver and base metals values. The higher gold to silver and base metals ratios observed are analogous to the previously reported shallow "gold rich" horizon at the southern end of Napoleon. Interpretations based on metal zonation and alteration at Napoleon suggest that the vein corridor has been tilted, with the southern extent being at the top of the mineralized horizon, near surface (see the Company's press releases dated December 16, 2021, and October 12, 2022, respectively). Deeper drilling at La Luisa, including holes NP-23-394 and NP-23-395 intercepted wider vein mineralization marked by an increase in lead and particularly zinc concentrations.

Recent surface mapping and sampling along strike to the northwest at La Luisa has confirmed a wider vein expression with higher silver and gold anomalies at surface (see surface samples on figure 2). Surface sampling and mapping support the hypothesis that mineralization is tilted to the southeast in a similar fashion to Napoleon. Vizsla recently completed two shallow holes in the northwest, which intercepted the vein structure between 100 and 150 metres below surface (NP-23-399 and NP-23-401, assays pending), thus confirming our exploration model. Vizsla Silver is currently exploring La Luisa with two drill rigs, one continues in the south expanding the vein at depth and the second rig is in the north exploring for high-grade mineralization closer to surface.
Figure 2: Longitudinal section of the La Luisa Vein.

Figure 3: Cross section highlighting recent drill intercepts on La Luisa vein. (CNW Group/Vizsla Silver Corp.)Figure 3: Cross section highlighting recent drill intercepts on La Luisa vein.

Figure 4: Photo of NP-23-395 on La Luisa vein from 657.10 to 669.30 metres down the hole. (CNW Group/Vizsla Silver Corp.)Figure 4: Photo of NP-23-395 on La Luisa vein from 657.10 to 669.30 metres down the hole.

About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

The Panuco Project hosts an estimated in-situ indicated mineral resource of 104.8 Moz AgEq and an in-situ inferred resource of 114.1 Moz AgEq. An updated NI 43-101 technical report titled "Technical Report on the Mineral Resource Estimate Update for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico" was filed on SEDAR on March 10, 2023, with an effective date of January 19, 2023 was prepared by Allan Armitage, Ph. D., P. Geo., Ben Eggers, MAIG, P.Geo. and Yann Camus, P.Eng. of SGS Geological Services.

About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 250,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2023, Vizsla Silver has budgeted +90,000 metres of resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as test other high priority targets across the district.

Quality Assurance / Quality Control
Drill core samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver and rock samples were shipped to SGS Lab in Durango Mexico for sample preparation and analysis. The ALS Zacatecas, North Vancouver facilities and SGS lab are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption ("AA") spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish.

Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company's quality assurance / quality control protocol.

Qualified Person
In accordance with NI 43-101, Martin Dupuis, P.Geo., COO, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.

Information Concerning Estimates of Mineral Resources
The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the "SEC"). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the "CIM Definition Standards"), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.

You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, "inferred mineral resources" are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures.

Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the "SEC Modernization Rules"), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of "measured mineral resources", "indicated mineral resources" and "inferred mineral resources". Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be "substantially similar" to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
The information contained herein contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: the exploration, development, and production at Panuco, including plans for resource/discovery-based drilling designed to upgrade and expand the mineral resource.

Forwardโ€“looking statements and forwardโ€“looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Company's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forwardโ€“looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; the ongoing military conflict in Ukraine; general economic facts; and the factors identified under the caption "Risk Factors" in the Company's management discussion and analysis and other public disclosure documents.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

https://www.juniorminingnetwork.com/junior-miner-news/press-releases/2643-tsx-venture/vzla/147781-vizsla-silver-intercepts-764-g-t-ageq-over-11-20-metres-at-la-luisa-and-commences-drilling-the-shallow-horizon-500-metres-north.html?idU=1&utm_source=newsletter_1705&utm_medium=email&utm_campaign=junior-mining-brief-for-date-l-b-j-y
๐Ÿ‘๏ธ0
Oleblue Oleblue 11 months ago
Ownership Summary
Label Value
Institutional Ownership 26.95%
Total Shares Outstanding (millions) 208
Total Value of Holdings (millions) $61
Active Positions
ACTIVE POSITIONS HOLDERS SHARES
Increased Positions 15 11,444,631
Decreased Positions 6 457,884
Held Positions 13 44,139,649
Total Institutional Shares 34 56,042,164
New and Sold Out Positions
ACTIVE POSITIONS HOLDERS SHARES
New Positions 7 5,549,368
Sold Out Positions 4 297,935
Total New Increased Decreased Activity Sold Out
34 Institutional Holders
56,042,164 Total Shares Held

OWNER NAME
DATE
SHARES HELD
CHANGE (SHARES)
CHANGE (%)
VALUE (IN 1,000S)
FRANKLIN RESOURCES INC 06/30/2023 15,676,000 0 0% $16,930
SPROTT INC. 06/30/2023 15,074,007 2,731,777 22.134% $16,280
LUXOR CAPITAL GROUP, LP 06/30/2023 5,908,373 0 0% $6,381
FMR LLC 06/30/2023 5,000,000 0 0% $5,400
ETF MANAGERS GROUP, LLC 03/31/2023 4,850,230 4,850,230 New $5,238
MIRAE ASSET GLOBAL INVESTMENTS CO., LTD. 06/30/2023 3,930,517 197,721 5.297% $4,245
ROYAL BANK OF CANADA 06/30/2023 2,434,013 2,426,613 32792.068% $2,629
U S GLOBAL INVESTORS INC 06/30/2023 1,125,000 0 0% $1,215
MILLENNIUM MANAGEMENT LLC 06/30/2023 616,555 616,555 New $666
RAFFLES ASSOCIATES LP 06/30/2023 450,000 250,000 125% $486
GILDER GAGNON HOWE & CO LLC 06/30/2023 231,585 -9,873 -4.089% $250
RENAISSANCE TECHNOLOGIES LLC 06/30/2023 176,800 160,100 958.683% $191
GOLDMAN SACHS GROUP INC 06/30/2023 169,680 93,930 124% $183
CITADEL ADVISORS LLC 06/30/2023 102,886 34,967 51.483% $111
JPMORGAN CHASE & CO 06/30/2023 80,124 -150,076 -65.194% $87

1
๐Ÿ‘๏ธ0
Oleblue Oleblue 11 months ago
Michael Konnert of Vizsla Silver Corp presents at the Metals Investor Forum, January 27 28, 2023

๐Ÿ‘๏ธ0
Oleblue Oleblue 11 months ago
Turning back up.

๐Ÿ‘๏ธ0
Oleblue Oleblue 11 months ago
Vizsla Silver Intercepts 646 g/t AgEq over 10.00 Metres at Napoleon
Drill Results Silver MexicoFollowTSX.V: VZLAWebsite
Mr. Michael Konnert reports:

VANCOUVER, BC, Aug. 23, 2023 /CNW/ - Vizsla Silver Corp. (TSXV: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla" or the "Company") is pleased to report results from 11 new drillholes targeting the southern extension of the Napoleon Vein, at its 100%-owned flagship Panuco silver-gold project ("Panuco") located in Mexico. The new drill results are centered on the western portion of the district and are part of Vizsla's ongoing 90,000 metre resource infill and expansion/discovery-focused drill program.

Highlights
NP-23-388 returned 646 grams per tonne (g/t) silver equivalent (AgEq) over 10.00 metres true width (mTW) (217 g/t silver, 3.03 g/t gold, 1.44 % lead and 5.44 % zinc), including: 3,625 g/t AgEq over 0.95 mTW (1,590 g/t silver, 25.50 g/t gold, 7.28 % lead and 5.80 % zinc), and 1,323 g/t AgEq over 0.78 mTW (159 g/t silver, 0.89 g/t gold, 4.97 % lead and 26.70 % zinc)

NP-23-391 returned 1,568 g/t AgEq over 1.90 mTW (908 g/t silver, 7.37 g/t gold, 1.62 % lead and 4.91 % zinc), including: 2,205 g/t AgEq over 0.65 mTW (1,500 g/t silver, 8.96 g/t gold, 2.05 % lead and 3.98 % zinc) And 648 g/t AgEq over 3.20 mTW (559 g/t silver, 1.53 g/t gold, 0.23 % lead and 0.49 % zinc),
including: 1,720 g/t AgEq over 0.96 mTW (1,500 g/t silver, 3.89 g/t gold, 0.61 % lead and 1.22 % zinc)

NP-23-392 returned 989 g/t AgEq over 2.50 mTW (527 g/t silver, 3.78 g/t gold, 2.13 % lead and 4.98 % zinc), including: 2,465 g/t AgEq over 0.69 mTW (1,500 g/t silver, 9.97 g/t gold, 5.25 % lead and 6.66 % zinc).

"Infill and expansionary drilling targeting the southern extent of Napoleon continues to intersect high silver and gold grades on both the main vein and its overlapping splay structures," commented Michael Konnert, President and CEO. "We have now identified several splay veins branching off the main Napoleon structure located within both the footwall and hanging wall that remain open for future expansion. Most notable is the shallow dipping Hanging Wall 4 structure which returned 646 grams per tonne silver equivalent over ten meters true width and is open down dip.

We continue to view the Napoleon Area as a primary target for future resource growth and development. Of the six drill rigs currently turning on the property, infill drilling continues at Napoleon with one rig. In addition to drilling, we are pleased to announce Vizsla has achieved 1.5 million work hours without a lost time incident at Panuco. This is yet another major milestone for the Company and is a testament to the focus and dedication of every Vizsla employee and contractor working on the Project."

https://www.juniorminingnetwork.com/junior-miner-news/press-releases/2643-tsx-venture/vzla/146865-vizsla-silver-intercepts-646-g-t-ageq-over-10-00-metres-at-napoleon.html?idU=1&utm_source=newsletter_1693&utm_medium=email&utm_campaign=junior-mining-brief-for-date-l-b-j-y

Five year weekly chart:
๐Ÿ‘๏ธ0
Oleblue Oleblue 11 months ago
Vizsla Silver Reports High Metallurgical Test Recoveries For Copala: 91% Silver And 94% Gold

VANCOUVER, BC, Aug. 16, 2023 /CNW/ - Vizsla Silver Corp. (TSXV: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla" or the "Company") announces positive preliminary metallurgical test results for the Copala Resource Area ("Copala") at its 100%-owned flagship Panuco silver-gold project ("Panuco" or the "Project") located in Mexico.

"Based on representative samples from Copala, the largest known structure in the Panuco district, we are pleased to report very high silver and gold recoveries," commented Michael Konnert, President & CEO of Vizsla Silver. "This is a significant de-risking milestone for the Project and provides positive implications for the ongoing development of the Panuco district. Additionally, these results complement high silver and gold recoveries from the Napoleon and Tajitos resource areas using comparable grinding with both flotation and leaching methods independently. We intend to confirm through the next phase of metallurgical testing and additional flowsheet optimization that the mineralized material from all three primary zones, which make up the bulk of the current project resource base, is amenable to processing via the same flowsheet utilizing the same extraction circuits by testing the combination of flotation and cyanide leaching at both Napoleon and Tajitos."

Testing Procedure
The test program was designed and supervised by Ausenco Engineering Canada Inc. and completed by ALS Canada Ltd. out of Kamloops, BC. The testing procedure consisted of drill core being first crushed to -6 mesh and prepared into master composite test charges. A series of flotation tests were then conducted on the samples at primary grind sizes of between P80 70 to 150ยตm. Simple bulk flotation conditions were applied which included 18 g/t of PAX over 8 minutes of flotation time at natural pH. Precious metal recoveries to the concentrate ranged between 76 to 82% for gold and 78 to 85% for silver.

Flotation concentrate and tails were both subsequently leached using sodium cyanide to maximize gold and silver extraction. Flotation concentrates were subject following varying levels of regrinding prior to bottle roll leach tests using a sodium cyanide concentration of 3000 ppm. Pre-aeration was applied by bottle rolling the prepared feed slurries with ambient air prior to adding cyanide. Flotation tails were subject to bottle roll leach tests using a sodium cyanide concentration of 1000 ppm. Total circuit sodium cyanide consumptions averaged 1.3 kg/tonne for tests that included regrinding.

Gold and silver extractions from the flotation concentrates averaged 96.4 and 98.1%, respectively, for tests that employed regrinding compared with 93.6 and 92.7% without regrinding. Gold extractions appeared to be complete after 24 hours, while silver benefitted from extending the leach to 48 hours. Gold extractions from the rougher tails ranged between 77 and 82%, while silver extractions ranged between 48 and 67% after 48 hours of leaching. The higher extractions were achieved at the finer primary grind sizes. A summary of master composite test results is presented in Table 1.

https://vizslasilvercorp.ca/site/assets/files/7509/2023-08-16_vizsla_silver_copala_met_testing_final.pdf
๐Ÿ‘๏ธ0
lowfloatwayne lowfloatwayne 2 years ago
I was looking into GSRFF I googled 1090 West Georgia Street
Suite 700
๐Ÿ‘๏ธ0
Man6677 Man6677 2 years ago
Very good !
Me also
๐Ÿ‘๏ธ0
Tonyboons33 Tonyboons33 2 years ago
Woof, we're getting pummled. I'm buying dips as we go down.
๐Ÿ‘๏ธ0
Man6677 Man6677 2 years ago
VIZSLA SILVER DRILLS 1,030 G/T AGEQ OVER 20.45 METRES AT COPALA - EXPANDS MINERALIZED ZONE TO 600M BY 400M

Source: PR Newswire (Canada)
VANCOUVER, BC, June 21, 2022 /CNW/ - Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla" or the "Company") is pleased to report results from 24 new drill holes targeting the Tajitos - Copala resource area in the western portion of its 100%-owned, flagship Panuco silver-gold project ("Panuco" or the "Project") located in Mexico. The results are exclusively for the Copala structure and expand the high-grade mineralized footprint to 600 metres along strike by 400 metres down dip.

Highlights

CS-22-169 returned 1,030 grams per tonne (g/t) silver equivalent (AgEq) over 20.45 metres true width (mTW) (780 g/t silver and 4.23 g/t gold)
Includes 2,727 g/t AgEq over 1.21 mTW (2,230 g/t silver and 9.08 g/t gold)
And 9,880 g/t AgEq over 0.85 mTW (7,900 g/t silver and 35.20 g/t gold)
CS-22-155 returned 900 g/t AgEq over 14.50 mTW (667 g/t silver and 3.89 g/t gold)
CS-22-154 returned 1,331 g/t AgEq over 9.35 mTW (1,010 g/t silver and 5.44 g/t gold)
Includes 4,579 g/t AgEq over 1.30 mTW (3,548 g/t silver and 17.78 g/t gold)
CS-22-164 returned 1,242 g/t AgEq over 4.40 mTW (802 g/t silver and 6.89 g/t gold)
CS-22-160 returned 2,007 g/t AgEq over 3.40 mTW (1,642 g/t silver and 6.67 g/t gold)
"The Copala Vein continues to exceed our expectations, delivering excellent precious metal grades over very large widths," commented Michael Konnert, President and CEO. "When we first discovered the Copala Vein in late 2021, we knew we were on to something special given the well developed, near surface mineral continuity. At the time of the maiden resource, eight drill holes from Copala contributed 6.4Moz AgEq of indicated and 18.6Moz AgEq of inferred1. We have now reported 46 holes from Copala, effectively expanding the mineralized footprint to 600m along strike by 400m down dip with drill intercepts showing mineralization remains open in all directions. We continue to target the Copala area with three rigs and view this portion of the district as a major focus for resource expansion ahead of the Resource Update planned for Q4 of this year."

1 See details of mineral resource estimate in the "About Panuco Project" section, below.



Figure 1: Plan map of recent drilling centered on the Copala vein. (CNW Group/Vizsla Silver Corp.)

The Copala Vein is a shallow dipping structure located at the northern extent and on the hangingwall side of the Tajitos structure. Copala is marked by high precious metals grades (up to 7,900 g/t silver and 35.20 g/t gold over 0.85 mTW) hosted within a broader envelope of vein-breccia up to 82 metres thick with local mineralized pockets up to 20.45 mTW averaging 1,030 g/t AgEq (780 g/t silver and 4.23 g/t gold).

Today's reported intercepts expand a NNW-SSE striking high-grade shoot with approximate dimensions of 400 metres along strike and 200 metres down dip. This high-grade zone remains open to the north and down-dip to the east. Ongoing detailed structural-geologic interpretations suggest mineralization continues to the south, beyond the previously reported Cristiano Vein (see press releases dated January 19, 2022 and March 10, 2022), and is a near-term focus for expansion as Vizsla continues to explore this area. The Company currently has three drill rigs targeting the Tajitos โ€“ Copala resource area.

The Company is encouraged that the northern sector of the Tajitos โ€“ Copala resource area continues to grow, and the intercepts reported here, along with the recent discovery of Copala 2 between Tajitos and Copala (see press release dated May 19, 2022), demonstrates significant potential for additional blind to surface veins in the district. Vizsla is currently negotiating additional land access and has prepared a drill plan to advance the exploration of the Tajitos - Copala area to the north. To further support its 2022 growth initiatives, Vizsla recently completed a district-scale LiDar survey over the main 6,200 ha claim block to aid in geologic-structural mapping, drill-hole planning and geologic modelling.

Figure 2: Plan map of Copala vein with drill-hole pierce points. (CNW Group/Vizsla Silver Corp.)

Figure 3: Cross section showing Copala and Copala 2 veins. (CNW Group/Vizsla Silver Corp.)

Drillhole

From

To

Downhole
Length

Estimated
True width

Ag

Au

AgEq





(m)

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)



CS-22-136

NO SIGNIFICANT VALUES



CS-22-138

93.30

108.75

15.45

10.82

137

0.99

199



Includes

93.30

94.50

1.20

0.84

356

2.10

482



Includes

94.50

96.00

1.50

1.05

316

2.41

467



Includes

108.00

108.75

0.75

0.53

323

1.73

425



CS-22-140

65.30

67.10

1.80

1.40

209

1.34

291



CS-22-143

210.20

227.90

17.70

16.05

147

0.89

201



Includes

210.20

211.10

0.90

0.75

829

5.92

1197



Includes

221.15

223.55

2.40

2.15

1428

7.12

1840



CS-22-144

NO SIGNIFICANT VALUES



CS-22-145

245.15

252.25

7.10

5.20

203

1.41

290



Includes

245.15

246.90

1.80

1.20

669

4.75

964



CS-22-146

NO SIGNIFICANT VALUES



CS-22-147

285.65

300.00

14.35

12.40

68

0.52

101



Includes

292.75

293.85

1.10

0.95

207

2.54

375



CS-22-148

265.10

267.00

1.90

1.75

94

0.78

144



CS-22-150

304.50

310.45

5.95

4.50

156

0.86

207



Includes

307.05

309.00

1.95

1.60

428

1.90

535



CS-22-151

NO SIGNIFICANT VALUES



CS-22-152

248.90

258.00

9.10

7.30

152

0.74

195



Includes

255.35

258.00

2.65

2.00

286

1.65

385



CS-22-153

148.50

182.50

34.00

30.50

97

0.87

153



Includes

177.30

178.80

1.50

1.35

427

2.55

581



Includes

178.80

180.00

1.20

1.08

361

2.58

521



Includes

180.00

181.50

1.50

1.35

518

2.13

635



CS-22-154

124.45

136.50

12.05

9.35

1010

5.44

1331



Includes

124.45

126.10

1.65

1.30

3548

17.78

4579



Includes

133.00

136.50

3.50

2.85

1442

8.54

1956



CS-22-155

159.00

174.35

15.35

14.50

667

3.89

900



Includes

166.10

167.60

1.50

1.45

2480

12.70

3220



Includes

170.20

174.35

4.15

4.05

1057

5.37

1369



CS-22-157

83.00

106.60

23.60

16.10

139

1.07

206



Includes

103.50

104.75

1.25

0.85

475

4.64

776



Includes

104.75

106.25

1.50

1.02

1135

8.10

1638



CS-22-158

142.50

145.50

3.00

2.30

800

7.77

1303



CS-22-160

189.10

192.90

3.80

3.40

1642

6.67

2007



Includes

189.70

190.75

1.05

0.95

3190

11.40

3787



Includes

191.60

192.15

0.55

0.50

3730

15.40

4577



CS-22-161

128.60

133.90

5.30

4.35

398

3.41

616



Includes

129.55

130.50

0.95

0.65

856

10.10

1523



Includes

133.35

133.90

0.55

0.35

1090

3.77

1285



CS-22-162

190.80

193.65

2.85

2.65

298

2.87

484



CS-22-164

157.50

164.95

7.45

4.40

802

6.89

1242



Includes

162.10

162.90

0.80

0.47

2910

38.70

5491



Includes

162.90

164.15

1.25

0.74

1055

5.88

1404



Includes

164.15

164.95

0.80

0.47

1150

4.37

1384



CS-22-166

NO SIGNIFICANT VALUES



CS-22-167

NO SIGNIFICANT VALUES



CS-22-169

162.95

188.35

25.40

20.45

780

4.23

1030



Includes

179.55

180.30

0.75

0.60

4610

20.20

5741



Includes

180.60

182.10

1.50

1.21

2230

9.08

2727



Includes

185.70

186.45

0.75

0.60

1765

14.00

2649



Includes

186.45

187.50

1.05

0.85

7900

35.20

9880



Table 1: Downhole drill intersections from the holes reported for the new splay vein at the foot wall of Copala. Holes CS-21-90 and CS-21-94 drilled in 2021 were previously reported in press release dated January 19, 2022. Note: AgEq = Ag g/t x Ag rec. + (Au g/t x Au Rec x Au price/gram)/Ag price/gram. Metal price assumptions are $20.70/oz silver and $1,655/oz gold and metallurgical recoveries assumed are 93% for silver and 90% for gold. Gold and silver metallurgical recoveries used in this release were estimated for the Napoleon vein (see press release dated February 17, 2022).

Note: AgEq = Ag g/t x Ag rec. + (Au g/t x Au Rec x Au price/gram)/Ag price/gram. Metal price assumptions are $20.70/oz silver and $1,655/oz gold and metallurgical recoveries assumed are 93% for silver and 90% for gold. Gold and silver metallurgical recoveries used in this release were estimated for the Napoleon vein (see press release dated February 17, 2022).



Drillhole

Easting

Northing

Elevation

Azimuth

Dip

Depth

CS-22-136

404,528

2,587,186

558

306x

-59.8

207.0

CS-22-138

404,614

2,587,059

550

320

-64.1

258.0

CS-22-140

404,482

2,587,236

554

275

-65.9

255.0

CS-22-143

404,740

2,587,166

555

292

-54.4

298.5

CS-22-144

404,858

2,587,182

601

268

-66.9

346.3

CS-22-145

404,797

2,587,181

583

302

-54.3

481.5

CS-22-146

404,741

2,587,165

555

287

-72.4

342.0

CS-22-147

404,858

2,587,182

601

294

-53.0

373.5

CS-22-148

404,741

2,587,165

555

254

-84.6

370.5

CS-22-150

404,858

2,587,182

601

309

-62.5

460.5

CS-22-151

404,741

2,587,165

555

74

-84.0

423.0

CS-22-152

404,797

2,587,181

583

321

-51.0

380.0

CS-22-153

404,675

2,587,218

533

328

-63.0

250.5

CS-22-154

404,540

2,587,279

553

306

-43.7

277.5

CS-22-155

404,675

2,587,218

534

317

-46.8

405.0

CS-22-157

404,540

2,587,280

552

317

-65.1

339.0

CS-22-158

404,540

2,587,280

552

349

-49.1

310.5

CS-22-160

404,675

2,587,218

533

333

-40.5

403.5

CS-22-161

404,616

2,587,253

544

307

-45.7

264.0

CS-22-162

404,675

2,587,218

533

346

-53.0

456.0

CS-22-164

404,616

2,587,253

544

328

-39.5

381.0

CS-22-166

404,590

2,587,215

566

279

-68.2

216.0

CS-22-167

404,759

2,587,043

589

301

-66.5

549.0

CS-22-169

404,642

2,587,059

558

292

-77.8

390.0

Table 2: Drillhole details for the reported drillholes. Coordinates in WGS84, Zone 13.

About the Panuco project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 6,754-hectare, past producing district benefits from over 75 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

The Panuco Project hosts an estimated in-situ indicated mineral resource of 61.1 Moz AgEq and an in-situ inferred resource of 45.6 Moz AgEq The Technical Report, titled "National Instrument 43-101 Technical Report for the Panuco Project Mineral Resource Estimate Concordia, Sinaloa, Mexico" was filed on SEDAR on April 7, 2022, has an effective date of March 1, 2022 and was prepared in accordance with National Instrument 43-101 โ€“ Standards of Disclosure for Mineral Projects ("NI 43-101") by Tim Maunula, P.Geo., Principal Geologist, T. Maunula & Associates Consulting Inc and Kevin Murray, P.Eng, Manager Process Engineering, Ausenco.

About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla has completed over 140,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2022, Vizsla has budgeted +120,000 metres of resource/discovery-based drilling designed to upgrade and expand the maiden resource, as well as test other high priority targets across the district.

Quality Assurance / Quality Control
Drill core and rock samples were shipped to ALS Limited in Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver. The ALS Zacatecas and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption ("AA") spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish.

Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company's quality assurance / quality control protocol.

Qualified Person
In accordance with NI 43-101, Martin Dupuis, P.Geo., COO , is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.

Information Concerning Estimates of Mineral Resources
The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the "SEC"). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the "CIM Definition Standards"), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.

You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, "inferred mineral resources" are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures.

Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the "SEC Modernization Rules"), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of "measured mineral resources", "indicated mineral resources" and "inferred mineral resources". Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be "substantially similar" to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

Website: www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" under applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including plans for resource/discovery-based drilling, designed to upgrade, and expand the maiden resource as well as test other high priority targets across the district.

Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of the COVID-19 pandemic; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect Vizsla Silver's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption "Risk Factors" in Vizsla Silver's management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

Vizsla Silver Corp. logo (CNW Group/Vizsla Silver Corp.)

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/vizsla-silver-drills-1-030-gt-ageq-over-20-45-metres-at-copala---expands-mineralized-zone-to-600m-by-400m-301571828.html

SOURCE Vizsla Silver Corp.


VZLA $$$$
๐Ÿ‘๏ธ0

Your Recent History

Delayed Upgrade Clock