QuickLinks
-- Click here to rapidly navigate through this document
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of August, 2015.
Commission
File Number 001-13422
|
AGNICO EAGLE MINES LIMITED
(Translation of registrant's name into English) |
145 King Street East, Suite 400, Toronto, Ontario M5C 2Y7
(Address of principal executive office)
|
Indicate
by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Indicate
by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T
Rule 101 (b)(1):
Note: Regulation S-T Rule 101 (b)(1) only permits the submission in paper of a Form 6-K if submitted solely to provide an attached
annual report to security holders.
Indicate
by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T
Rule 101 (b)(7):
Note: Regulation S-T Rule 101(b)(7) only permits the submission in paper of a Form 6-K if submitted to furnish a report or other
document that the registrant foreign private issuer must furnish and make public under the laws of the jurisdiction in which the registrant is incorporated, domiciled or legally organized
(the registrant's "home country"), or under the rules of the home country exchange on which the registrant's securities are traded, as long as the report or other document is not a press
release, is not required to be and has not been distributed to the registrant's security holders, and, if discussing a material event, has already been the subject of a Form 6-K submission or
other Commission filing on EDGAR.
Indicate
by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under
the Securities Exchange Act of 1934. Yes o No ý
If "Yes" is marked, indicate below the file number assigned to the registrant in connection with
Rule 12g3-2(b): 82- .
EXHIBITS
|
|
|
Exhibit No.
|
|
Exhibit Description
|
99.1 |
|
Second Quarter Report |
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its
behalf by the undersigned, thereunto duly authorized.
|
|
|
|
|
|
|
AGNICO EAGLE MINES LIMITED
(Registrant) |
|
|
|
|
|
Date: August 12,
2015
|
|
By: |
|
/s/ R. GREGORY LAING
R. Gregory Laing
General Counsel, Sr. Vice-President, Legal
and Corporate Secretary
|
Exhibit
Number 99.1 submitted with this Form 6-K is hereby incorporated by reference into Agnico Eagle Mines Limited's Registration Statements on Form F-10
(Reg. No. 333-189715), Form F-3D (Reg. No. 333-190888) and Form S-8 (Reg. Nos. 333-130339 and 333-152004).
QuickLinks
EXHIBITS
SIGNATURES
QuickLinks
-- Click here to rapidly navigate through this document
Second Quarter Report 2015
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the
three and six months ended June 30, 2015
This Management's Discussion and Analysis ("MD&A") dated August 12, 2015 of Agnico Eagle Mines Limited ("Agnico Eagle" or the "Company") should be read in conjunction with the Company's
unaudited condensed interim consolidated financial statements for the three and six months ended June 30, 2015, prepared in accordance with International Financial Reporting Standards ("IFRS")
as issued by the International Accounting Standards Board ("IASB"). This MD&A should also be read in conjunction with the MD&A and consolidated financial statements included in the Company's Annual
Report on Form 40-F for the year ended December 31, 2014 (the "Form 40-F"), prepared in accordance with IFRS. The Company has adopted IFRS as its basis of accounting,
replacing US GAAP effective July 1, 2014. The condensed interim consolidated financial statements and MD&A are presented in United States dollars ("$" or "US$") and all units of
measurement are expressed in metric, unless otherwise specified. Certain information in this MD&A is presented in Canadian dollars ("C$") or European Union euros ("Euros" or "€").
Additional information relating to the Company, including risk factors in the Form 40-F, is available on the Canadian Securities Administrators' (the "CSA") SEDAR website at
www.sedar.com.
Business Overview
Agnico Eagle is a senior Canadian gold mining company that has produced precious metals since 1957. The Company's nine mines are
located in Canada, Mexico and Finland, with exploration and development activities in each of these regions as well as in the United States. The Company and its shareholders have full exposure
to gold prices due to its long-standing policy of no forward gold sales. Agnico Eagle has declared a cash dividend every year since 1983.
Agnico
Eagle earns a significant proportion of its revenue and cash flow from the production and sale of gold in both dore bar and concentrate form. The remainder of revenue and cash
flow is generated by the production and sale of by-product metals, primarily silver, zinc and copper.
Over
the past six years, Agnico Eagle has evolved from operating two gold mines in Canada to being an international gold mining company with nine gold mines at the end of 2014. Each mine
is located in what the Company believes to be a politically stable country that is supportive of the mining industry. The political stability of the regions in which Agnico Eagle operates helps to
provide confidence in its current and future prospects and profitability. This is important for Agnico Eagle as it believes that many of its new mines and recently acquired mining projects have
long-term mining potential.
Financial and Operating Results
Balance Sheet Review
Total assets as at June 30, 2015 of $6,749.8 million decreased by 0.9% compared with December 31, 2014 total
assets of $6,809.3 million. Cash and cash equivalents decreased by $19.2 million to $158.3 million between December 31, 2014 and June 30, 2015 due primarily to
$194.4 million in capital expenditures, a net $151.1 million repayment of long-term debt and $13.0 million in cash consideration paid related to asset acquisitions during the
first six months of 2015, partially offset by cash provided by operating activities of $331.8 million and net proceeds from the sale of available-for-sale securities and warrants. Ore in
stockpiles and on leach pads inventories increased from $52.0 million at December 31, 2014 to $62.4 million at June 30, 2015 due primarily to planned mine sequencing
resulting in the buildup of ore in stockpiles at the Canadian Malartic and Meadowbank mines during the first six months of 2015. Concentrates and dore bar inventories increased from
$111.9 million at December 31, 2014 to $127.5 million at June 30, 2015 due primarily to a buildup of concentrates and dore bar inventories at the Canadian Malartic mine as
mill throughput is increased toward capacity and to planned mine sequencing resulting in the buildup of concentrates and dore bar inventories at the Pinos Altos and LaRonde mines. Supplies inventories
decreased from $282.8 million at December 31, 2014 to $250.0 million at June 30, 2015 due primarily to planned supplies drawdowns at the Meadowbank mine that
2
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
were
delivered during the 2014 summer barge shipping season. Available-for-sale securities decreased from $56.5 million at December 31, 2014 to $46.0 million at June 30,
2015 due to $25.9 million in disposals, $8.0 million in unrealized fair value losses and $1.0 million in impairment losses, partially offset by $24.4 million in new
investments recorded during the first six months of 2015. Property, plant and mine development decreased from $5,155.9 million at December 31, 2014 to $5,120.1 million at
June 30, 2015 due primarily to amortization expense of $293.5 million, partially offset by $194.4 million in capital expenditures and property acquisitions totaling
$67.5 million during the first six months of 2015.
Total
liabilities decreased to $2,590.0 million at June 30, 2015 from $2,740.8 million at December 31, 2014 due primarily to $125.0 million in Credit
Facility repayments during the first six months of 2015 and the June 30, 2015 settlement of the convertible debentures issued by Osisko Mining Corporation ("Osisko") and assumed by Canadian
Malartic GP. A $22.8 million increase in accounts payable and accrued liabilities between December 31, 2014 and June 30, 2015 was due primarily to expenditures in
preparation for the summer barge shipping season to the Meadowbank mine and to $7.1 million in accrued consideration related to the Company's June 11, 2015 acquisition of 55.0% of
Gunnarn Mining AB ("Gunnarn"). Agnico Eagle's net income taxes payable position of $17.7 million at December 31, 2014 was reduced during the first six months of 2015 by payments
to tax authorities, resulting in a net income taxes payable position of $6.7 million at June 30, 2015.
Certain
previously reported balance sheet line items as at December 31, 2014 have been updated to reflect final estimates of the fair value of identifiable assets acquired and
liabilities assumed related to the June 16, 2014 joint acquisition of Osisko. As a result of new information obtained about the facts and circumstances
that existed as of the Osisko acquisition date, the following adjustments have been recorded to the December 31, 2014 balance sheet as previously reported: the goodwill line item has increased
by $95.6 million; the property, plant and mine development line item has decreased by $125.6 million and the deferred income and mining tax liabilities line item has decreased by
$30.0 million.
Fair Value of Derivative Financial Instruments
The Company occasionally enters into contracts to limit the risk associated with decreased by-product metal prices, increased foreign
currency costs (including capital expenditures) and input costs. The contracts act as economic hedges of underlying exposures and are not held for speculative purposes. Agnico Eagle does not use
complex derivative contracts to hedge exposures. The fair value of the Company's derivative financial instruments is outlined in the financial instruments note to the condensed interim consolidated
financial statements.
Results of Operations
Agnico Eagle reported net income of $10.1 million, or $0.05 per share, in the second quarter of 2015 compared with net income of
$22.2 million, or $0.12 per share, in the second quarter of 2014. In the second quarter of 2015, the operating margin (revenues from mining operations less production costs) increased to
$246.5 million from $209.1 million in the second quarter of 2014 due primarily to a 23.8% increase in gold production, partially offset by a 14.9% increase in production costs and a 7.4%
decrease in the average realized price of gold between periods. Gold production increased to 403,678 ounces in the second quarter of 2015 compared with 326,059 ounces in the second
quarter of 2014 due primarily to an incremental 56,563 attributable ounces for the full second quarter of 2015 from the Company's interest in the Canadian Malartic mine which was acquired on
June 16, 2014, higher gold grade at the LaRonde mine, a 53.4% increase in tonnes of ore milled at the Kittila mine and the ramp up of production from the La India mine which achieved commercial
production in February 2014. Partially offsetting the overall increase in gold production between the second quarter of 2014 and the second quarter of 2015 was a 22.8% decrease in gold
production at the Meadowbank mine due primarily to lower gold grade. Cash provided by operating activities amounted to $188.3 million in the second quarter of 2015 compared with
$182.7 million in the second quarter of 2014. Total weighted average cash
3
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
costs
per ounce of gold produced amounted to $601 on a by-product basis and $666 on a co-product basis in the second quarter of 2015 compared with $631 on a by-product basis and $730 on a co-product
basis in the second quarter of 2014.
In
the first six months of 2015, Agnico Eagle reported net income of $38.8 million, or $0.18 per share, compared with net income of $119.3 million, or $0.66 per share, in
the first six months of 2014. Operating margin (revenues from mining operations less production costs) remained unchanged at $482.8 million between the first six months of 2014 and the first
six months of 2015 as a $63.4 million increase in revenues from mining operations between periods was entirely offset by a $63.4 million increase in production costs. Although the
average realized price of gold decreased by 7.8% between the first six months of 2014 and the first six months of 2015, gold production increased to 807,888 ounces in the first six months of
2015 compared with 692,480 ounces in the first six months of 2014. The 16.7% increase in gold production between periods was due primarily to an incremental 124,456 attributable ounces
for the full first six months of 2015 from the Company's interest in the Canadian Malartic mine which was acquired on June 16, 2014, the ramp up of production from the La India mine and the
Goldex mine's M and E Zones which achieved commercial production in February 2014 and October 2013, respectively, a 30.6% increase in tonnes of ore milled at the Kittila mine and higher
gold grade at the LaRonde and Pinos Altos mines. Partially offsetting the overall increase in gold production between the first six months of 2014 and the first six months of 2015 was a 34.5% decrease
in gold production at the Meadowbank mine due primarily to lower gold grade. Cash provided by operating activities amounted to $331.8 million in the first six months of 2015 compared with
$433.1 million in the first six months of 2014. Total weighted average cash costs per ounce of gold produced amounted to $595 on a by-product basis and $658 on a co-product basis in the first
six months of 2015 compared with $582 on a by-product basis and $676 on a co-product basis in the first six months of 2014.
The
table below sets out variances in the key drivers of net income for the three and six months ended June 30, 2015 compared with the three and six months ended
June 30, 2014:
|
|
|
|
|
|
|
|
(millions of United States dollars)
|
|
Three Months Ended
June 30, 2015
vs. Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015
vs. Six Months Ended
June 30, 2014 |
|
Increase in gold revenue |
|
$ |
50.1 |
|
$ |
47.6 |
|
Increase in silver revenue |
|
|
23.8 |
|
|
21.8 |
|
Decrease in net copper revenue |
|
|
(0.6 |
) |
|
(3.9 |
) |
Decrease in net zinc revenue |
|
|
(1.7 |
) |
|
(2.1 |
) |
Decrease in production costs due to weaker Canadian dollar, Mexican peso and Euro |
|
|
35.6 |
|
|
67.7 |
|
Increase in production costs |
|
|
(69.8 |
) |
|
(131.1 |
) |
Increase in exploration and corporate development expenses |
|
|
(19.0 |
) |
|
(26.2 |
) |
Increase in amortization of property, plant and mine development |
|
|
(64.0 |
) |
|
(116.4 |
) |
Decrease in general and administrative expense |
|
|
18.0 |
|
|
19.0 |
|
Change in impairment loss on available-for-sale securities |
|
|
2.1 |
|
|
1.4 |
|
Increase in finance costs |
|
|
(0.7 |
) |
|
(3.3 |
) |
Change in gain on sale of available-for-sale securities |
|
|
(2.4 |
) |
|
18.4 |
|
Change in non cash foreign currency translation |
|
|
1.8 |
|
|
8.4 |
|
Decrease in income and mining taxes |
|
|
0.8 |
|
|
22.4 |
|
Other |
|
|
13.9 |
|
|
(4.2 |
) |
|
|
|
|
|
|
Total net income variance |
|
$ |
(12.1 |
) |
$ |
(80.5 |
) |
|
|
|
|
|
|
4
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Three Months Ended June 30, 2015 vs. Three Months Ended June 30, 2014
Revenues from mining operations increased to $510.1 million in the second quarter of 2015 compared with $438.5 million in
the second quarter of 2014 due primarily to a 23.8% increase in gold production attributable to a full quarter of production in the second quarter of 2015 from the Canadian Malartic mine which was
jointly acquired on June 16, 2014, higher gold grade at the LaRonde mine and an increase in tonnes of ore milled at the Kittila mine and to a 17.9% increase in silver production between
periods. Partially offsetting the overall increase in revenues from mining operations between the second quarter of 2014 and the second quarter of 2015 was a 7.4% decrease in the average realized
price of gold, a 15.7% decrease in the average realized price of silver and a 78.2% decrease in zinc production between periods.
Production
costs were $263.6 million in the second quarter of 2015, a 14.9% increase compared with $229.4 million in the second quarter of 2014 due primarily to a
$23.9 million incremental increase in attributable production costs from the acquired interest in the Canadian Malartic mine, a $3.9 million increase in production costs at the Kittila
mine due to a 53.4% increase in tonnes of ore milled between periods and $3.8 million in additional production costs at the La India mine which achieved commercial production in
February 2014. Partially offsetting the total increase in production costs between the second quarter of 2014 and the second quarter of 2015 was the impact of a weaker Canadian dollar, Mexican
peso and Euro relative to the US dollar.
Total
weighted average cash costs per ounce of gold produced decreased to $601 on a by-product basis and $666 on a co-product basis in the second quarter of 2015 compared with $631 on a
by-product basis and $730 on a co-product basis in the second quarter of 2014 due primarily to increased gold production at the LaRonde, Kittila and Pinos Altos mines between periods, the addition of
the acquired interest in the Canadian Malartic mine at total cash costs per ounce of gold produced of $609 on a by-product basis and $626 on a co-product basis and the impact on costs of a weaker
Canadian dollar, Mexican peso and Euro relative to the US dollar. Partially offsetting the overall decrease in total weighted average cash costs per ounce of gold produced between the second quarter
of 2014 and the second quarter of 2015 was decreased gold production at the Meadowbank mine. Lower by-product revenue credits at the LaRonde mine contributed to incrementally increased weighted
average cash costs per ounce of gold produced on a by-product basis between the second quarter of 2014 and the second quarter of 2015. For a reconciliation of total cash costs per ounce of gold
produced on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal revenues) to production costs as presented in the
condensed interim consolidated statements of income and comprehensive income in accordance with IFRS, see Non-GAAP Financial Performance Measures in this MD&A.
Exploration
and corporate development expenses increased to $30.6 million in the second quarter of 2015 compared with $11.6 million in the second quarter of 2014 due
primarily to exploration at the El Barqueno project in Mexico and the Amaruq project in Nunavut, exploration related to the acquired interest in the Canadian Malartic General Partnership and increased
corporate development and project evaluation expenses between periods.
Amortization
of property, plant and mine development increased by $64.0 million to $157.6 million between the second quarter of 2014 and the second quarter of 2015 due
primarily to the consolidation of the acquired interest in the Canadian Malartic mine, increased gold production at the Kittila mine and a ramp up in gold production at the La India mine related to
the achievement of commercial production in February 2014.
General
and administrative expense decreased to $23.6 million during the second quarter of 2015 compared with $41.5 million during the second quarter of 2014 due primarily
to $16.7 million in transaction costs associated with the June 16, 2014 joint acquisition of Osisko and lower compensation expenses between periods. Partially offsetting the overall
decrease in general and administrative expense, the Company consolidated its interest in the Canadian Malartic mine's general and administrative expense for the full second quarter of 2015.
5
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Transaction
costs associated with the June 2015 acquisitions of Soltoro Ltd. ("Soltoro") and Gunnarn were capitalized to the mining properties acquired as both were accounted for as
asset acquisitions.
An
impairment loss on certain available-for-sale securities of $0.3 million was recorded as at June 30, 2015 compared with $2.4 million as at June 30, 2014.
Impairment loss evaluations of available-for-sale securities are based on whether a decline in fair value is considered to be significant or prolonged. A gain of $2.7 million
was recorded on the sale of available-for-sale securities in the second quarter of 2015 compared with $5.0 million in the second quarter of 2014.
During
the second quarter of 2015, there was a non-cash foreign currency translation loss of $4.8 million mainly attributable to a strengthening of the Canadian dollar and Euro
versus the US dollar at June 30, 2015 relative to March 31, 2015. A non-cash foreign currency translation loss of $6.6 million was recorded during the comparative second quarter
of 2014.
In
the second quarter of 2015, the Company recorded income and mining taxes expense of $10.8 million on income before income and mining taxes of $20.9 million, resulting in
an effective tax rate of 51.8%. In the second quarter of 2014, the Company recorded income and mining taxes expense of $11.7 million on income before income and mining taxes of
$33.8 million, resulting in an effective tax rate of 34.5%. The increase in the effective tax rate between the second quarter of 2014 and the second quarter of 2015 is due primarily to an
increase in taxable permanent differences, partially offset by foreign exchange rate movements.
There
are a number of factors that can significantly impact the Company's effective tax rate including varying rates in different jurisdictions, the non-recognition of certain tax
assets, mining allowances, foreign currency exchange rate movements, changes in tax laws, the impact of specific transactions and assessments and the relative distribution of income in the Company's
operating jurisdictions. As a result of these factors, the Company's effective tax rate is expected to fluctuate in future periods.
Six Months Ended June 30, 2015 vs. Six Months Ended June 30, 2014
In the first six months of 2015, revenues from mining operations increased to $993.7 million from $930.3 million in the
first six months of 2014 due primarily to a 16.7% increase in gold production and a 17.5% increase in silver production between periods. An incremental increase of 124,456 ounces of gold
production from the Canadian Malartic mine which was jointly acquired on June 16, 2014, the ramp up of production from the La India mine which achieved commercial production in
February 2014, an increase in tonnes of ore milled at the Kittila mine and higher gold grade at the LaRonde mine, partially offset by a 31.1% decrease in gold grade at the Meadowbank mine,
resulted in a 115,408 ounce net increase in total gold production between the first six months of 2014 and the first six months of 2015. Partially offsetting the impact of increased gold and
silver production on revenues from mining operations was a 7.8% decrease in the average realized price of gold, a 16.8% decrease in the average realized price of silver and a 69.9% decrease in zinc
production between periods.
Production
costs were $510.9 million in the first six months of 2015, a 14.2% increase compared with $447.4 million in the first six months of 2014 due primarily to a
$65.0 million incremental increase in attributable production costs from the acquired interest in the Canadian Malartic mine, $10.4 million in additional production costs at the La India
mine which achieved commercial production in February 2014 and a $6.4 million increase in production costs at the Kittila mine due to a 30.6% increase in tonnes of ore milled between
periods. Partially offsetting the total increase in production costs between the first six months of 2014 and the first six months of 2015 was the impact of a weaker Canadian dollar, Mexican peso and
Euro relative to the US dollar.
Total
weighted average cash costs per ounce of gold produced increased to $595 on a by-product basis and decreased to $658 on a co-product basis in the first six months of 2015 compared
with $582 on a by-product basis and $676 on a co-product basis in the first six months of 2014. Lower by-product revenue credits at the LaRonde
6
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
and
Pinos Altos mines contributed to incrementally increased weighted average cash costs per ounce of gold produced on a by-product basis between the first six months of 2014 and the first six months
of 2015. Total weighted average cash costs per ounce of gold produced on a co-product basis decreased between periods due primarily to increased gold production, the addition of the acquired interest
in the Canadian Malartic mine at total cash costs per ounce of gold produced of $621 on a by-product basis and $638 on a co-product basis and the impact on costs of a weaker Canadian dollar, Mexican
peso and Euro relative to the US dollar. Partially offsetting the overall decrease in total weighted average cash costs per ounce of gold produced on a co-product basis between the first six months of
2014 and the first six months of 2015 was decreased gold production at the Meadowbank mine between periods. For a reconciliation of total cash costs per ounce of gold produced on both a by-product
basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal revenues) to production costs as presented in the condensed interim consolidated
statements of income and comprehensive income in accordance with IFRS, see Non-GAAP Financial Performance Measures in this MD&A.
Exploration
and corporate development expenses increased to $47.3 million in the first six months of 2015 compared with $21.0 million in the first six months of 2014 due
primarily to exploration at the El Barqueno project in Mexico and the Amaruq project in Nunavut, exploration related to the acquired interest in the Canadian Malartic General Partnership and increased
corporate development and project evaluation expenses between periods.
Amortization
of property, plant and mine development increased by $116.4 million to $293.5 million between the first six months of 2014 and the first six months of 2015 due
primarily to the consolidation of the acquired interest in the Canadian Malartic mine and a ramp up in gold production related to the achievement of commercial production at the Goldex mine's M and E
Zones in October 2013 and at the La India mine in February 2014.
General
and administrative expense decreased to $48.8 million during the first six months of 2015 compared with $67.8 million during the first six months of 2014 due
primarily to $16.7 million in transaction costs associated with the June 16, 2014 joint acquisition of Osisko and lower compensation expenses between periods. Partially offsetting the
overall decrease in general and administrative expense, the Company consolidated its interest in the Canadian Malartic mine's general and administrative expense for the full first six months of 2015.
Transaction costs associated with the June 2015 acquisitions of Soltoro Ltd. ("Soltoro") and Gunnarn were capitalized to the mining properties acquired as both were accounted for as
asset acquisitions.
Impairment
losses on certain available-for-sale securities of $1.0 million were recorded in the first six months of 2015 compared with $2.4 million in the first six months
of 2014. Impairment loss evaluations of available-for-sale securities are based on whether a decline in fair value is considered to be significant or prolonged. A gain of $23.7 million was
recorded on the sale of available-for-sale securities in the first six months of 2015 compared with $5.3 million in the first six months of 2014.
During
the first six months of 2015, there was a non-cash foreign currency translation gain of $6.9 million mainly attributable to a weakening of the Canadian dollar, Mexican peso
and Euro versus the US dollar at June 30, 2015 relative to December 31, 2014. A non-cash foreign currency translation loss of $1.5 million was recorded during the comparative
first six months of 2014.
In
the first six months of 2015, the Company recorded income and mining taxes expense of $38.8 million on income before income and mining taxes of $77.6 million, resulting
in an effective tax rate of 50.0%. In the first six months of 2014, the Company recorded income and mining taxes expense of $61.2 million on income before income and mining taxes of
$180.5 million, resulting in an effective tax rate of 33.9%. The increase in the effective tax rate between the first six months of 2014 and the first six months of 2015 is due primarily to
foreign exchange rate movements and an increase in taxable permanent differences.
7
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
LaRonde mine
At the LaRonde mine, gold production increased by 32.0% to 64,007 ounces in the second quarter of 2015 compared with
48,494 ounces in the second quarter of 2014 due primarily to higher gold grade and increased mill recoveries. Production costs at the LaRonde mine were $45.1 million in the second
quarter of 2015, a decrease of 3.5% compared with production costs of $46.8 million in the second quarter of 2014 driven primarily by a weakening of the Canadian dollar relative to the US
dollar, partially offset by increased mill throughput and higher local currency costs related to underground development, mill maintenance and site administration costs.
Gold
production increased by 14.0% to 122,900 ounces in the first six months of 2015 compared with 107,846 ounces in the first six months of 2014 at the LaRonde mine, due
primarily to higher gold grade. Production costs at the LaRonde mine were $91.0 million in the first six months of 2015, a decrease of 3.2% compared with production costs of
$94.0 million in the first six months of 2014 driven primarily by a weakening of the Canadian dollar relative to the US dollar, partially offset by increased mill throughput, higher local
currency costs related to underground development, mill maintenance and site administration costs and costs related to temporary issues with the paste fill piping network during the first six months
of 2015.
Lapa mine
At the Lapa mine, gold production increased by 3.3% to 19,450 ounces in the second quarter of 2015 compared with
18,821 ounces in the second quarter of 2014 due primarily to higher gold grade and increased mill recoveries. Production costs at the Lapa mine were $13.7 million in the second quarter
of 2015, a decrease of 4.9% compared with production costs of $14.4 million in the second quarter of 2014 driven primarily by a weakening of the Canadian dollar relative to the US dollar and
decreased mill throughput due to downtime related to the discovery of fatigue cracks in the feed head of the Lapa mine's ball mill.
Gold
production increased by 7.4% to 45,370 ounces in the first six months of 2015 compared with 42,230 ounces in the first six months of 2014 at the Lapa mine, due
primarily to higher gold grade and increased mill recoveries. Production costs at the Lapa mine were $27.6 million in the first six months of 2015, a decrease of 7.0% compared with production
costs of $29.7 million in the first six months of 2014 driven primarily by a weakening of the Canadian dollar relative to the US dollar and decreased mill throughput due to a reduction in the
number of stopes available for mining between periods and downtime related to the discovery of fatigue cracks in the feed head of the Lapa mine's ball mill.
Goldex mine
On October 19, 2011, the Company suspended mining operations and gold production at the Goldex mine due to geotechnical concerns
with the rock above the mining horizon. As of September 30, 2011, Agnico Eagle recorded an impairment loss on its investment in the Goldex mine (net of expected residual value) and its
underground ore stockpile. All of the remaining 1.6 million ounces of proven and probable mineral reserves at the Goldex mine, other than ore stockpiled on the surface, were reclassified as
mineral resources. An environmental remediation liability was recorded as of September 30, 2011 reflecting anticipated costs of remediation. The Goldex mill completed processing feed from the
remaining Goldex Extension Zone ("GEZ") surface stockpile in October of 2011. Operations in the GEZ remain suspended indefinitely.
During
the three and six months ended June 30, 2015, the Company incurred $0.1 million and $0.2 million in remediation costs, respectively, that were applied against
the environmental remediation liability recognized in 2011. During the three and six months ended June 30, 2014, the Company incurred $0.1 million and $2.0 million in remediation
costs, respectively, that were applied against the environmental remediation liability recognized in 2011.
Exploration
drilling continued on several mineralized zones on the Goldex mine property near the GEZ after mining operations were suspended in October of 2011. A team of independent
consultants and Agnico
8
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Eagle
staff performed a thorough review, including a preliminary economic assessment, to determine whether future mining operations on the property, including the M and E zones, would be viable. After
a review of the assessment, Agnico Eagle's Board of Directors (the "Board") approved the M and E Zones for development using existing mine infrastructure such as the shaft and mill. Commercial
production was achieved at the Goldex mine's M and E Zones in October 2013.
As
a result of the Company's restatement of comparative information under IFRS, a $109.7 million impairment loss reversal was recorded as at the January 1, 2013 IFRS
transition date. Specific long-lived assets associated with the GEZ that were impaired as at September 30, 2011 due to the suspension of mining operations, including the Goldex mine's shaft and
mill, were subsequently incorporated into the development plan for the Goldex mine's M and E Zones which was approved by the Board in July 2012.
At
the Goldex mine's M and E Zones, gold production increased by 10.6% to 26,462 ounces in the second quarter of 2015 compared with 23,929 ounces in the second quarter of
2014 due primarily to an increase in tonnes of ore milled, partially offset by lower gold grade. Production costs at the Goldex mine's M and E Zones were $16.9 million in the second quarter of
2015, an increase of 9.7% compared with production costs of $15.4 million in the second quarter of 2014 driven primarily by increased mill throughput due to mining front maturity and
productivity improvements, partially offset by a weakening of the Canadian dollar relative to the US dollar.
Gold
production increased by 28.5% to 55,712 ounces in the first six months of 2015 compared with 43,359 ounces in the first six months of 2014 at the Goldex mine's M and E
Zones, due primarily to an increase in tonnes of ore milled, higher gold grade and increased mill recoveries. Production costs at the Goldex mine's M and E Zones were $31.8 million in the first
six months of 2015, an increase of 1.7% compared with production costs of $31.3 million in the first six months of 2014 driven primarily by increased mill throughput between periods due to the
exploitation of more mature mining fronts in the first six months of 2015 as the operations ramp up continued at the Goldex mine's M and E Zones in the first six months of 2014 after achieving
commercial production in October 2013. Partially offsetting the overall increase in production costs between periods, the Canadian dollar weakened relative to the US dollar between the first
six months of 2014 and the first six months of 2015.
Meadowbank mine
At the Meadowbank mine, gold production decreased by 22.8% to 91,276 ounces in the second quarter of 2015 compared with
118,161 ounces in the second quarter of 2014 due primarily to lower gold grade. Production costs at the Meadowbank mine were $66.9 million in the second quarter of 2015, an increase of
4.8% compared with production costs of $63.8 million in the second quarter of 2014 driven primarily by higher local currency costs related to site services, mill production and mill
maintenance costs, partially offset by a weakening of the Canadian dollar relative to the US dollar and decreased mill throughput between periods.
Gold
production decreased by 34.5% to 179,799 ounces in the first six months of 2015 compared with 274,605 ounces in the first six months of 2014 at the Meadowbank mine,
due primarily to lower gold grade and decreased mill recoveries. Production costs at the Meadowbank mine were $124.0 million in the first six months of 2015, a decrease of 5.3% compared with
production costs of $130.9 million in the first six months of 2014 driven primarily by a weakening of the Canadian dollar relative to the US dollar and decreased mill throughput, partially
offset by higher local currency costs related to site services and mill maintenance costs between periods.
Canadian Malartic mine
Agnico Eagle and Yamana Gold Inc. ("Yamana") jointly acquired 100.0% of Osisko on June 16, 2014 by way of a plan of
arrangement under the Canada Business Corporations Act (the "Arrangement"). As a result of the Arrangement, Agnico Eagle and Yamana each
indirectly own 50.0% of Osisko and Canadian Malartic GP,
9
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
which
now holds the Canadian Malartic mine. Agnico Eagle and Yamana will also jointly explore, through their indirect ownership of Canadian Malartic Corporation (the successor to Osisko), the
Kirkland Lake assets, the Hammond Reef project and the Pandora and Wood-Pandora properties.
During
the second quarter of 2015, the Canadian Malartic mine produced 68,441 attributable ounces of gold and incurred attributable production costs of $42.2 million.
During the first six months of 2015, the Canadian Malartic mine produced 136,334 attributable ounces of gold and incurred attributable production costs of $83.4 million. Between its
June 16, 2014 joint acquisition date and June 30, 2014, the Canadian Malartic mine produced 11,878 attributable ounces of gold and incurred attributable production costs of
$18.3 million.
Kittila mine
At the Kittila mine, gold production increased by 31.9% to 41,986 ounces in the second quarter of 2015 compared with
31,830 ounces in the second quarter of 2014 due primarily to an increase in tonnes of ore milled, partially offset by lower gold grade and mill recoveries between periods.
Production costs at the Kittila mine were $30.8 million in the second quarter of 2015, an increase of 14.3% compared with production costs of $26.9 million in the second quarter of 2014
driven primarily by a 53.3% increase in mill throughput facilitated by the mill expansion completed in the fourth quarter of 2014 and higher local currency mill production costs between periods,
partially offset by a weakening of the Euro relative to the US dollar.
Gold
production increased by 23.1% to 86,640 ounces in the first six months of 2015 compared with 70,382 ounces in the first six months of 2014 at the Kittila mine, due
primarily to an increase in tonnes of ore milled, partially offset by lower gold grade and mill recoveries between periods. Production costs at the Kittila mine were $62.8 million in the first
six months of 2015, an increase of 11.3% compared with production costs of $56.4 million in the first six months of 2014 driven primarily by a 30.6% increase in mill throughput facilitated by
the mill expansion completed in the fourth quarter of 2014, partially offset by a weakening of the Euro relative to the US dollar between periods.
Pinos Altos mine
At the Pinos Altos mine, gold production increased by 15.2% to 50,647 ounces in the second quarter of 2015 compared with
43,978 ounces in the second quarter of 2014 due primarily to increases in gold grade and tonnes of ore milled, partially offset by a decrease in tonnes of ore stacked on the heap leach pad
between periods. Production costs at the Pinos Altos mine were $29.8 million in the second quarter of 2015, a decrease of 0.6% compared with production costs of $29.9 million in the
second quarter of 2014 driven primarily by a weakening of the Mexican peso relative to the US dollar and a decrease in tonnes of ore stacked on the heap leach pad, partially offset by an increase in
mill throughput between periods.
Gold
production increased by 13.0% to 100,753 ounces in the first six months of 2015 compared with 89,195 ounces in the first six months of 2014 at the Pinos Altos mine,
due primarily to increases in gold grade and tonnes of ore milled, partially offset by a decrease in tonnes of ore stacked on the heap leach pad between periods. Production costs at the Pinos Altos
mine were $54.0 million in the first six months of 2015, a decrease of 12.0% compared with production costs of $61.4 million in the first six months of 2014 driven primarily by a
weakening of the Mexican peso relative to the US dollar and a decrease in tonnes of ore stacked on the heap leach pad between periods, partially offset by an increase in mill throughput between
periods.
Creston Mascota deposit at Pinos Altos
At the Creston Mascota deposit at Pinos Altos, gold production increased by 39.9% to 15,606 ounces in the second quarter of 2015
compared with 11,159 ounces in the second quarter of 2014 due primarily to a 54.1% increase in ore stacked on the heap leach pad, partially offset by a decrease in gold grade between periods.
Production costs at the Creston Mascota deposit at Pinos Altos were $7.5 million in the second quarter of 2015,
10
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
an
increase of 10.2% compared with production costs of $6.8 million in the second quarter of 2014 driven primarily by an increase in tonnes of ore stacked on the heap leach pad, partially
offset by a weakening of the Mexican peso relative to the US dollar and reduced fuel consumption and power requirements between periods.
Gold
production increased by 30.6% to 28,054 ounces in the first six months of 2015 compared with 21,476 ounces in the first six months of 2014 at the Creston Mascota
deposit at Pinos Altos, due primarily to increases in ore stacked on the heap leach pad and gold grade. Production costs at the Creston Mascota deposit at Pinos Altos were $13.1 million in the
first six months of 2015, an increase of 3.8% compared with production costs of $12.6 million in the first six months of 2014 driven primarily by an increase in tonnes of ore stacked on the
heap leach pad between periods, partially offset by a weakening of the Mexican peso relative to the US dollar.
La India mine
The La India mine achieved commercial production on February 1, 2014. During the second quarter of 2015, the La India mine
produced 25,803 ounces of gold, a 44.9% increase compared with 17,809 ounces of gold in the second quarter of 2014 due primarily to an increase in ore stacked on the heap leach pad,
partially offset by a decrease in gold grade between periods. Production costs at the La India mine were $10.8 million in the second quarter of 2015, an increase of 53.4% compared with
production costs of $7.0 million in the second quarter of 2014 driven primarily by the ramp up of ore stacked on the heap leach pad to design capacity, partially offset by a weakening of the
Mexican peso relative to the US dollar.
During
the first six months of 2015, the La India mine produced 52,326 ounces of gold compared with 31,509 ounces of gold in the first six months of 2014, including
3,492 ounces of gold produced prior to the achievement of commercial production on February 1, 2014. Production costs at the La India mine were $23.3 million in the first six
months of 2015 compared with $12.8 million in the first six months of 2014 due primarily to the operations ramp up during the period in which commercial production was achieved. Partially
offsetting the overall increase in production costs between periods was the impact of a weakening of the Mexican peso relative to the US dollar.
Liquidity and Capital Resources
As at June 30, 2015, the Company's cash and cash equivalents, short-term investments and current restricted cash totaled
$183.9 million compared with $215.3 million at December 31, 2014. The Company's policy is to invest excess cash in highly liquid investments of the highest credit quality to
eliminate risks associated with these investments. Such investments with remaining maturities of greater than three months at the time of purchase are classified as short-term investments. Decisions
regarding the length of maturities are based on cash flow requirements, rates of return and various other factors.
Working
capital (current assets less current liabilities) decreased to $573.8 million at June 30, 2015 compared with $575.7 million at
December 31, 2014.
Operating Activities
Cash provided by operating activities increased by $5.6 million to $188.3 million in the second quarter of 2015 compared
with $182.7 million in the second quarter of 2014 due primarily to a 23.8% increase in gold production and the impact of a weaker Canadian dollar, Mexican peso and Euro relative to the US
dollar on costs between periods. Partially offsetting these positive impacts on cash provided by operating activities was a 7.4% decrease in the average realized price of gold and increases in
production costs and exploration and corporate development expenses between periods.
Cash
provided by operating activities decreased by $101.3 million to $331.8 million in the first six months of 2015 compared with $433.1 million in the first six
months of 2014 due primarily to a 7.8% decrease in the
11
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
average
realized price of gold and increases in production costs and exploration and corporate development expenses between periods. Partially offsetting these negative impacts on cash provided by
operating activities was a 16.7% increase in gold production and the impact of a weaker Canadian dollar, Mexican peso and Euro relative to the US dollar on costs between periods.
Investing Activities
Cash used in investing activities decreased to $104.5 million in the second quarter of 2015 compared with $488.5 million
in the second quarter of 2014 due primarily to $403.5 million in net cash expenditures associated with the Company's June 16, 2014 joint acquisition of Osisko and a $3.6 million
decrease in capital expenditures between periods. The decrease in capital expenditures between periods is mainly attributable to significant construction expenditures incurred in the second quarter of
2014 related to the Kittila mine's mill expansion project which was completed ahead of schedule in 2014.
In
the second quarter of 2015, the Company purchased $14.2 million in available-for-sale securities and warrants compared with nil in the second quarter of 2014. In the second
quarter of 2015, the Company received net proceeds of $18.6 million from the sale of available-for-sale securities and warrants compared with $39.5 million in the second quarter of 2014.
The Company's investments in available-for-sale securities consist primarily of investments in common shares of entities in the mining industry.
Cash
used in investing activities decreased to $158.4 million in the first six months of 2015 compared with $596.8 million in the first six months of 2014 due primarily to
$403.5 million in net cash expenditures associated with the Company's June 16, 2014 joint acquisition of Osisko, a $22.2 million decrease in capital expenditures and a
$16.2 million increase in net proceeds from the sale of available-for-sale securities and warrants and between periods. The decrease in capital expenditures between periods is mainly
attributable to significant construction expenditures incurred in the first six months of 2014 related to the Kittila mine's mill expansion project which was completed ahead of schedule in 2014 and
the La India mine which achieved commercial production in February 2014, partially offset by capital expenditures associated with the Canadian Malartic mine which was jointly acquired on
June 16, 2014.
In
the first six months of 2015, the Company purchased $19.4 million in available-for-sale securities and warrants compared with $13.4 million in the first six months of
2014. In the first six months of 2015, the Company received net proceeds of $56.3 million from the sale of available-for-sale securities and warrants compared with $40.1 million in the
first six months of 2014.
On
June 9, 2015, the Company acquired all of the issued and outstanding common shares of Soltoro Ltd. ("Soltoro"), including common shares issuable on the exercise of
Soltoro's outstanding options and warrants, by way of a plan of arrangement under the Canada Business Corporations Act (the "Soltoro
Arrangement"). Each outstanding share of Soltoro was exchanged under the Soltoro Arrangement for: (i) C$0.01 in cash; (ii) 0.00793 of an Agnico Eagle common share; and (iii) 1
common share of Palamina Corp., a company that was newly formed in connection with the Soltoro Arrangement. Pursuant to the Soltoro Arrangement, Soltoro transferred all mining properties located
outside of the state of Jalisco, Mexico to Palamina Corp., while Soltoro retained all mining properties located within the state of Jalisco, Mexico. Agnico Eagle had no interest in Palamina Corp. upon
the closing of the Soltoro Arrangement. Agnico Eagle's total purchase price of $26.7 million was comprised of $2.4 million in cash, including $1.6 million in cash contributed to
Palamina Corp., and 770,429 Agnico Eagle common shares issued from treasury. The Soltoro acquisition was accounted for as an asset acquisition and transaction costs associated with the
acquisition totaling $1.4 million were capitalized to the mining properties acquired.
On
June 11, 2015, the Company acquired 55.0% of the issued and outstanding common shares of Gunnarn Mining AB ("Gunnarn") from Orex Minerals Inc. ("Orex"), by way of a
share purchase agreement and joint venture agreement (the "Gunnarn Agreements"). Agnico Eagle's total purchase price of $13.1 million was
12
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
comprised
of $6.0 million in cash and $7.1 million in accrued consideration. Pursuant to the Gunnarn Agreements, the $7.1 million in accrued consideration includes two
$2.0 million payments to be made by the Company to Orex in cash or Agnico Eagle common shares at Agnico Eagle's sole discretion on June 11, 2016 and June 11, 2017, respectively.
Agnico Eagle has also committed to $7.0 million in exploration expenditures associated with the Barsele project by June 11, 2018 and may earn an additional 15.0% interest in Gunnarn if
the Company completes a pre-feasibility study related to the Barsele project. Under the Gunnarn Agreements, Agnico Eagle will hold a majority of the seats on the board of directors of Gunnarn and will
be the sole operator of the Barsele project in exchange for customary management fees. The Gunnarn acquisition was accounted for as an asset acquisition and transaction costs associated with the
acquisition totaling $0.6 million were capitalized to the mining properties acquired.
On
May 21, 2015, the Company subscribed for 62,500,000 common shares of Belo Sun Mining Corp. ("Belo Sun") in a non-brokered private placement at a price of C$0.24 per Belo
Sun common share, for total cash consideration of C$15.0 million. After closing the transaction, the Company holds approximately 17.4% of the issued and outstanding common shares of
Belo Sun.
On
June 16, 2014, Agnico Eagle and Yamana jointly acquired 100.0% of Osisko by way of the Arrangement. As a result of the Arrangement, Agnico Eagle and Yamana each indirectly own
50.0% of Osisko and Canadian Malartic GP, which now holds the Canadian Malartic mine. Agnico Eagle and Yamana will also jointly explore other properties that were held by Osisko
(now Canadian Malartic Corporation) at the time of acquisition. Agnico Eagle has recognized its interest in the assets, liabilities, revenues and expenses of Osisko in accordance with the
Company's rights and obligations prescribed by the Arrangement under IFRS. Agnico Eagle's share of Osisko's June 16, 2014 purchase price was comprised of cash payments totaling
$462.7 million and 33,923,212 Agnico Eagle common shares valued at $1,135.1 million.
Financing Activities
Cash used in financing activities of $64.5 million in the second quarter of 2015 compared with cash provided by financing
activities of $382.0 million in the second quarter of 2014 due primarily to a swing from $386.1 million in net proceeds from long-term debt in the second quarter of 2014 to a
$51.1 million net repayment of long-term debt in the second quarter of 2015.
Cash
used in financing activities of $187.7 million in the first six months of 2015 compared with cash provided by financing activities of $283.9 million in the first six
months of 2014 due primarily to a swing from $306.1 million in net proceeds from long-term debt in the first six months of 2014 to a $151.1 million net repayment of long-term debt in the
first six months of 2015.
On
April 30, 2015, Agnico Eagle declared a quarterly cash dividend of $0.08 per common share paid on June 15, 2015 to holders of record of the common shares of the Company
on June 1, 2015. Agnico Eagle has declared a cash dividend every year since 1983. In the second quarter of 2015, the Company paid dividends of $14.4 million compared with
$12.9 million in the second quarter of 2014. In the first six months of 2015, the Company paid dividends of $29.2 million compared with $24.9 million in the first six months of
2014. Although the Company expects to continue paying dividends, future dividends will be at the discretion of the Board and will be subject to factors such as income, financial condition and capital
requirements.
On
July 24, 2012, the Company closed a private placement consisting of $200.0 million of guaranteed senior unsecured notes (the "2012 Notes"). The 2012 Notes mature
in 2022 and 2024 and at issuance had a weighted average maturity of 11.0 years and weighted average yield of 4.95%. Proceeds from the 2012 Notes were used to repay amounts outstanding under the
Credit Facility.
On
September 5, 2014, the Company amended and restated its $1.2 billion Credit Facility, extending the maturity date from June 22, 2017 to June 22, 2019 and
amending pricing terms. As at June 30, 2015, the Company's outstanding balance under the Credit Facility was $375.0 million. Credit Facility availability is
13
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
reduced
by outstanding letters of credit, amounting to $1.0 million at June 30, 2015. As at June 30, 2015, $824.0 million was available for future drawdown under the Credit
Facility.
On
November 5, 2013, the Company amended its credit agreement with a financial institution relating to its uncommitted letter of credit facility (the "Letter of Credit
Facility"). The amount available under the Letter of Credit Facility increased from C$150.0 million to C$175.0 million. The obligations of the Company under the Letter of Credit Facility
are guaranteed by certain of its subsidiaries. The Letter of Credit Facility may be used to support the reclamation obligations or non-financial or performance obligations of the Company or its
subsidiaries. As at June 30, 2015, $147.7 million had been drawn under the Letter of Credit Facility. On August 22, 2014, the financial institution and the Company agreed that the
Company may draw up to C$185.0 million under the Letter of Credit Facility.
On
April 7, 2010, the Company closed a private placement consisting of $600.0 million of guaranteed senior unsecured notes due in 2017, 2020 and 2022 (the "2010
Notes") with a weighted average maturity of 9.84 years and weighted average yield of 6.59%. Proceeds from the offering of the 2010 Notes were used to repay amounts under the Company's then
outstanding credit facilities.
In
connection with its joint acquisition of Osisko on June 16, 2014, Canadian Malartic GP was assigned and assumed certain outstanding debt and finance lease obligations of
Osisko relating to the Canadian Malartic mine. Agnico Eagle's indirect attributable interest in such debt and finance lease obligations is as follows:
-
- A secured loan facility in the principal amount of C$75.0 million ($69.1 million) with scheduled
C$20.0 million repayments on June 30, 2015, June 30, 2016 and June 30, 2017 and a 6.875% interest rate. A scheduled repayment of C$15.0 million
($14.1 million) was made subsequent to the June 16, 2014 acquisition date and the scheduled C$20.0 million ($16.0 million) repayment was made on June 30, 2015,
resulting in attributable outstanding principal of $32.1 million as at June 30, 2015. On September 29, 2014, Canadian Malartic GP amended the acquired secured loan facility
(the "CMGP Loan") with no change to maturity or pricing terms.
-
- Senior unsecured convertible debentures (the "Convertible Debentures") with principal outstanding of
C$37.5 million ($34.6 million), a November 2017 maturity date and a 6.875% interest rate. As at the June 16, 2014 acquisition date, the Convertible Debentures had an
attributable fair value of $44.9 million. On June 30, 2015, the negotiated early settlement of all of the Convertible Debentures was completed. As a result of this settlement,
871,680 Agnico Eagle common shares with a fair value of $24.8 million were released from a depositary to the holders of the Convertible Debentures along with a cash payment of
$10.1 million to settle the Company's obligation. In the three months ended June 30, 2015 a $2.0 million mark-to-market gain was recorded in the other expenses line item of the
condensed interim consolidated statements of income and comprehensive income related to the Convertible Debentures, while a $2.4 million mark-to-market loss was recorded in the six months ended
June 30, 2015. In the three and six months ended June 30, 2014, a $4.2 million mark-to-market loss was recorded related to the Convertible Debentures. Additional cash
consideration of $3.2 million was paid to the holders of the Convertible Debentures upon settlement and was recorded in the other expenses line item of the condensed interim consolidated
statements of income and comprehensive income. As at June 30, 2015, the Convertible Debentures had principal outstanding of nil.
-
- A loan with principal outstanding of C$2.1 million ($2.0 million) with monthly repayments scheduled through
the first quarter of 2015 and a 0.0% interest rate. As at June 30, 2015, the Company's attributable loan principal outstanding amounted to nil.
-
- Secured finance lease obligations of C$38.3 million ($35.3 million) provided in separate tranches with
maturities ranging between 2015 and 2019 and a 7.5% interest rate. As at June 30, 2015, the Company's attributable finance lease obligations amounted to $22.5 million.
14
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
The
Company was in compliance with all covenants contained in the Credit Facility, 2012 Notes and 2010 Notes as at June 30, 2015. Canadian Malartic GP was in compliance
with all CMGP Loan covenants as at June 30, 2015.
The
Company issued common shares for gross proceeds of $7.3 million in the second quarter of 2015 and $11.3 million in the second quarter of 2014 attributable to employee
stock option plan exercises, issuances under the incentive share purchase plan and the dividend re-investment plan. Gross proceeds from the issuance of common shares amounted to $17.9 million
in the first six months of 2015 and $15.9 million in the first six months of 2014.
Risk Profile
Volatility remains high in global financial markets and weakness in the global economy continues to have an impact on the profitability
and liquidity of many businesses. Although there are signs of stabilization, the timing of a return to historical market conditions is uncertain. Weak economic conditions and volatile financial
markets have a potential significant impact on Agnico Eagle's cost and availability of financing and overall liquidity. The volatility in gold, silver, zinc and copper prices directly affects Agnico
Eagle's revenues, earnings and cash flow. Volatile energy, commodity and consumables prices and currency exchange rates impact production costs. The volatility of global stock markets impacts the
valuation of the Company's equity investments.
International Financial Reporting Standards
The Company has adopted IFRS as its basis of accounting, replacing US GAAP effective July 1, 2014. As a result, Agnico Eagle's
condensed interim consolidated financial statements for the second quarter of 2015 are reported in accordance with IFRS, with comparative information restated under IFRS and a transition date of
January 1, 2013.
Generally
Accepted Accounting Principles ("GAAP") for Canadian publicly accountable enterprises became IFRS as issued by the International Accounting Standards Board in 2011 and the US
Securities and Exchange Commission ("SEC") in the United States accepts financial statements prepared in accordance with IFRS without reconciliation to US GAAP from foreign private issuers.
Accordingly, Agnico Eagle decided to
convert its basis of accounting to IFRS to enhance the comparability of its financial statements to the Company's peers in the mining industry.
Agnico
Eagle developed and executed a detailed IFRS conversion plan including an assessment phase, an impact analysis and design phase and an implementation phase, culminating in the
Company's initial reporting in accordance with IFRS in the third quarter of 2014.
Disclosure Controls and Procedures and Internal Controls over Financial Reporting
Pursuant to regulations adopted by the SEC under the Sarbanes-Oxley Act of 2002 and those of the CSA, the Company's management
evaluates the effectiveness of the design and operation of the Company's disclosure controls as well as its procedures and internal controls over financial reporting. This evaluation is completed
under the supervision of, and with the participation of, the Company's Chief Executive Officer ("CEO") and Chief Financial Officer ("CFO").
Management
of the Company, with the participation of the CEO and CFO, is responsible for establishing and maintaining adequate internal controls over financial reporting. The Company's
internal controls over financial reporting are designed to provide reasonable assurance regarding the reliability of financial reporting and preparation of consolidated financial statements for
external purposes in accordance with generally accepted accounting principles. There have been no significant changes in the Company's internal control over financial reporting in the second quarter
of 2015 that have materially affected, or are reasonably likely to materially affect, the reliability of financial reporting.
15
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
The
Company's management, including the CEO and CFO, recognizes there are inherent limitations in any system of disclosure controls and procedures and internal controls over financial
reporting, no matter how well designed. Therefore, even those systems that are considered to be effective can provide only reasonable assurance that the objectives of the control system
are met.
Non-GAAP Financial Performance Measures
This MD&A presents certain financial performance measures, including adjusted net income, total cash costs per ounce of gold produced,
minesite costs per tonne and all-in sustaining costs per ounce of gold produced, that are not recognized measures under IFRS. This data may not be comparable to data presented by other gold producers.
Non-GAAP financial performance measures should be considered together with other data prepared in accordance with IFRS.
Adjusted Net Income
Adjusted net income is not a recognized measure under IFRS and this data may not be comparable to data presented by other gold
producers. This measure is calculated by adjusting net income as recorded in the condensed interim consolidated statements of income and comprehensive income for non-recurring, unusual and other
items. The Company believes that this generally accepted industry measure allows the evaluation of the results of continuing operations and is useful in making comparisons between periods. Adjusted
net income is intended to provide investors with information about the Company's continuing income generating capabilities. Management uses this measure to monitor and plan for the operating
performance of the Company in conjunction with other data prepared in accordance with IFRS.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended
June 30, |
|
Six Months Ended
June 30, |
|
(thousands of United States dollars)
|
|
2015 |
|
2014 |
|
2015 |
|
2014 |
|
Net income for the period |
|
$ |
10,083 |
|
$ |
22,158 |
|
$ |
38,826 |
|
$ |
119,303 |
|
Impairment loss on available-for-sale securities |
|
|
345 |
|
|
2,419 |
|
|
1,030 |
|
|
2,419 |
|
Gain on sale of available-for-sale securities |
|
|
(2,675 |
) |
|
(5,016 |
) |
|
(23,724 |
) |
|
(5,289 |
) |
Foreign currency translation loss (gain) |
|
|
4,779 |
|
|
6,568 |
|
|
(6,911 |
) |
|
1,509 |
|
Stock options expense |
|
|
4,059 |
|
|
4,577 |
|
|
11,850 |
|
|
13,604 |
|
Mark-to-market (gain) loss on warrants |
|
|
(789 |
) |
|
(2,197 |
) |
|
1,770 |
|
|
(5,326 |
) |
Loss (gain) on settlement of warrants |
|
|
592 |
|
|
|
|
|
(9,072 |
) |
|
185 |
|
Mark-to-market (gain) loss on Convertible Debentures |
|
|
(2,031 |
) |
|
3,846 |
|
|
2,416 |
|
|
3,846 |
|
Income and mining taxes adjustments |
|
|
(1,828 |
) |
|
872 |
|
|
13,393 |
|
|
2,380 |
|
Other |
|
|
5,925 |
|
|
|
|
|
20,292 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Adjusted net income for the period |
|
$ |
18,460 |
|
$ |
33,227 |
|
$ |
49,870 |
|
$ |
132,631 |
|
|
|
|
|
|
|
|
|
|
|
Net income per share basic |
|
$ |
0.05 |
|
$ |
0.12 |
|
$ |
0.18 |
|
$ |
0.66 |
|
Net income per share diluted |
|
$ |
0.05 |
|
$ |
0.12 |
|
$ |
0.18 |
|
$ |
0.66 |
|
Adjusted net income per share basic |
|
$ |
0.09 |
|
$ |
0.18 |
|
$ |
0.23 |
|
$ |
0.74 |
|
Adjusted net income per share diluted |
|
$ |
0.09 |
|
$ |
0.18 |
|
$ |
0.23 |
|
$ |
0.74 |
|
16
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Total Cash Costs per Ounce of Gold Produced and Minesite Costs per Tonne
The Company believes that total cash costs per ounce of gold produced and minesite costs per tonne are realistic indicators of
operating performance and facilitate period over period comparisons. However, both of these non-GAAP generally accepted industry measures should be considered together with other data prepared in
accordance with IFRS. These measures, taken by themselves, are not necessarily indicative of operating costs or cash flow measures prepared in accordance with IFRS.
Total
cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product
metal revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the condensed interim consolidated statements of income
and comprehensive income for by-product revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and other adjustments, and then dividing by the number of
ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except
that no adjustment for by-product metal revenues is made. Accordingly, the calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production
costs or smelting, refining and marketing charges associated with the production and sale of by-product metals. Total cash costs per ounce of gold produced is intended to provide information about the
cash generating capabilities of the Company's mining operations. Management also uses these measures to monitor the performance of the Company's mining operations. As market prices for gold are quoted
on a per ounce basis, using the total cash cost per ounce of gold produced on a by-product basis measure allows management to assess a mine's cash generating capabilities at various gold prices.
Management is aware that these per ounce measures of performance can be affected by fluctuations in exchange rates and, in the case of total cash costs per ounce of gold produced on a by-product
basis, by-product metal prices. Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne (discussed below) as well as other data
prepared in accordance with IFRS. Management also performs sensitivity analyses in order to quantify the effects of fluctuating exchange rates and metal prices.
Agnico
Eagle's primary business is gold production and the focus of its current operations and future development is on maximizing returns from gold production, with other metal
production being incidental to the gold production process. Accordingly, all metals other than gold are considered by-products.
Total
cash costs per ounce of gold produced is presented on a by-product basis because (i) the majority of the Company's revenues are gold revenues, (ii) the Company mines
ore, which contains gold, silver, zinc, copper and other metals, (iii) it is not possible to specifically assign all costs to revenues from the gold, silver, zinc, copper and other metals the
Company produces, and (iv) it is a method used by management and the Board to monitor operations.
Minesite
costs per tonne is calculated by adjusting production costs as shown in the condensed interim consolidated statements of income and comprehensive income for unsold concentrate
inventory production costs and other adjustments and then dividing by tonnes of ore processed. As the total cash costs per ounce of gold produced measure can be impacted by fluctuations in by-product
metal prices and exchange rates, management believes that the minesite costs per tonne measure provides additional information regarding the performance of mining operations. Management is aware that
this per tonne measure of performance can be impacted by fluctuations in production levels and compensates for this inherent limitation by using this measure in conjunction with production costs
prepared in accordance with IFRS.
Total
cash costs per ounce of gold produced and minesite costs per tonne have been restated to conform with IFRS for all reported periods.
The
following tables set out a reconciliation of total cash costs per ounce of gold produced (on both a by-product basis and co-product basis) and minesite costs per tonne to
production costs, exclusive of amortization, as presented in the condensed interim consolidated statements of income and comprehensive income in accordance with IFRS.
17
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the
three and six months ended June 30, 2015
Total Production Costs by Mine
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
LaRonde mine |
|
$ |
45,133 |
|
$ |
46,758 |
|
$ |
90,999 |
|
$ |
94,037 |
|
Lapa mine |
|
|
13,656 |
|
|
14,356 |
|
|
27,641 |
|
|
29,706 |
|
Goldex mine |
|
|
16,913 |
|
|
15,419 |
|
|
31,780 |
|
|
31,264 |
|
Meadowbank mine |
|
|
66,888 |
|
|
63,808 |
|
|
123,983 |
|
|
130,888 |
|
Canadian Malartic mine(i) |
|
|
42,185 |
|
|
18,333 |
|
|
83,371 |
|
|
18,333 |
|
Kittila mine |
|
|
30,777 |
|
|
26,925 |
|
|
62,776 |
|
|
56,384 |
|
Pinos Altos mine |
|
|
29,768 |
|
|
29,940 |
|
|
53,979 |
|
|
61,359 |
|
Creston Mascota deposit at Pinos Altos |
|
|
7,501 |
|
|
6,809 |
|
|
13,107 |
|
|
12,633 |
|
La India mine(ii) |
|
|
10,791 |
|
|
7,035 |
|
|
23,256 |
|
|
12,845 |
|
|
|
|
|
|
|
|
|
|
|
Production costs per the condensed interim consolidated statements of income and comprehensive income |
|
$ |
263,612 |
|
$ |
229,383 |
|
$ |
510,892 |
|
$ |
447,449 |
|
|
|
|
|
|
|
|
|
|
|
Reconciliation of Production Costs to Total Cash Costs per Ounce of Gold Produced(iii) by Mine and Reconciliation of Production Costs to Minesite
Costs per Tonne(iv) by Mine
LaRonde Mine Total Cash Costs per Ounce of Gold Produced(iii)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
45,133 |
|
$ |
46,758 |
|
$ |
90,999 |
|
$ |
94,037 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(v) |
|
|
6,786 |
|
|
10,701 |
|
|
13,464 |
|
|
19,164 |
|
|
|
|
|
|
|
|
|
|
|
Cash operating costs (co-product basis) |
|
$ |
51,919 |
|
$ |
57,459 |
|
$ |
104,463 |
|
$ |
113,201 |
|
By-product metal revenues |
|
|
(12,701 |
) |
|
(21,947 |
) |
|
(23,835 |
) |
|
(43,645 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (by-product basis) |
|
$ |
39,218 |
|
$ |
35,512 |
|
$ |
80,628 |
|
$ |
69,556 |
|
Gold production (ounces) |
|
|
64,007 |
|
|
48,494 |
|
|
122,900 |
|
|
107,846 |
|
Total cash costs per ounce of gold produced ($ per ounce)(iii): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-product basis |
|
$ |
811 |
|
$ |
1,185 |
|
$ |
850 |
|
$ |
1,050 |
|
|
|
|
|
|
|
|
|
|
|
By-product basis |
|
$ |
613 |
|
$ |
732 |
|
$ |
656 |
|
$ |
645 |
|
|
|
|
|
|
|
|
|
|
|
18
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
LaRonde Mine Minesite Costs per Tonne(iv)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
45,133 |
|
$ |
46,758 |
|
$ |
90,999 |
|
$ |
94,037 |
|
Inventory and other adjustments(vi) |
|
|
854 |
|
|
2,666 |
|
|
1,719 |
|
|
3,814 |
|
|
|
|
|
|
|
|
|
|
|
Minesite operating costs |
|
$ |
45,987 |
|
$ |
49,424 |
|
$ |
92,718 |
|
$ |
97,851 |
|
Minesite operating costs (thousands of C$) |
|
C$ |
56,474 |
|
C$ |
53,898 |
|
C$ |
114,263 |
|
C$ |
107,342 |
|
Tonnes of ore milled (thousands of tonnes) |
|
|
568 |
|
|
564 |
|
|
1,126 |
|
|
1,121 |
|
|
|
|
|
|
|
|
|
|
|
Minesite costs per tonne (C$)(iv) |
|
C$ |
99 |
|
C$ |
96 |
|
C$ |
101 |
|
C$ |
96 |
|
|
|
|
|
|
|
|
|
|
|
Lapa Mine Total Cash Costs per Ounce of Gold Produced(iii)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
13,656 |
|
$ |
14,356 |
|
$ |
27,641 |
|
$ |
29,706 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(v) |
|
|
(459 |
) |
|
1,307 |
|
|
290 |
|
|
1,467 |
|
|
|
|
|
|
|
|
|
|
|
Cash operating costs (co-product basis) |
|
$ |
13,197 |
|
$ |
15,663 |
|
$ |
27,931 |
|
$ |
31,173 |
|
By-product metal revenues |
|
|
(1 |
) |
|
(1 |
) |
|
(18 |
) |
|
(3 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (by-product basis) |
|
$ |
13,196 |
|
$ |
15,662 |
|
$ |
27,913 |
|
$ |
31,170 |
|
Gold production (ounces) |
|
|
19,450 |
|
|
18,821 |
|
|
45,370 |
|
|
42,230 |
|
Total cash costs per ounce of gold produced ($ per ounce)(iii): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-product basis |
|
$ |
679 |
|
$ |
832 |
|
$ |
616 |
|
$ |
738 |
|
|
|
|
|
|
|
|
|
|
|
By-product basis |
|
$ |
678 |
|
$ |
832 |
|
$ |
615 |
|
$ |
738 |
|
|
|
|
|
|
|
|
|
|
|
Lapa Mine Minesite Costs per Tonne(iv)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
13,656 |
|
$ |
14,356 |
|
$ |
27,641 |
|
$ |
29,706 |
|
Inventory and other adjustments(vi) |
|
|
(658 |
) |
|
1,340 |
|
|
(109 |
) |
|
1,458 |
|
|
|
|
|
|
|
|
|
|
|
Minesite operating costs |
|
$ |
12,998 |
|
$ |
15,696 |
|
$ |
27,532 |
|
$ |
31,164 |
|
Minesite operating costs (thousands of C$) |
|
C$ |
15,919 |
|
C$ |
17,117 |
|
C$ |
33,996 |
|
C$ |
34,187 |
|
Tonnes of ore milled (thousands of tonnes) |
|
|
126 |
|
|
163 |
|
|
278 |
|
|
320 |
|
|
|
|
|
|
|
|
|
|
|
Minesite costs per tonne (C$)(iv) |
|
C$ |
126 |
|
C$ |
105 |
|
C$ |
122 |
|
C$ |
107 |
|
|
|
|
|
|
|
|
|
|
|
19
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Goldex Mine Total Cash Costs per Ounce of Gold Produced(iii)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
16,913 |
|
$ |
15,419 |
|
$ |
31,780 |
|
$ |
31,264 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(v) |
|
|
(163 |
) |
|
626 |
|
|
810 |
|
|
(411 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (co-product basis) |
|
$ |
16,750 |
|
$ |
16,045 |
|
$ |
32,590 |
|
$ |
30,853 |
|
By-product metal revenues |
|
|
(5 |
) |
|
(5 |
) |
|
(13 |
) |
|
(11 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (by-product basis) |
|
$ |
16,745 |
|
$ |
16,040 |
|
$ |
32,577 |
|
$ |
30,842 |
|
Gold production (ounces) |
|
|
26,462 |
|
|
23,929 |
|
|
55,712 |
|
|
43,359 |
|
Total cash costs per ounce of gold produced ($ per ounce)(iii): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-product basis |
|
$ |
633 |
|
$ |
671 |
|
$ |
585 |
|
$ |
712 |
|
|
|
|
|
|
|
|
|
|
|
By-product basis |
|
$ |
633 |
|
$ |
670 |
|
$ |
585 |
|
$ |
711 |
|
|
|
|
|
|
|
|
|
|
|
Goldex Mine Minesite Costs per Tonne(iv)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
16,913 |
|
$ |
15,419 |
|
$ |
31,780 |
|
$ |
31,264 |
|
Inventory and other adjustments(vi) |
|
|
(328 |
) |
|
686 |
|
|
432 |
|
|
(332 |
) |
|
|
|
|
|
|
|
|
|
|
Minesite operating costs |
|
$ |
16,585 |
|
$ |
16,105 |
|
$ |
32,212 |
|
$ |
30,932 |
|
Minesite operating costs (thousands of C$) |
|
C$ |
20,318 |
|
C$ |
17,563 |
|
C$ |
39,635 |
|
C$ |
33,932 |
|
Tonnes of ore milled (thousands of tonnes) |
|
|
604 |
|
|
518 |
|
|
1,171 |
|
|
1,003 |
|
|
|
|
|
|
|
|
|
|
|
Minesite costs per tonne (C$)(iv) |
|
C$ |
34 |
|
C$ |
34 |
|
C$ |
34 |
|
C$ |
34 |
|
|
|
|
|
|
|
|
|
|
|
20
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Meadowbank Mine Total Cash Costs per Ounce of Gold Produced(iii)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
66,888 |
|
$ |
63,808 |
|
$ |
123,983 |
|
$ |
130,888 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(v) |
|
|
(3,094 |
) |
|
3,168 |
|
|
(554 |
) |
|
4,479 |
|
|
|
|
|
|
|
|
|
|
|
Cash operating costs (co-product basis) |
|
$ |
63,794 |
|
$ |
66,976 |
|
$ |
123,429 |
|
$ |
135,367 |
|
By-product metal revenues |
|
|
(978 |
) |
|
(493 |
) |
|
(2,667 |
) |
|
(1,045 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (by-product basis) |
|
$ |
62,816 |
|
$ |
66,483 |
|
$ |
120,762 |
|
$ |
134,322 |
|
Gold production (ounces) |
|
|
91,276 |
|
|
118,161 |
|
|
179,799 |
|
|
274,605 |
|
Total cash costs per ounce of gold produced ($ per ounce)(iii): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-product basis |
|
$ |
699 |
|
$ |
567 |
|
$ |
686 |
|
$ |
493 |
|
|
|
|
|
|
|
|
|
|
|
By-product basis |
|
$ |
688 |
|
$ |
563 |
|
$ |
672 |
|
$ |
489 |
|
|
|
|
|
|
|
|
|
|
|
Meadowbank Mine Minesite Costs per Tonne(iv)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
66,888 |
|
$ |
63,808 |
|
$ |
123,983 |
|
$ |
130,888 |
|
Inventory and other adjustments(vi) |
|
|
(3,768 |
) |
|
3,551 |
|
|
(2,074 |
) |
|
4,939 |
|
|
|
|
|
|
|
|
|
|
|
Minesite operating costs |
|
$ |
63,120 |
|
$ |
67,359 |
|
$ |
121,909 |
|
$ |
135,827 |
|
Minesite operating costs (thousands of C$) |
|
C$ |
75,290 |
|
C$ |
73,457 |
|
C$ |
145,917 |
|
C$ |
149,002 |
|
Tonnes of ore milled (thousands of tonnes) |
|
|
1,019 |
|
|
1,051 |
|
|
2,010 |
|
|
2,045 |
|
|
|
|
|
|
|
|
|
|
|
Minesite costs per tonne (C$)(iv) |
|
C$ |
74 |
|
C$ |
70 |
|
C$ |
73 |
|
C$ |
73 |
|
|
|
|
|
|
|
|
|
|
|
21
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Canadian Malartic Mine Total Cash Costs per Ounce of Gold Produced(i)(iii)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
42,185 |
|
$ |
18,333 |
|
$ |
83,371 |
|
$ |
18,333 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(i)(v) |
|
|
688 |
|
|
(10,721 |
) |
|
3,554 |
|
|
(10,721 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (co-product basis) |
|
$ |
42,873 |
|
$ |
7,612 |
|
$ |
86,925 |
|
$ |
7,612 |
|
By-product metal revenues |
|
|
(1,177 |
) |
|
(329 |
) |
|
(2,319 |
) |
|
(329 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (by-product basis) |
|
$ |
41,696 |
|
$ |
7,283 |
|
$ |
84,606 |
|
$ |
7,283 |
|
Gold production (ounces) |
|
|
68,441 |
|
|
11,878 |
|
|
136,334 |
|
|
11,878 |
|
Total cash costs per ounce of gold produced ($ per ounce)(iii): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-product basis |
|
$ |
626 |
|
$ |
641 |
|
$ |
638 |
|
$ |
641 |
|
|
|
|
|
|
|
|
|
|
|
By-product basis |
|
$ |
609 |
|
$ |
613 |
|
$ |
621 |
|
$ |
613 |
|
|
|
|
|
|
|
|
|
|
|
Canadian Malartic Mine Minesite Costs per Tonne(i)(iv)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
42,185 |
|
$ |
18,333 |
|
$ |
83,371 |
|
$ |
18,333 |
|
Inventory and other adjustments(vi) |
|
|
48 |
|
|
(10,754 |
) |
|
1,733 |
|
|
(10,754 |
) |
|
|
|
|
|
|
|
|
|
|
Minesite operating costs |
|
$ |
42,233 |
|
$ |
7,579 |
|
$ |
85,104 |
|
$ |
7,579 |
|
Minesite operating costs (thousands of C$) |
|
C$ |
51,937 |
|
C$ |
8,160 |
|
C$ |
105,126 |
|
C$ |
8,160 |
|
Tonnes of ore milled (thousands of tonnes) |
|
|
2,307 |
|
|
398 |
|
|
4,647 |
|
|
398 |
|
|
|
|
|
|
|
|
|
|
|
Minesite costs per tonne (C$)(iv) |
|
C$ |
23 |
|
C$ |
21 |
|
C$ |
23 |
|
C$ |
21 |
|
|
|
|
|
|
|
|
|
|
|
22
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Kittila Mine Total Cash Costs per Ounce of Gold Produced(iii)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
30,777 |
|
$ |
26,925 |
|
$ |
62,776 |
|
$ |
56,384 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(v) |
|
|
1,855 |
|
|
529 |
|
|
312 |
|
|
1,762 |
|
|
|
|
|
|
|
|
|
|
|
Cash operating costs (co-product basis) |
|
$ |
32,632 |
|
$ |
27,454 |
|
$ |
63,088 |
|
$ |
58,146 |
|
By-product metal revenues |
|
|
(38 |
) |
|
(24 |
) |
|
(73 |
) |
|
(61 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (by-product basis) |
|
$ |
32,594 |
|
$ |
27,430 |
|
$ |
63,015 |
|
$ |
58,085 |
|
Gold production (ounces) |
|
|
41,986 |
|
|
31,830 |
|
|
86,640 |
|
|
70,382 |
|
Total cash costs per ounce of gold produced ($ per ounce)(iii): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-product basis |
|
$ |
777 |
|
$ |
863 |
|
$ |
728 |
|
$ |
826 |
|
|
|
|
|
|
|
|
|
|
|
By-product basis |
|
$ |
776 |
|
$ |
862 |
|
$ |
727 |
|
$ |
825 |
|
|
|
|
|
|
|
|
|
|
|
Kittila Mine Minesite Costs per Tonne(iv)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
30,777 |
|
$ |
26,925 |
|
$ |
62,776 |
|
$ |
56,384 |
|
Inventory and other adjustments(vi) |
|
|
1,858 |
|
|
414 |
|
|
199 |
|
|
1,496 |
|
|
|
|
|
|
|
|
|
|
|
Minesite operating costs |
|
$ |
32,635 |
|
$ |
27,339 |
|
$ |
62,975 |
|
$ |
57,880 |
|
Minesite operating costs (thousands of €) |
|
€ |
28,296 |
|
€ |
19,939 |
|
€ |
55,010 |
|
€ |
42,236 |
|
Tonnes of ore milled (thousands of tonnes) |
|
|
379 |
|
|
247 |
|
|
725 |
|
|
555 |
|
|
|
|
|
|
|
|
|
|
|
Minesite costs per tonne (€)(iv) |
|
€ |
75 |
|
€ |
81 |
|
€ |
76 |
|
€ |
76 |
|
|
|
|
|
|
|
|
|
|
|
23
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Pinos Altos Mine Total Cash Costs per Ounce of Gold Produced(iii)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
29,768 |
|
$ |
29,940 |
|
$ |
53,979 |
|
$ |
61,359 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(v) |
|
|
(892 |
) |
|
913 |
|
|
2,353 |
|
|
911 |
|
|
|
|
|
|
|
|
|
|
|
Cash operating costs (co-product basis) |
|
$ |
28,876 |
|
$ |
30,853 |
|
$ |
56,332 |
|
$ |
62,270 |
|
By-product metal revenues |
|
|
(9,404 |
) |
|
(8,165 |
) |
|
(18,978 |
) |
|
(17,885 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (by-product basis) |
|
$ |
19,472 |
|
$ |
22,688 |
|
$ |
37,354 |
|
$ |
44,385 |
|
Gold production (ounces) |
|
|
50,647 |
|
|
43,978 |
|
|
100,753 |
|
|
89,195 |
|
Total cash costs per ounce of gold produced ($ per ounce)(iii): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-product basis |
|
$ |
570 |
|
$ |
702 |
|
$ |
559 |
|
$ |
698 |
|
|
|
|
|
|
|
|
|
|
|
By-product basis |
|
$ |
384 |
|
$ |
516 |
|
$ |
371 |
|
$ |
498 |
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos Mine Minesite Costs per Tonne(iv)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
29,768 |
|
$ |
29,940 |
|
$ |
53,979 |
|
$ |
61,359 |
|
Inventory and other adjustments(vi) |
|
|
(1,732 |
) |
|
466 |
|
|
948 |
|
|
(96 |
) |
|
|
|
|
|
|
|
|
|
|
Minesite operating costs |
|
$ |
28,036 |
|
$ |
30,406 |
|
$ |
54,927 |
|
$ |
61,263 |
|
Tonnes of ore processed (thousands of tonnes) |
|
|
648 |
|
|
656 |
|
|
1,231 |
|
|
1,279 |
|
|
|
|
|
|
|
|
|
|
|
Minesite costs per tonne (US$)(iv) |
|
$ |
43 |
|
$ |
46 |
|
$ |
45 |
|
$ |
48 |
|
|
|
|
|
|
|
|
|
|
|
24
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Creston Mascota deposit at Pinos Altos Total Cash Costs per Ounce of Gold Produced(iii)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
7,501 |
|
$ |
6,809 |
|
$ |
13,107 |
|
$ |
12,633 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(v) |
|
|
(611 |
) |
|
403 |
|
|
(143 |
) |
|
1,084 |
|
|
|
|
|
|
|
|
|
|
|
Cash operating costs (co-product basis) |
|
$ |
6,890 |
|
$ |
7,212 |
|
$ |
12,964 |
|
$ |
13,717 |
|
By-product metal revenues |
|
|
(611 |
) |
|
(376 |
) |
|
(1,158 |
) |
|
(710 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (by-product basis) |
|
$ |
6,279 |
|
$ |
6,836 |
|
$ |
11,806 |
|
$ |
13,007 |
|
Gold production (ounces) |
|
|
15,606 |
|
|
11,159 |
|
|
28,054 |
|
|
21,476 |
|
Total cash costs per ounce of gold produced ($ per ounce)(iii): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-product basis |
|
$ |
441 |
|
$ |
646 |
|
$ |
462 |
|
$ |
639 |
|
|
|
|
|
|
|
|
|
|
|
By-product basis |
|
$ |
402 |
|
$ |
613 |
|
$ |
421 |
|
$ |
606 |
|
|
|
|
|
|
|
|
|
|
|
Creston Mascota deposit at Pinos Altos Minesite Costs per Tonne(iv)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
7,501 |
|
$ |
6,809 |
|
$ |
13,107 |
|
$ |
12,633 |
|
Inventory and other adjustments(vi) |
|
|
(691 |
) |
|
336 |
|
|
(292 |
) |
|
918 |
|
|
|
|
|
|
|
|
|
|
|
Minesite operating costs |
|
$ |
6,810 |
|
$ |
7,145 |
|
$ |
12,815 |
|
$ |
13,551 |
|
Tonnes of ore processed (thousands of tonnes) |
|
|
609 |
|
|
395 |
|
|
1,135 |
|
|
774 |
|
|
|
|
|
|
|
|
|
|
|
Minesite costs per tonne (US$)(iv) |
|
$ |
11 |
|
$ |
18 |
|
$ |
11 |
|
$ |
18 |
|
|
|
|
|
|
|
|
|
|
|
25
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
La India Mine Total Cash Costs per Ounce of Gold Produced(ii)(iii)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
10,791 |
|
$ |
7,035 |
|
$ |
23,256 |
|
$ |
12,845 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(ii)(v) |
|
|
963 |
|
|
1,676 |
|
|
718 |
|
|
816 |
|
|
|
|
|
|
|
|
|
|
|
Cash operating costs (co-product basis) |
|
$ |
11,754 |
|
$ |
8,711 |
|
$ |
23,974 |
|
$ |
13,661 |
|
By-product metal revenues |
|
|
(1,179 |
) |
|
(830 |
) |
|
(2,311 |
) |
|
(1,429 |
) |
|
|
|
|
|
|
|
|
|
|
Cash operating costs (by-product basis) |
|
$ |
10,575 |
|
$ |
7,881 |
|
$ |
21,663 |
|
$ |
12,232 |
|
Gold production (ounces) |
|
|
25,803 |
|
|
17,809 |
|
|
52,326 |
|
|
28,017 |
|
Total cash costs per ounce of gold produced ($ per ounce)(iii): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-product basis |
|
$ |
456 |
|
$ |
489 |
|
$ |
458 |
|
$ |
488 |
|
|
|
|
|
|
|
|
|
|
|
By-product basis |
|
$ |
410 |
|
$ |
443 |
|
$ |
414 |
|
$ |
437 |
|
|
|
|
|
|
|
|
|
|
|
La India Mine Minesite Costs per Tonne(ii)(iv)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(thousands of United States dollars, except as noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs |
|
$ |
10,791 |
|
$ |
7,035 |
|
$ |
23,256 |
|
$ |
12,845 |
|
Inventory and other adjustments(vi) |
|
|
771 |
|
|
1,518 |
|
|
362 |
|
|
578 |
|
|
|
|
|
|
|
|
|
|
|
Minesite operating costs |
|
$ |
11,562 |
|
$ |
8,553 |
|
$ |
23,618 |
|
$ |
13,423 |
|
Tonnes of ore processed (thousands of tonnes) |
|
|
1,360 |
|
|
1,138 |
|
|
2,738 |
|
|
1,825 |
|
|
|
|
|
|
|
|
|
|
|
Minesite costs per tonne (US$)(iv) |
|
$ |
9 |
|
$ |
8 |
|
$ |
9 |
|
$ |
7 |
|
|
|
|
|
|
|
|
|
|
|
Notes:
- (i)
- On
June 16, 2014, Agnico Eagle and Yamana jointly acquired 100.0% of Osisko by way of a court-approved plan of arrangement (the "Arrangement") under
the Canada Business Corporations Act. As a result of the Arrangement, Agnico Eagle and Yamana each indirectly own 50.0% of Osisko (now Canadian
Malartic Corporation) and Canadian Malartic GP, which now holds the Canadian Malartic mine. The information set out in this table reflects the Company's 50.0% interest in the Canadian Malartic
mine since the date of acquisition.
- (ii)
- The
La India mine achieved commercial production on February 1, 2014. 3,492 ounces of payable gold production were excluded from the
calculation of total cash costs per ounce of gold produced in the six months ended June 30, 2014 as they were produced prior to the achievement of commercial production.
- (iii)
- Total
cash costs per ounce of gold produced is not a recognized measure under IFRS and this data may not be comparable to data presented by other gold
producers. Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal
revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the condensed interim consolidated statements of income and
comprehensive income for by-product metal revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and other adjustments, and then dividing by the number of
ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold
26
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
produced
on a by-product basis except that no adjustment for by-product metal revenues is made. The calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a
reduction in production costs or smelting, refining and marketing charges associated with the production and sale of by-product metals. The Company believes that these generally accepted industry
measures provide a realistic indication of operating performance and provide useful comparison points between periods. Total cash costs per ounce of gold produced is intended to provide information
about the cash generating capabilities of the Company's mining operations. Management also uses these measures to monitor the performance of the Company's mining operations. As market prices for gold
are quoted on a per ounce basis, using the total cash costs per ounce of gold produced on a by-product basis measure allows management to assess a mine's cash generating capabilities at various gold
prices. Management is aware that these per ounce measures of performance can be affected by fluctuations in exchange rates and, in the case of total cash costs of gold produced on a by-product basis,
by-product metal prices. Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne (discussed below) as well as other data prepared in
accordance with IFRS. Management also performs sensitivity analyses in order to quantify the effects of fluctuating metal prices and exchange rates.
- (iv)
- Minesite
costs per tonne is not a recognized measure under IFRS and this data may not be comparable to data presented by other gold producers. This measure
is calculated by adjusting production costs as shown in the condensed interim consolidated statements of income and comprehensive income for unsold concentrate inventory production costs, and then
dividing by tonnes of ore milled. As the total cash costs per ounce of gold produced measure can be impacted by fluctuations in by-product metal prices and exchange rates, management believes that the
minesite costs per tonne measure provides additional information regarding the performance of mining operations, eliminating the impact of varying production levels. Management also uses this measure
to determine the economic viability of mining blocks. As each mining block is evaluated based on the net realizable value of each tonne mined, in order to be economically viable the estimated revenue
on a per tonne basis must be in excess of the minesite costs per tonne. Management is aware that this per tonne measure of performance can be impacted by fluctuations in processing levels and
compensates for this inherent limitation by using this measure in conjunction with production costs prepared in accordance with IFRS.
- (v)
- Under
the Company's revenue recognition policy, revenue is recognized on concentrates when legal title passes. As total cash costs per ounce of gold
produced are calculated on a production basis, an inventory adjustment is made to reflect the sales margin on the portion of concentrate production not yet recognized as revenue. Other adjustments
include the addition of smelting, refining and marketing charges to production costs.
- (vi)
- This
inventory and other adjustment reflects production costs associated with unsold concentrates.
All-in Sustaining Costs per Ounce of Gold Produced
All-in sustaining costs per ounce of gold produced is not a recognized measure under IFRS and this data may not be comparable to data
presented by other gold producers. The Company believes that this measure provides information about operating performance. However, this non-GAAP measure should be considered together with other data
prepared in accordance with IFRS as it is not necessarily indicative of operating costs or cash flow measures prepared in accordance with IFRS.
Based
on the recommendations of the World Gold Council made in 2013, the Company modified its calculation of all-in sustaining costs per ounce of gold produced beginning in 2014. All-in
sustaining costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal revenues).
All-in sustaining costs per ounce of gold produced on a by-product basis is calculated as the aggregate of total cash costs per ounce of gold produced on a by-product basis and sustaining capital
expenditures (including capitalized exploration),
general and administrative expenses (including stock options) and non-cash reclamation provision expense per ounce of gold produced. All-in sustaining costs per ounce of gold produced on a co-product
basis is calculated in the same manner as all-in sustaining costs per ounce of gold produced on a by-product basis except that no adjustment for by-product metal revenues is made to total cash costs
per ounce of gold produced. The calculation of all-in sustaining costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting, refining and
marketing charges associated with the production and sale of by-product metals.
Prior
to modifying its calculation of all-in sustaining costs per ounce of gold produced for 2014 based on the recommendations of the World Gold Council, the Company calculated all-in
sustaining costs per ounce of gold produced on a by-product basis as the aggregate of total cash costs per ounce of gold produced on a by-product
27
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
basis
and sustaining capital expenditures, general and administrative expenses (net of stock options) and exploration and corporate development expenses (excluding greenfield exploration) per
ounce of gold produced. All-in sustaining costs per ounce of gold produced on a co-product basis would have been calculated in the same manner as all-in sustaining costs per ounce of gold produced on
a by-product basis except that no adjustment for by-product metal revenues, net of smelting, refining and marketing charges would have been made to total cash costs per ounce of gold produced.
The
following table sets out a reconciliation of production costs to all-in sustaining costs per ounce of gold produced for the three and six months ended June 30, 2015 and the
three and six months ended June 30, 2014 on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal revenues).
28
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
Reconciliation of Production Costs to All-in Sustaining Costs per Ounce of Gold Produced
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(United States dollars per ounce of gold produced, except where noted)
|
|
Three Months Ended
June 30, 2015 |
|
Three Months Ended
June 30, 2014 |
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
Production costs per the condensed interim consolidated statements of income and comprehensive income (thousands of United States dollars)
|
|
$ |
263,612 |
|
$ |
229,383 |
|
$ |
510,892 |
|
$ |
447,449 |
|
|
|
|
|
|
|
|
|
|
|
Adjusted Gold production (ounces)(i) |
|
|
403,678 |
|
|
326,059 |
|
|
807,888 |
|
|
688,988 |
|
|
|
|
|
|
|
|
|
|
|
Production costs per ounce of adjusted gold production(i) |
|
$ |
653 |
|
$ |
704 |
|
$ |
632 |
|
$ |
649 |
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inventory and other adjustments(ii) |
|
|
13 |
|
|
26 |
|
|
26 |
|
|
27 |
|
|
|
|
|
|
|
|
|
|
|
Total cash costs per ounce of gold produced (co-product basis)(iii) |
|
$ |
666 |
|
$ |
730 |
|
$ |
658 |
|
$ |
676 |
|
By-product metal revenues |
|
|
(65 |
) |
|
(99 |
) |
|
(63 |
) |
|
(94 |
) |
|
|
|
|
|
|
|
|
|
|
Total cash costs per ounce of gold produced (by-product basis)(iii) |
|
$ |
601 |
|
$ |
631 |
|
$ |
595 |
|
$ |
582 |
|
|
|
|
|
|
|
|
|
|
|
Adjustments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Sustaining capital expenditures (including capitalized exploration) |
|
|
203 |
|
|
241 |
|
|
177 |
|
|
207 |
|
General and administrative expenses (including stock options) |
|
|
58 |
|
|
127 |
|
|
60 |
|
|
98 |
|
Non-cash reclamation provision and other |
|
|
2 |
|
|
4 |
|
|
3 |
|
|
3 |
|
|
|
|
|
|
|
|
|
|
|
All-in sustaining costs per ounce of gold produced (by-product basis) |
|
$ |
864 |
|
$ |
1,003 |
|
$ |
835 |
|
$ |
890 |
|
|
|
|
|
|
|
|
|
|
|
By-product metal revenues |
|
|
65 |
|
|
99 |
|
|
63 |
|
|
94 |
|
|
|
|
|
|
|
|
|
|
|
All-in sustaining costs per ounce of gold produced (co-product basis) |
|
$ |
929 |
|
$ |
1,102 |
|
$ |
898 |
|
$ |
984 |
|
|
|
|
|
|
|
|
|
|
|
Notes:
- (i)
- The
La India mine achieved commercial production on February 1, 2014. 3,492 ounces of payable gold production were excluded from the
calculation of total cash costs per ounce of gold produced in the six months ended June 30, 2014 as they were produced prior to the achievement of commercial production.
- (ii)
- Under
the Company's revenue recognition policy, revenue is recognized on concentrates when legal title and risk is transferred. As total cash costs per
ounce of gold produced are calculated on a production basis, this inventory adjustment reflects the sales margin on the portion of concentrate production not yet recognized as revenue. Other
adjustments include the addition of smelting, refining and marketing charges to production costs.
- (iii)
- Total
cash costs per ounce of gold produced is not a recognized measure under IFRS and this data may not be comparable to data presented by other gold
producers. Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal
revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the condensed interim consolidated statements of income and
comprehensive income for by-product metal revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and other adjustments, and then dividing by the number of
ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except
that no adjustment for by-product metal revenues is made. The calculation of total cash costs
29
AGNICO EAGLE MINES LIMITED
MANAGEMENT'S DISCUSSION AND ANALYSIS
(Prepared in accordance with International Financial Reporting Standards)
for the three and six months ended June 30, 2015
per
ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting, refining and marketing charges associated with the production and sale of by-product
metals. The Company believes that these generally accepted industry measures provide a realistic indication of operating performance and provide useful comparison points between periods. Total cash
costs per ounce of gold produced is intended to provide information about the cash generating capabilities of the Company's mining operations. Management also uses these measures to monitor the
performance of the Company's mining operations. As market prices for gold are quoted on a per ounce basis, using the total cash costs per ounce of gold produced on a by-product basis measure allows
management to assess a mine's cash generating capabilities at various gold prices. Management is aware that these per ounce measures of performance can be affected by fluctuations in exchange rates
and, in the case of total cash costs of gold produced on a by-product basis, by-product metal prices. Management compensates for these inherent limitations by using these measures in conjunction with
minesite costs per tonne as well as other data prepared in accordance with IFRS. Management also performs sensitivity analyses in order to quantify the effects of fluctuating metal prices and
exchange rates.
30
AGNICO EAGLE MINES LIMITED
SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS
(thousands of United States dollars, except where noted)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended
June 30, |
|
Six Months Ended
June 30, |
|
|
|
2015 |
|
2014 |
|
2015 |
|
2014 |
|
Operating margin(i) by mine: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Northern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
$ |
32,799 |
|
$ |
26,402 |
|
$ |
62,813 |
|
$ |
71,826 |
|
Lapa mine |
|
|
11,351 |
|
|
9,050 |
|
|
26,038 |
|
|
24,391 |
|
Goldex mine |
|
|
15,525 |
|
|
13,283 |
|
|
34,778 |
|
|
22,809 |
|
Meadowbank mine |
|
|
49,600 |
|
|
88,727 |
|
|
96,177 |
|
|
212,687 |
|
Canadian Malartic mine(ii) |
|
|
44,737 |
|
|
3,669 |
|
|
79,456 |
|
|
3,668 |
|
Kittila mine |
|
|
16,145 |
|
|
14,184 |
|
|
43,560 |
|
|
33,186 |
|
Southern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
44,538 |
|
|
33,417 |
|
|
79,190 |
|
|
72,482 |
|
Creston Mascota deposit at Pinos Altos |
|
|
12,968 |
|
|
7,428 |
|
|
21,377 |
|
|
15,143 |
|
La India mine(iii) |
|
|
18,834 |
|
|
12,978 |
|
|
39,424 |
|
|
26,647 |
|
|
|
|
|
|
|
|
|
|
|
Total operating margin(i) |
|
|
246,497 |
|
|
209,138 |
|
|
482,813 |
|
|
482,839 |
|
Amortization of property, plant and mine development |
|
|
157,615 |
|
|
93,656 |
|
|
293,512 |
|
|
177,137 |
|
Exploration, corporate and other |
|
|
67,973 |
|
|
81,665 |
|
|
111,679 |
|
|
125,167 |
|
|
|
|
|
|
|
|
|
|
|
Income before income and mining taxes |
|
|
20,909 |
|
|
33,817 |
|
|
77,622 |
|
|
180,535 |
|
Income and mining taxes expense |
|
|
10,826 |
|
|
11,659 |
|
|
38,796 |
|
|
61,232 |
|
|
|
|
|
|
|
|
|
|
|
Net income for the period |
|
$ |
10,083 |
|
$ |
22,158 |
|
$ |
38,826 |
|
$ |
119,303 |
|
|
|
|
|
|
|
|
|
|
|
Net income per share basic (US$) |
|
$ |
0.05 |
|
$ |
0.12 |
|
$ |
0.18 |
|
$ |
0.66 |
|
Net income per share diluted (US$) |
|
$ |
0.05 |
|
$ |
0.12 |
|
$ |
0.18 |
|
$ |
0.66 |
|
Cash flows: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cash provided by operating activities |
|
$ |
188,349 |
|
$ |
182,728 |
|
$ |
331,804 |
|
$ |
433,124 |
|
Cash used in investing activities |
|
$ |
(104,476 |
) |
$ |
(488,543 |
) |
$ |
(158,368 |
) |
$ |
(596,831 |
) |
Cash (used in) provided by financing activities |
|
$ |
(64,514 |
) |
$ |
381,951 |
|
$ |
(187,696 |
) |
$ |
283,864 |
|
Realized prices (US$): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Gold (per ounce) |
|
$ |
1,196 |
|
$ |
1,291 |
|
$ |
1,199 |
|
$ |
1,300 |
|
Silver (per ounce) |
|
$ |
16.41 |
|
$ |
19.45 |
|
$ |
16.68 |
|
$ |
20.06 |
|
Zinc (per tonne) |
|
$ |
2,231 |
|
$ |
2,142 |
|
$ |
2,130 |
|
$ |
2,096 |
|
Copper (per tonne) |
|
$ |
6,274 |
|
$ |
6,893 |
|
$ |
5,656 |
|
$ |
6,594 |
|
31
AGNICO EAGLE MINES LIMITED
SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS
(thousands of United States dollars, except where noted)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended
June 30, |
|
Six Months Ended
June 30, |
|
|
|
2015 |
|
2014 |
|
2015 |
|
2014 |
|
Payable production(iv): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Gold (ounces): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Northern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
|
64,007 |
|
|
48,494 |
|
|
122,900 |
|
|
107,846 |
|
Lapa mine |
|
|
19,450 |
|
|
18,821 |
|
|
45,370 |
|
|
42,230 |
|
Goldex mine |
|
|
26,462 |
|
|
23,929 |
|
|
55,712 |
|
|
43,359 |
|
Meadowbank mine |
|
|
91,276 |
|
|
118,161 |
|
|
179,799 |
|
|
274,605 |
|
Canadian Malartic mine(ii) |
|
|
68,441 |
|
|
11,878 |
|
|
136,334 |
|
|
11,878 |
|
Kittila mine |
|
|
41,986 |
|
|
31,830 |
|
|
86,640 |
|
|
70,382 |
|
Southern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
50,647 |
|
|
43,978 |
|
|
100,753 |
|
|
89,195 |
|
Creston Mascota deposit at Pinos Altos |
|
|
15,606 |
|
|
11,159 |
|
|
28,054 |
|
|
21,476 |
|
La India mine(iii) |
|
|
25,803 |
|
|
17,809 |
|
|
52,326 |
|
|
31,509 |
|
|
|
|
|
|
|
|
|
|
|
Total gold (ounces) |
|
|
403,678 |
|
|
326,059 |
|
|
807,888 |
|
|
692,480 |
|
|
|
|
|
|
|
|
|
|
|
Silver (thousands of ounces): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Northern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
|
201 |
|
|
345 |
|
|
398 |
|
|
694 |
|
Lapa mine |
|
|
1 |
|
|
|
|
|
1 |
|
|
|
|
Meadowbank mine |
|
|
57 |
|
|
25 |
|
|
153 |
|
|
51 |
|
Canadian Malartic mine(ii) |
|
|
69 |
|
|
10 |
|
|
141 |
|
|
10 |
|
Kittila mine |
|
|
2 |
|
|
1 |
|
|
5 |
|
|
3 |
|
Southern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
576 |
|
|
422 |
|
|
1,139 |
|
|
882 |
|
Creston Mascota deposit at Pinos Altos |
|
|
37 |
|
|
18 |
|
|
69 |
|
|
34 |
|
La India mine(iii) |
|
|
72 |
|
|
40 |
|
|
141 |
|
|
67 |
|
|
|
|
|
|
|
|
|
|
|
Total Silver (thousands of ounces) |
|
|
1,015 |
|
|
861 |
|
|
2,047 |
|
|
1,741 |
|
|
|
|
|
|
|
|
|
|
|
Zinc (tonnes) |
|
|
827 |
|
|
3,793 |
|
|
1,763 |
|
|
5,853 |
|
Copper (tonnes) |
|
|
1,133 |
|
|
1,058 |
|
|
2,300 |
|
|
2,612 |
|
32
AGNICO EAGLE MINES LIMITED
SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS
(thousands of United States dollars, except where noted)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended
June 30, |
|
Six Months Ended
June 30, |
|
|
|
2015 |
|
2014 |
|
2015 |
|
2014 |
|
Payable metal sold: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Gold (ounces): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Northern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
|
59,376 |
|
|
48,115 |
|
|
120,319 |
|
|
106,215 |
|
Lapa mine |
|
|
20,771 |
|
|
18,162 |
|
|
44,268 |
|
|
41,613 |
|
Goldex mine |
|
|
27,306 |
|
|
22,255 |
|
|
55,213 |
|
|
41,862 |
|
Meadowbank mine |
|
|
96,870 |
|
|
118,176 |
|
|
181,649 |
|
|
265,678 |
|
Canadian Malartic mine(ii)(v) |
|
|
67,522 |
|
|
16,377 |
|
|
126,783 |
|
|
16,377 |
|
Kittila mine |
|
|
39,385 |
|
|
31,519 |
|
|
88,366 |
|
|
68,948 |
|
Southern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
54,402 |
|
|
43,058 |
|
|
95,835 |
|
|
89,868 |
|
Creston Mascota deposit at Pinos Altos |
|
|
16,537 |
|
|
10,737 |
|
|
27,936 |
|
|
20,965 |
|
La India mine(iii) |
|
|
23,803 |
|
|
15,025 |
|
|
50,701 |
|
|
29,657 |
|
|
|
|
|
|
|
|
|
|
|
Total gold (ounces) |
|
|
405,972 |
|
|
323,424 |
|
|
791,070 |
|
|
681,183 |
|
|
|
|
|
|
|
|
|
|
|
Silver (thousands of ounces): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Northern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
|
225 |
|
|
322 |
|
|
429 |
|
|
662 |
|
Meadowbank mine |
|
|
59 |
|
|
24 |
|
|
157 |
|
|
52 |
|
Canadian Malartic mine(ii)(v) |
|
|
80 |
|
|
15 |
|
|
134 |
|
|
15 |
|
Kittila mine |
|
|
2 |
|
|
1 |
|
|
5 |
|
|
3 |
|
Southern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
616 |
|
|
430 |
|
|
1,062 |
|
|
937 |
|
Creston Mascota deposit at Pinos Altos |
|
|
48 |
|
|
18 |
|
|
68 |
|
|
32 |
|
La India mine(iii) |
|
|
76 |
|
|
34 |
|
|
139 |
|
|
60 |
|
|
|
|
|
|
|
|
|
|
|
Total Silver (thousands of ounces): |
|
|
1,106 |
|
|
844 |
|
|
1,994 |
|
|
1,761 |
|
|
|
|
|
|
|
|
|
|
|
Zinc (tonnes) |
|
|
733 |
|
|
2,458 |
|
|
1,997 |
|
|
4,131 |
|
Copper (tonnes) |
|
|
1,131 |
|
|
1,074 |
|
|
2,291 |
|
|
2,616 |
|
Total cash costs per ounce of gold produced Co-product basis (US$)(vi): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Northern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
$ |
811 |
|
$ |
1,185 |
|
$ |
850 |
|
$ |
1,050 |
|
Lapa mine |
|
|
679 |
|
|
832 |
|
|
616 |
|
|
738 |
|
Goldex mine |
|
|
633 |
|
|
671 |
|
|
585 |
|
|
712 |
|
Meadowbank mine |
|
|
699 |
|
|
567 |
|
|
686 |
|
|
493 |
|
Canadian Malartic mine(ii) |
|
|
626 |
|
|
641 |
|
|
638 |
|
|
641 |
|
Kittila mine |
|
|
777 |
|
|
863 |
|
|
728 |
|
|
826 |
|
Southern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
570 |
|
|
702 |
|
|
559 |
|
|
698 |
|
Creston Mascota deposit at Pinos Altos |
|
|
441 |
|
|
646 |
|
|
462 |
|
|
639 |
|
La India mine(iii) |
|
|
456 |
|
|
489 |
|
|
458 |
|
|
488 |
|
|
|
|
|
|
|
|
|
|
|
Weighted average total cash costs per ounce of gold produced |
|
$ |
666 |
|
$ |
730 |
|
$ |
658 |
|
$ |
676 |
|
|
|
|
|
|
|
|
|
|
|
33
AGNICO EAGLE MINES LIMITED
SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS
(thousands of United States dollars, except where noted)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended
June 30, |
|
Six Months Ended
June 30, |
|
|
|
2015 |
|
2014 |
|
2015 |
|
2014 |
|
Total cash costs per ounce of gold produced By-product basis (US$)(vi): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Northern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
$ |
613 |
|
$ |
732 |
|
$ |
656 |
|
$ |
645 |
|
Lapa mine |
|
|
678 |
|
|
832 |
|
|
615 |
|
|
738 |
|
Goldex mine |
|
|
633 |
|
|
670 |
|
|
585 |
|
|
711 |
|
Meadowbank mine |
|
|
688 |
|
|
563 |
|
|
672 |
|
|
489 |
|
Canadian Malartic mine(ii) |
|
|
609 |
|
|
613 |
|
|
621 |
|
|
613 |
|
Kittila mine |
|
|
776 |
|
|
862 |
|
|
727 |
|
|
825 |
|
Southern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
384 |
|
|
516 |
|
|
371 |
|
|
498 |
|
Creston Mascota deposit at Pinos Altos |
|
|
402 |
|
|
613 |
|
|
421 |
|
|
606 |
|
La India mine(iii) |
|
|
410 |
|
|
443 |
|
|
414 |
|
|
437 |
|
|
|
|
|
|
|
|
|
|
|
Weighted average total cash costs per ounce of gold produced |
|
$ |
601 |
|
$ |
631 |
|
$ |
595 |
|
$ |
582 |
|
|
|
|
|
|
|
|
|
|
|
Notes:
- (i)
- Operating
margin is calculated as revenues from mining operations less production costs.
- (ii)
- On
June 16, 2014, Agnico Eagle and Yamana jointly acquired 100.0% of Osisko by way of the Arrangement. As a result of the Arrangement, Agnico Eagle
and Yamana each indirectly own 50.0% of Osisko (now Canadian Malartic Corporation) and Canadian Malartic GP, which now holds the Canadian Malartic mine. The information set out in this
table reflects the Company's 50.0% interest in the Canadian Malartic mine since the date of acquisition.
- (iii)
- The
La India mine achieved commercial production on February 1, 2014.
- (iv)
- Payable
production (a non-GAAP non-financial performance measure) is the quantity of mineral produced during a period contained in products that are
or will be sold by the Company, whether such products are sold during the period or held as inventories at the end of the period.
- (v)
- The
Canadian Malartic mine's payable metal sold excludes the 5.0% net smelter royalty transferred to Osisko Gold Royalties Ltd., pursuant to the
Arrangement.
- (vi)
- Total
cash costs per ounce of gold produced is not a recognized measure under IFRS and this data may not be comparable to data presented by other gold
producers. Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal
revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the condensed interim consolidated statements of income and
comprehensive income for by-product metal revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and other adjustments, and then dividing by the number of
ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except
that no adjustment for by-product metal revenues is made. The calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or
smelting, refining and marketing charges associated with the production and sale of by-product metals. The Company believes that these generally accepted industry measures provide a realistic
indication of operating performance and provide useful comparison points between periods. Total cash costs per ounce of gold produced is intended to provide information about the cash generating
capabilities of the Company's mining operations. Management also uses these measures to monitor the performance of the Company's mining operations. As market prices for gold are quoted on a per ounce
basis, using the total cash costs per ounce of gold produced on a by-product basis measure allows management to assess a mine's cash generating capabilities at various gold prices. Management is aware
that these per ounce measures of performance can be affected by fluctuations in exchange rates and, in the case of total cash costs of gold produced on a by-product basis, by-product metal prices.
Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne as well as other data prepared in accordance with IFRS. Management also
performs sensitivity analyses in order to quantify the effects of fluctuating metal prices and exchange rates.
34
AGNICO EAGLE MINES LIMITED
SUMMARIZED QUARTERLY DATA
(thousands of United States dollars, except where noted)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended |
|
|
|
September 30,
2013 |
|
December 31,
2013 |
|
March 31,
2014 |
|
June 30,
2014 |
|
September 30,
2014 |
|
December 31,
2014 |
|
March 31,
2015 |
|
June 30,
2015 |
|
Operating margin(i): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues from mining operations |
|
$ |
444,320 |
|
$ |
437,240 |
|
$ |
491,767 |
|
$ |
438,521 |
|
$ |
463,388 |
|
$ |
503,090 |
|
$ |
483,596 |
|
$ |
510,109 |
|
Production costs |
|
|
222,774 |
|
|
230,495 |
|
|
218,066 |
|
|
229,383 |
|
|
269,793 |
|
|
287,317 |
|
|
247,280 |
|
|
263,612 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total operating margin(i) |
|
|
221,546 |
|
|
206,745 |
|
|
273,701 |
|
|
209,138 |
|
|
193,595 |
|
|
215,773 |
|
|
236,316 |
|
|
246,497 |
|
Operating margin(i) by mine:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Northern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
|
25,461 |
|
|
27,243 |
|
|
45,425 |
|
|
26,402 |
|
|
14,696 |
|
|
33,535 |
|
|
30,015 |
|
|
32,799 |
|
Lapa mine |
|
|
15,303 |
|
|
18,143 |
|
|
15,340 |
|
|
9,050 |
|
|
13,748 |
|
|
16,060 |
|
|
14,687 |
|
|
11,351 |
|
Goldex mine(ii) |
|
|
|
|
|
6,079 |
|
|
9,525 |
|
|
13,283 |
|
|
17,237 |
|
|
20,693 |
|
|
19,253 |
|
|
15,525 |
|
Meadowbank mine |
|
|
90,658 |
|
|
80,818 |
|
|
123,961 |
|
|
88,728 |
|
|
52,504 |
|
|
39,839 |
|
|
46,577 |
|
|
49,600 |
|
Canadian Malartic mine(iii) |
|
|
|
|
|
|
|
|
|
|
|
3,668 |
|
|
33,224 |
|
|
39,092 |
|
|
34,718 |
|
|
44,737 |
|
Kittila mine |
|
|
39,150 |
|
|
27,949 |
|
|
19,003 |
|
|
14,184 |
|
|
12,128 |
|
|
14,312 |
|
|
27,415 |
|
|
16,145 |
|
Southern Business |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
40,529 |
|
|
38,224 |
|
|
39,064 |
|
|
33,417 |
|
|
28,837 |
|
|
27,123 |
|
|
34,652 |
|
|
44,538 |
|
Creston Mascota deposit at Pinos Altos |
|
|
10,445 |
|
|
8,289 |
|
|
7,714 |
|
|
7,428 |
|
|
8,032 |
|
|
8,392 |
|
|
8,409 |
|
|
12,968 |
|
La India mine(iv) |
|
|
|
|
|
|
|
|
13,669 |
|
|
12,978 |
|
|
13,189 |
|
|
16,727 |
|
|
20,590 |
|
|
18,834 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total operating margin(i) |
|
|
221,546 |
|
|
206,745 |
|
|
273,701 |
|
|
209,138 |
|
|
193,595 |
|
|
215,773 |
|
|
236,316 |
|
|
246,497 |
|
Amortization of property, plant and mine development |
|
|
79,266 |
|
|
90,788 |
|
|
83,481 |
|
|
93,656 |
|
|
117,396 |
|
|
139,095 |
|
|
135,897 |
|
|
157,615 |
|
Impairment loss |
|
|
|
|
|
1,014,688 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Exploration, corporate and other |
|
|
53,725 |
|
|
61,644 |
|
|
43,502 |
|
|
81,665 |
|
|
69,884 |
|
|
74,390 |
|
|
43,706 |
|
|
67,973 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income (loss) before income and mining taxes |
|
|
88,555 |
|
|
(960,375 |
) |
|
146,718 |
|
|
33,817 |
|
|
6,315 |
|
|
2,288 |
|
|
56,713 |
|
|
20,909 |
|
Income and mining taxes expense (recovery) |
|
|
13,637 |
|
|
(180,103 |
) |
|
49,573 |
|
|
11,659 |
|
|
21,365 |
|
|
23,571 |
|
|
27,970 |
|
|
10,826 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income (loss) for the period |
|
$ |
74,918 |
|
$ |
(780,272 |
) |
$ |
97,145 |
|
$ |
22,158 |
|
$ |
(15,050 |
) |
$ |
(21,283 |
) |
$ |
28,743 |
|
$ |
10,083 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income (loss) per share basic (US$) |
|
$ |
0.43 |
|
$ |
(4.49 |
) |
$ |
0.56 |
|
$ |
0.12 |
|
$ |
(0.07 |
) |
$ |
(0.10 |
) |
$ |
0.13 |
|
$ |
0.05 |
|
Net income (loss) per share diluted (US$) |
|
$ |
0.43 |
|
$ |
(4.49 |
) |
$ |
0.56 |
|
$ |
0.12 |
|
$ |
(0.10 |
) |
$ |
(0.12 |
) |
$ |
0.13 |
|
$ |
0.05 |
|
Cash flows: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cash provided by operating activities |
|
$ |
88,365 |
|
$ |
140,789 |
|
$ |
250,396 |
|
$ |
182,728 |
|
$ |
71,244 |
|
$ |
163,956 |
|
$ |
143,455 |
|
$ |
188,349 |
|
Cash used in investing activities |
|
$ |
(153,012 |
) |
$ |
(143,928 |
) |
$ |
(108,288 |
) |
$ |
(488,543 |
) |
$ |
(131,662 |
) |
$ |
(123,126 |
) |
$ |
(53,892 |
) |
$ |
(104,476 |
) |
Cash provided by (used in) financing activities |
|
$ |
68,745 |
|
$ |
30,811 |
|
$ |
(98,087 |
) |
$ |
381,951 |
|
$ |
(35,943 |
) |
$ |
(18,685 |
) |
$ |
(123,182 |
) |
$ |
(64,514 |
) |
Notes:
- (i)
- Operating
margin is calculated as revenues from mining operations less production costs.
- (ii)
- The
Goldex mine's M and E Zones achieved commercial production on October 1, 2013.
- (iii)
- On
June 16, 2014, Agnico Eagle and Yamana jointly acquired 100.0% of Osisko by way of the Arrangement. As a result of the Arrangement, Agnico Eagle
and Yamana each indirectly own 50.0% of Osisko (now Canadian Malartic Corporation) and Canadian Malartic GP, which now holds the Canadian Malartic mine. The information set out in this
table reflects the Company's 50.0% interest in the Canadian Malartic mine since the date of acquisition.
- (iv)
- The
La India mine achieved commercial production on February 1, 2014.
35
AGNICO EAGLE MINES LIMITED
CONDENSED INTERIM CONSOLIDATED BALANCE SHEETS
(thousands of United States dollars, except share amounts)
(Unaudited)
|
|
|
|
|
|
|
|
|
|
As at
June 30,
2015 |
|
As at
December 31,
2014(i) |
|
ASSETS |
|
|
|
|
|
|
|
Current assets: |
|
|
|
|
|
|
|
Cash and cash equivalents |
|
$ |
158,331 |
|
$ |
177,537 |
|
Short-term investments |
|
|
5,669 |
|
|
4,621 |
|
Restricted cash |
|
|
19,939 |
|
|
33,122 |
|
Trade receivables (note 6) |
|
|
61,195 |
|
|
59,716 |
|
Inventories (note 7) |
|
|
439,875 |
|
|
446,660 |
|
Income taxes recoverable |
|
|
11,838 |
|
|
1,658 |
|
Available-for-sale securities (notes 6 and 8) |
|
|
46,029 |
|
|
56,468 |
|
Fair value of derivative financial instruments (notes 6 and 13) |
|
|
899 |
|
|
4,877 |
|
Other current assets |
|
|
146,529 |
|
|
123,401 |
|
|
|
|
|
|
|
Total current assets |
|
|
890,304 |
|
|
908,060 |
|
Non-current assets: |
|
|
|
|
|
|
|
Restricted cash |
|
|
19,436 |
|
|
20,899 |
|
Goodwill (note 5) |
|
|
696,809 |
|
|
696,809 |
|
Property, plant and mine development (note 9) |
|
|
5,120,069 |
|
|
5,155,865 |
|
Other assets |
|
|
23,197 |
|
|
27,622 |
|
|
|
|
|
|
|
Total assets |
|
$ |
6,749,815 |
|
$ |
6,809,255 |
|
|
|
|
|
|
|
LIABILITIES AND EQUITY |
|
|
|
|
|
|
|
Current liabilities: |
|
|
|
|
|
|
|
Accounts payable and accrued liabilities |
|
$ |
232,674 |
|
$ |
209,906 |
|
Reclamation provision |
|
|
7,666 |
|
|
6,769 |
|
Interest payable |
|
|
13,611 |
|
|
13,816 |
|
Income taxes payable |
|
|
18,488 |
|
|
19,328 |
|
Finance lease obligations |
|
|
15,218 |
|
|
22,142 |
|
Current portion of long-term debt (note 10) |
|
|
16,033 |
|
|
52,182 |
|
Fair value of derivative financial instruments (notes 6 and 13) |
|
|
12,796 |
|
|
8,249 |
|
|
|
|
|
|
|
Total current liabilities |
|
|
316,486 |
|
|
332,392 |
|
|
|
|
|
|
|
Non-current liabilities: |
|
|
|
|
|
|
|
Long-term debt (note 10) |
|
|
1,180,326 |
|
|
1,322,461 |
|
Reclamation provision |
|
|
246,572 |
|
|
249,917 |
|
Deferred income and mining tax liabilities |
|
|
802,261 |
|
|
797,192 |
|
Other liabilities |
|
|
44,401 |
|
|
38,803 |
|
|
|
|
|
|
|
Total liabilities |
|
|
2,590,046 |
|
|
2,740,765 |
|
|
|
|
|
|
|
EQUITY |
|
|
|
|
|
|
|
Common shares (note 11): |
|
|
|
|
|
|
|
Outstanding 217,377,496 common shares issued, less 344,510 shares held in trust |
|
|
4,685,089 |
|
|
4,599,788 |
|
Stock options (notes 11 and 12) |
|
|
209,529 |
|
|
200,830 |
|
Contributed surplus |
|
|
37,254 |
|
|
37,254 |
|
Deficit |
|
|
(775,073 |
) |
|
(779,382 |
) |
Accumulated other comprehensive income |
|
|
2,970 |
|
|
10,000 |
|
|
|
|
|
|
|
Total equity |
|
|
4,159,769 |
|
|
4,068,490 |
|
|
|
|
|
|
|
Total liabilities and equity |
|
$ |
6,749,815 |
|
$ |
6,809,255 |
|
|
|
|
|
|
|
Commitments and contingencies (note 15) |
|
|
|
|
|
|
|
Note:
- (i)
- As
set out in note 5, certain previously reported December 31, 2014 consolidated balance sheet line items have been updated to reflect
adjusted final estimates of fair value related to the June 16, 2014 joint acquisition of Osisko.
See accompanying notes
36
AGNICO EAGLE MINES LIMITED
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF INCOME AND
COMPREHENSIVE INCOME
(thousands of United States dollars, except per share amounts)
(Unaudited)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended
June 30, |
|
Six Months Ended
June 30, |
|
|
|
2015 |
|
2014 |
|
2015 |
|
2014 |
|
REVENUES |
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues from mining operations |
|
$ |
510,109 |
|
$ |
438,521 |
|
$ |
993,705 |
|
$ |
930,288 |
|
COSTS, EXPENSES AND OTHER INCOME |
|
|
|
|
|
|
|
|
|
|
|
|
|
Production(i) |
|
|
263,612 |
|
|
229,383 |
|
|
510,892 |
|
|
447,449 |
|
Exploration and corporate development |
|
|
30,616 |
|
|
11,627 |
|
|
47,267 |
|
|
21,045 |
|
Amortization of property, plant and mine development |
|
|
157,615 |
|
|
93,656 |
|
|
293,512 |
|
|
177,137 |
|
General and administrative |
|
|
23,572 |
|
|
41,515 |
|
|
48,793 |
|
|
67,785 |
|
Impairment loss on available-for-sale securities (note 8) |
|
|
345 |
|
|
2,419 |
|
|
1,030 |
|
|
2,419 |
|
Finance costs |
|
|
17,955 |
|
|
17,259 |
|
|
37,667 |
|
|
34,397 |
|
Gain on derivative financial instruments (note 13) |
|
|
(8,836 |
) |
|
(518 |
) |
|
(260 |
) |
|
(4,264 |
) |
Gain on sale of available-for-sale securities (note 8) |
|
|
(2,675 |
) |
|
(5,016 |
) |
|
(23,724 |
) |
|
(5,289 |
) |
Environmental remediation |
|
|
(141 |
) |
|
501 |
|
|
288 |
|
|
673 |
|
Foreign currency translation loss (gain) |
|
|
4,779 |
|
|
6,568 |
|
|
(6,911 |
) |
|
1,509 |
|
Other expenses |
|
|
2,358 |
|
|
7,310 |
|
|
7,529 |
|
|
6,892 |
|
|
|
|
|
|
|
|
|
|
|
Income before income and mining taxes |
|
|
20,909 |
|
|
33,817 |
|
|
77,622 |
|
|
180,535 |
|
Income and mining taxes expense |
|
|
10,826 |
|
|
11,659 |
|
|
38,796 |
|
|
61,232 |
|
|
|
|
|
|
|
|
|
|
|
Net income for the period |
|
$ |
10,083 |
|
$ |
22,158 |
|
$ |
38,826 |
|
$ |
119,303 |
|
|
|
|
|
|
|
|
|
|
|
Net income per share basic (note 11) |
|
$ |
0.05 |
|
$ |
0.12 |
|
$ |
0.18 |
|
$ |
0.66 |
|
|
|
|
|
|
|
|
|
|
|
Net income per share diluted (note 11) |
|
$ |
0.05 |
|
$ |
0.12 |
|
$ |
0.18 |
|
$ |
0.66 |
|
|
|
|
|
|
|
|
|
|
|
Cash dividends declared per common share |
|
$ |
0.08 |
|
$ |
0.08 |
|
$ |
0.16 |
|
$ |
0.16 |
|
|
|
|
|
|
|
|
|
|
|
COMPREHENSIVE INCOME |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income for the period |
|
$ |
10,083 |
|
$ |
22,158 |
|
$ |
38,826 |
|
$ |
119,303 |
|
|
|
|
|
|
|
|
|
|
|
Other comprehensive income (loss): |
|
|
|
|
|
|
|
|
|
|
|
|
|
Items that may be subsequently reclassified to net income: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Available-for-sale securities and other investments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Unrealized change in fair value of available-for-sale securities |
|
|
3,606 |
|
|
5,264 |
|
|
14,593 |
|
|
26,282 |
|
Reclassification to impairment loss on available-for-sale securities (note 8) |
|
|
345 |
|
|
2,419 |
|
|
1,030 |
|
|
2,419 |
|
Reclassification to gain on sale of available-for-sale securities (note 8) |
|
|
(2,675 |
) |
|
(5,016 |
) |
|
(23,724 |
) |
|
(5,289 |
) |
Income tax impact of reclassification items |
|
|
323 |
|
|
|
|
|
3,036 |
|
|
|
|
Income tax impact of other comprehensive loss items |
|
|
(502 |
) |
|
|
|
|
(1,965 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1,097 |
|
|
2,667 |
|
|
(7,030 |
) |
|
23,412 |
|
|
|
|
|
|
|
|
|
|
|
Items that will not be subsequently reclassified to net income: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pension benefit obligations: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Remeasurement losses of pension benefit obligations |
|
|
(209 |
) |
|
|
|
|
(415 |
) |
|
|
|
Income tax impact |
|
|
54 |
|
|
|
|
|
109 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(155 |
) |
|
|
|
|
(306 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Other comprehensive income (loss) for the period |
|
|
942 |
|
|
2,667 |
|
|
(7,336 |
) |
|
23,412 |
|
|
|
|
|
|
|
|
|
|
|
Comprehensive income for the period |
|
$ |
11,025 |
|
$ |
24,825 |
|
$ |
31,490 |
|
$ |
142,715 |
|
|
|
|
|
|
|
|
|
|
|
Note:
- (i)
- Exclusive
of amortization, which is shown separately.
See accompanying notes
37
AGNICO EAGLE MINES LIMITED
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF EQUITY
(thousands of United States dollars, except share and per share amounts)
(Unaudited)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Common Shares
Oustanding |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Accumulated
Other
Comprehensive
Income |
|
|
|
|
|
Stock
Options |
|
Contributed
Surplus |
|
|
|
Total
Equity |
|
|
|
Shares |
|
Amount |
|
Deficit |
|
Balance December 31, 2013 |
|
|
173,953,975 |
|
$ |
3,294,007 |
|
$ |
184,078 |
|
$ |
37,254 |
|
$ |
(800,074 |
) |
$ |
2,141 |
|
$ |
2,717,406 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
119,303 |
|
|
|
|
|
119,303 |
|
Other comprehensive income |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
23,412 |
|
|
23,412 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total comprehensive income |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
119,303 |
|
|
23,412 |
|
|
142,715 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Transactions with owners: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Shares issued under employee stock option plan (notes 11 and 12) |
|
|
377,425 |
|
|
12,976 |
|
|
(2,693 |
) |
|
|
|
|
|
|
|
|
|
|
10,283 |
|
Stock options (notes 11 and 12) |
|
|
|
|
|
|
|
|
13,308 |
|
|
|
|
|
|
|
|
|
|
|
13,308 |
|
Shares issued under incentive share purchase plan (note 12) |
|
|
238,042 |
|
|
8,088 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8,088 |
|
Shares issued under dividend reinvestment plan |
|
|
98,075 |
|
|
3,042 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3,042 |
|
Shares issued for joint acquisition of Osisko (note 5) |
|
|
34,794,892 |
|
|
1,164,237 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1,164,237 |
|
Common shares held by a depository relating to Convertible Debentures previously issued by Osisko (notes 5 and 10) |
|
|
(871,680 |
) |
|
(29,166 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
(29,166 |
) |
Dividends declared ($0.16 per share) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(27,908 |
) |
|
|
|
|
(27,908 |
) |
Restricted share unit plan (note 12) |
|
|
(66,363 |
) |
|
(1,274 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
(1,274 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Balance June 30, 2014 |
|
|
208,524,366 |
|
$ |
4,451,910 |
|
$ |
194,693 |
|
$ |
37,254 |
|
$ |
(708,679 |
) |
$ |
25,553 |
|
$ |
4,000,731 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Balance December 31, 2014 |
|
|
214,236,234 |
|
$ |
4,599,788 |
|
$ |
200,830 |
|
$ |
37,254 |
|
$ |
(779,382 |
) |
$ |
10,000 |
|
$ |
4,068,490 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
38,826 |
|
|
|
|
|
38,826 |
|
Other comprehensive loss |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(306 |
) |
|
(7,030 |
) |
|
(7,336 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total comprehensive income (loss) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
38,520 |
|
|
(7,030 |
) |
|
31,490 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Transactions with owners: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Shares issued under employee stock option plan (notes 11 and 12) |
|
|
529,733 |
|
|
16,464 |
|
|
(3,506 |
) |
|
|
|
|
|
|
|
|
|
|
12,958 |
|
Stock options (notes 11 and 12) |
|
|
|
|
|
|
|
|
12,205 |
|
|
|
|
|
|
|
|
|
|
|
12,205 |
|
Shares issued under incentive share purchase plan (note 12) |
|
|
254,743 |
|
|
7,402 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7,402 |
|
Shares issued under dividend reinvestment plan |
|
|
170,507 |
|
|
5,050 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5,050 |
|
Shares issued for joint acquisition of Malartic CHL property |
|
|
459,197 |
|
|
13,441 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13,441 |
|
Shares issued for acquisition of Soltoro Ltd. (note 5) |
|
|
770,429 |
|
|
24,351 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24,351 |
|
Shares issued to settle Convertible Debentures previously issued by Osisko (note 10) |
|
|
871,680 |
|
|
24,779 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24,779 |
|
Dividends declared ($0.16 per share) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(34,211 |
) |
|
|
|
|
(34,211 |
) |
Restricted share unit plan and Long Term Incentive Plan (note 12) |
|
|
(259,537 |
) |
|
(6,186 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
(6,186 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Balance June 30, 2015 |
|
|
217,032,986 |
|
$ |
4,685,089 |
|
$ |
209,529 |
|
$ |
37,254 |
|
$ |
(775,073 |
) |
$ |
2,970 |
|
$ |
4,159,769 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See accompanying notes
38
AGNICO EAGLE MINES LIMITED
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS
(thousands of United States dollars)
(Unaudited)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended
June 30, |
|
Six Months Ended
June 30, |
|
|
|
2015 |
|
2014 |
|
2015 |
|
2014 |
|
OPERATING ACTIVITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income for the period |
|
$ |
10,083 |
|
$ |
22,158 |
|
$ |
38,826 |
|
$ |
119,303 |
|
Add (deduct) items not affecting cash: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Amortization of property, plant and mine development |
|
|
157,615 |
|
|
93,656 |
|
|
293,512 |
|
|
177,137 |
|
Deferred income and mining taxes |
|
|
(13,680 |
) |
|
(757 |
) |
|
5,620 |
|
|
19,207 |
|
Gain on sale of available-for-sale securities (note 8) |
|
|
(2,675 |
) |
|
(5,016 |
) |
|
(23,724 |
) |
|
(5,289 |
) |
Stock-based compensation (note 12) |
|
|
8,131 |
|
|
9,872 |
|
|
19,849 |
|
|
22,480 |
|
Impairment loss on available-for-sale securities (note 8) |
|
|
345 |
|
|
2,419 |
|
|
1,030 |
|
|
2,419 |
|
Foreign currency translation loss (gain) |
|
|
4,779 |
|
|
6,568 |
|
|
(6,911 |
) |
|
1,509 |
|
Other |
|
|
(11,403 |
) |
|
7,681 |
|
|
2,133 |
|
|
7,906 |
|
Adjustment for settlement of reclamation provision |
|
|
(407 |
) |
|
(101 |
) |
|
(709 |
) |
|
(1,035 |
) |
Changes in non-cash working capital balances: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Trade receivables |
|
|
22 |
|
|
15,364 |
|
|
(1,462 |
) |
|
8,253 |
|
Income taxes |
|
|
13,043 |
|
|
(1,227 |
) |
|
(11,020 |
) |
|
20,520 |
|
Inventories |
|
|
11,623 |
|
|
6,432 |
|
|
22,035 |
|
|
29,903 |
|
Other current assets |
|
|
(18,186 |
) |
|
(20,325 |
) |
|
(23,023 |
) |
|
(4,805 |
) |
Accounts payable and accrued liabilities |
|
|
36,435 |
|
|
53,161 |
|
|
15,853 |
|
|
35,756 |
|
Interest payable |
|
|
(7,376 |
) |
|
(7,157 |
) |
|
(205 |
) |
|
(140 |
) |
|
|
|
|
|
|
|
|
|
|
Cash provided by operating activities |
|
|
188,349 |
|
|
182,728 |
|
|
331,804 |
|
|
433,124 |
|
|
|
|
|
|
|
|
|
|
|
INVESTING ACTIVITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
Additions to property, plant and mine development (note 9) |
|
|
(111,511 |
) |
|
(115,157 |
) |
|
(194,398 |
) |
|
(216,617 |
) |
Acquisitions, net of cash and cash equivalents acquired (note 5) |
|
|
(5,983 |
) |
|
(403,509 |
) |
|
(12,983 |
) |
|
(403,509 |
) |
Net purchases of short-term investments |
|
|
(947 |
) |
|
(2,004 |
) |
|
(1,048 |
) |
|
(2,004 |
) |
Net proceeds from sale of available-for-sale securities and warrants (note 8) |
|
|
18,643 |
|
|
39,529 |
|
|
56,311 |
|
|
40,142 |
|
Purchase of available-for-sale securities and warrants (note 8) |
|
|
(14,158 |
) |
|
|
|
|
(19,433 |
) |
|
(13,385 |
) |
Decrease (increase) in restricted cash |
|
|
9,480 |
|
|
(7,402 |
) |
|
13,183 |
|
|
(1,458 |
) |
|
|
|
|
|
|
|
|
|
|
Cash used in investing activities |
|
|
(104,476 |
) |
|
(488,543 |
) |
|
(158,368 |
) |
|
(596,831 |
) |
|
|
|
|
|
|
|
|
|
|
FINANCING ACTIVITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
Dividends paid |
|
|
(14,423 |
) |
|
(12,940 |
) |
|
(29,198 |
) |
|
(24,913 |
) |
Repayment of finance lease obligations |
|
|
(5,039 |
) |
|
(2,442 |
) |
|
(13,444 |
) |
|
(6,694 |
) |
Sale-leaseback financing |
|
|
|
|
|
|
|
|
|
|
|
1,027 |
|
Proceeds from long-term debt (note 10) |
|
|
75,000 |
|
|
730,000 |
|
|
75,000 |
|
|
730,000 |
|
Repayment of long-term debt (note 10) |
|
|
(126,086 |
) |
|
(343,933 |
) |
|
(226,086 |
) |
|
(423,933 |
) |
Repurchase of common shares for restricted share unit plan (note 12) |
|
|
(1,257 |
) |
|
|
|
|
(11,899 |
) |
|
(7,518 |
) |
Proceeds on exercise of stock options (note 12) |
|
|
4,735 |
|
|
8,471 |
|
|
12,958 |
|
|
10,456 |
|
Common shares issued |
|
|
2,556 |
|
|
2,795 |
|
|
4,973 |
|
|
5,439 |
|
|
|
|
|
|
|
|
|
|
|
Cash (used in) provided by financing activities |
|
|
(64,514 |
) |
|
381,951 |
|
|
(187,696 |
) |
|
283,864 |
|
|
|
|
|
|
|
|
|
|
|
Effect of exchange rate changes on cash and cash equivalents |
|
|
966 |
|
|
1,658 |
|
|
(4,946 |
) |
|
311 |
|
|
|
|
|
|
|
|
|
|
|
Net increase (decrease) in cash and cash equivalents during the period |
|
|
20,325 |
|
|
77,794 |
|
|
(19,206 |
) |
|
120,468 |
|
Cash and cash equivalents, beginning of period |
|
|
138,006 |
|
|
181,775 |
|
|
177,537 |
|
|
139,101 |
|
|
|
|
|
|
|
|
|
|
|
Cash and cash equivalents, end of period |
|
$ |
158,331 |
|
$ |
259,569 |
|
$ |
158,331 |
|
$ |
259,569 |
|
|
|
|
|
|
|
|
|
|
|
SUPPLEMENTAL CASH FLOW INFORMATION |
|
|
|
|
|
|
|
|
|
|
|
|
|
Interest paid |
|
$ |
24,817 |
|
$ |
22,305 |
|
$ |
35,898 |
|
$ |
30,456 |
|
|
|
|
|
|
|
|
|
|
|
Income and mining taxes paid |
|
$ |
151 |
|
$ |
13,172 |
|
$ |
38,098 |
|
$ |
21,321 |
|
|
|
|
|
|
|
|
|
|
|
See accompanying notes
39
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
(thousands of United States dollars, except share and per share amounts, unless otherwise
indicated)
(Unaudited)
June 30, 2015
1. CORPORATE INFORMATION
Agnico
Eagle Mines Limited ("Agnico Eagle" or the "Company") is principally engaged in the production and sale of gold, as well as related activities such as exploration and mine development. The
Company's mining operations are located in Canada, Mexico and Finland and it has exploration activities in Canada, Europe, Latin America and the United States. Agnico Eagle is a public company
incorporated and domiciled in Canada with its head and registered office located at 145 King Street East, Suite 400, Toronto, Ontario, M5C 2Y7. The Company is listed on the
Toronto Stock Exchange and the New York Stock Exchange. Agnico Eagle sells its gold production into the world market.
These
condensed interim consolidated financial statements were authorized for issuance by the Board of Directors on August 12, 2015.
2. BASIS OF PRESENTATION
- A)
- Statement of Compliance
The
accompanying condensed interim consolidated financial statements of Agnico Eagle have been prepared in accordance with International Accounting Standard 34 Interim
Financial Reporting ("IAS 34") as issued by the International Accounting Standards Board ("IASB") in United States ("US") dollars. These condensed interim
consolidated financial statements do not include all of the disclosures required by International Financial Reporting Standards ("IFRS") for annual audited consolidated financial statements.
These
condensed interim consolidated financial statements were prepared on a going concern basis under the historical cost method except for certain financial assets and liabilities which are measured
at fair value.
These
condensed interim consolidated financial statements should be read in conjunction with the Company's 2014 annual audited consolidated financial statements, including the accounting policies and
notes thereto, included in the Annual Report and Annual Information Form/Form 40-F for the year ended December 31, 2014, which were prepared in accordance with IFRS.
In
the opinion of management, these condensed interim consolidated financial statements reflect all adjustments, which consist of normal and recurring adjustments necessary to present fairly the
financial position as at June 30, 2015 and December 31, 2014 and the results of operations and cash flows for the three and six months ended June 30, 2015 and
June 30, 2014.
Operating
results for the three and six months ended June 30, 2015 are not necessarily indicative of the results that may be expected for the full year ending December 31, 2015.
- B)
- Basis of Presentation
Subsidiaries
These
condensed interim consolidated financial statements include the accounts of Agnico Eagle and its consolidated subsidiaries. All intercompany balances, transactions, income and expenses and gains
or losses have been eliminated on consolidation. Subsidiaries are consolidated where Agnico Eagle has the ability to exercise control. Control of an investee exists when Agnico Eagle is exposed to
variable returns from the Company's involvement with the investee and has the ability to affect those returns through its power over the investee. The Company reassesses whether or not it controls an
investee if facts and circumstances indicate that there are changes to one or more of the elements of control.
Joint Arrangements
A
joint arrangement is defined as an arrangement in which two or more parties have joint control. Joint control is the contractually agreed sharing of control over an arrangement between two or more
parties. This exists only when the decisions about the relevant activities that significantly affect the returns of the arrangement require the unanimous consent of the parties sharing control.
A
joint operation is a joint arrangement whereby the parties that have joint control of the arrangement and have rights to the assets and obligations for the liabilities relating to the arrangement.
These condensed interim consolidated financial statements include the Company's interest in the assets, liabilities, revenues and expenses of its joint operations, from the date that joint control
commenced. Agnico Eagle's interest in the Canadian Malartic Corporation, located in Quebec, has been accounted for as a joint operation.
3. ACCOUNTING POLICIES
These
condensed interim consolidated financial statements follow the same accounting policies and methods of their application as the December 31, 2014 annual audited consolidated financial
statements.
40
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
4. SIGNIFICANT JUDGMENTS, ESTIMATES AND ASSUMPTIONS
The
preparation of these condensed interim consolidated financial statements in conformity with IFRS requires management to make judgments, estimates and assumptions that affect the amounts reported
in the condensed interim consolidated financial statements and accompanying notes. Management believes that the estimates used in the preparation of the condensed interim consolidated financial
statements are reasonable; however, actual results may differ materially from these estimates. The areas involving significant judgments, estimates and assumptions have been detailed in note 4
to the Company's annual audited consolidated financial statements for the year ended December 31, 2014.
5. ACQUISITIONS
Soltoro Ltd.
On
June 9, 2015, the Company acquired all of the issued and outstanding common shares of Soltoro Ltd. ("Soltoro"), including common shares issuable on the exercise of Soltoro's
outstanding options and warrants, by way of a plan of arrangement under the Canada Business Corporations Act (the "Soltoro Arrangement"). Soltoro
is an exploration company focused on the discovery of precious metals in Mexico.
Each
outstanding share of Soltoro was exchanged under the Soltoro Arrangement for: (i) C$0.01 in cash; (ii) 0.00793 of an Agnico Eagle common share; and (iii) 1 common share of
Palamina Corp., a company that was newly formed in connection with the Soltoro Arrangement.
Pursuant
to the Soltoro Arrangement, Soltoro transferred all mining properties located outside of the state of Jalisco, Mexico to Palamina Corp., while Soltoro retained all mining properties located
within the state of Jalisco, Mexico. Agnico Eagle had no interest in Palamina Corp. upon the closing of the Soltoro Arrangement.
Agnico
Eagle's total purchase price of $26.7 million was comprised of $2.4 million in cash, including $1.6 million in cash contributed to Palamina Corp., and 770,429 Agnico
Eagle common shares issued from treasury. The Soltoro acquisition was accounted for as an asset acquisition and transaction costs associated with the acquisition totaling $1.4 million were
capitalized to the mining properties acquired separately from the purchase price allocation set out below.
The
following table sets out the allocation of the purchase price to assets acquired and liabilities assumed, based on management's estimates of fair value:
|
|
|
|
|
|
|
Total purchase price: |
|
|
|
|
|
Cash paid for acquisition |
|
$ |
2,366 |
|
|
Agnico Eagle common shares issued for acquisition |
|
|
24,351 |
|
|
|
|
|
|
|
Total purchase price to allocate |
|
$ |
26,717 |
|
|
|
|
|
|
|
Fair value of assets acquired and liabilities assumed: |
|
|
|
|
|
Mining properties |
|
$ |
27,053 |
|
|
Cash and cash equivalents |
|
|
2,375 |
|
|
Available-for-sale securities |
|
|
17 |
|
|
Other current assets |
|
|
130 |
|
|
Plant and equipment |
|
|
33 |
|
|
Accounts payable and accrued liabilities |
|
|
(1,134 |
) |
|
Other current liabilities |
|
|
(1,757 |
) |
|
|
|
|
|
|
Net assets acquired |
|
$ |
26,717 |
|
|
|
|
|
|
Gunnarn Mining AB
On
June 11, 2015, the Company acquired 55.0% of the issued and outstanding common shares of Gunnarn Mining AB ("Gunnarn") from Orex Minerals Inc. ("Orex"), by way of a share purchase
agreement and joint venture agreement (the "Gunnarn Agreements"). Gunnarn holds a 100.0% interest in the Barsele project located in northern Sweden.
Agnico
Eagle's total purchase price of $13.1 million was comprised of $6.0 million in cash and $7.1 million in accrued consideration. Pursuant to the Gunnarn Agreements, the
$7.1 million in accrued consideration includes two $2.0 million payments to be made by the Company to Orex in cash or Agnico Eagle common shares at Agnico Eagle's sole discretion on
June 11, 2016 and June 11, 2017,
41
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
5. ACQUISITIONS (Continued)
respectively.
Agnico Eagle has also committed to $7.0 million in exploration expenditures associated with the Barsele project by June 11, 2018 and may earn an additional 15.0% interest
in Gunnarn if the Company completes a pre-feasibility study related to the Barsele project. Orex was granted a 2.0% net smelter royalty on production from the Barsele project which may be repurchased
by Agnico Eagle at any time for $5.0 million.
Under
the Gunnarn Agreements, Agnico Eagle will hold a majority of the seats on the board of directors of Gunnarn and will be the sole operator of the Barsele project in exchange for customary
management fees.
The
Gunnarn acquisition was accounted for as an asset acquisition and transaction costs associated with the acquisition totaling $0.6 million were capitalized to the mining properties acquired
separately from the purchase allocation set out below.
The
following table sets out the allocation of the purchase price to assets acquired and liabilities assumed, based on management's estimates of fair value:
|
|
|
|
|
|
|
Total purchase price: |
|
|
|
|
|
Cash paid for acquisition |
|
$ |
5,994 |
|
|
Accrued consideration |
|
|
7,150 |
|
|
|
|
|
|
|
Total purchase price to allocate |
|
$ |
13,144 |
|
|
|
|
|
|
|
Fair value of assets acquired and liabilities assumed: |
|
|
|
|
|
Mining properties |
|
$ |
20,021 |
|
|
Cash and cash equivalents |
|
|
3 |
|
|
Other current assets |
|
|
35 |
|
|
Accounts payable and accrued liabilities |
|
|
(80 |
) |
|
Long-term debt |
|
|
(29 |
) |
|
Other liabilities |
|
|
(6,806 |
) |
|
|
|
|
|
|
Net assets acquired |
|
$ |
13,144 |
|
|
|
|
|
|
Osisko Mining Corporation
On
June 16, 2014, Agnico Eagle and Yamana jointly acquired 100.0% of the issued and outstanding shares of Osisko by way of the Arrangement. Under the Arrangement, Agnico Eagle and Yamana each
indirectly acquired 50.0% of Osisko's issued and outstanding shares. As part of the Arrangement, the Canadian Malartic mine in Quebec was transferred to the newly formed Canadian Malartic GP in
which each of Agnico Eagle and Yamana have an indirect 50.0% interest. Agnico Eagle and Yamana will also jointly explore the Kirkland Lake assets, the Hammond Reef project and the Pandora and
Wood-Pandora properties through their indirect joint ownership of Canadian Malartic Corporation (the successor to Osisko). Together, the acquired properties constitute the Canadian
Malartic joint operation segment (see note 14 to these condensed interim consolidated financial statements for details).
Each
outstanding share of Osisko was exchanged under the Arrangement for: (i) C$2.09 in cash (Agnico Eagle's 50.0% share was C$1.045); (ii) 0.07264 of an Agnico Eagle common share
(a value of C$2.64 based on the closing price of C$36.29 for Agnico Eagle common shares on the Toronto Stock Exchange as of June 16, 2014); (iii) 0.26471 of a Yamana common share;
and (iv) 0.1 of one common share of Osisko Gold Royalties Ltd., a company that was newly formed in connection with the Arrangement and is now traded on the Toronto Stock Exchange.
Pursuant
to the Arrangement, the following assets of Osisko were transferred to Osisko Gold Royalties Ltd.: (i) a 5.0% net smelter royalty on the Canadian Malartic mine;
(ii) C$157.0 million in cash; (iii) a 2.0% net smelter royalty on the Kirkland Lake assets, the Hammond Reef project, and certain other exploration properties retained by Canadian
Malartic Corporation; (iv) all assets and liabilities of Osisko in its Guerrero camp in Mexico; and (v) certain other investments and assets.
Agnico
Eagle has recognized its interest in the assets, liabilities, revenues and expenses of Osisko in accordance with the Company's rights and obligations prescribed by the Arrangement, as the joint
arrangement was determined to be a joint operation under IFRS.
Agnico
Eagle's transaction costs associated with the acquisition totaling $16.7 million were expensed through the general and administrative line item of the annual audited consolidated
statements of income (loss) and comprehensive income (loss) for the year ended December 31, 2014.
42
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
5. ACQUISITIONS (Continued)
Agnico
Eagle's share of the June 16, 2014 purchase price of Osisko was comprised of the following:
|
|
|
|
|
|
|
Cash paid for acquisition |
|
$ |
462,728 |
|
|
Agnico Eagle common shares issued for acquisition |
|
|
1,135,071 |
|
|
|
|
|
|
|
Total Agnico Eagle purchase price to allocate |
|
$ |
1,597,799 |
|
|
|
|
|
|
A
fair value approach was applied by management in developing estimates of the fair value of identifiable assets and liabilities contributed to the newly formed Osisko joint operation. These estimates
of fair value have now been finalized as all relevant information about facts and circumstances that existed at the acquisition date have been received.
Certain
previously reported Agnico Eagle consolidated balance sheet line items as at December 31, 2014 have been updated to reflect adjusted final estimates of the fair value of identifiable
assets acquired and liabilities assumed related to the June 16, 2014 joint acquisition of Osisko. As a result of new information obtained about the facts and circumstances that existed as of
the Osisko acquisition date, the following adjustments have been recorded to both the adjusted final purchase price allocation and the December 31, 2014 balance sheet as previously reported:
the property, plant and mine development line item has decreased by $145.6 million; the goodwill line item has increased by $114.3 million; the accounts payable and accrued liabilities
line item has increased by $3.7 million; and the deferred income and mining tax liabilities line item has decreased by $35.0 million.
The
following table sets out the allocation of Agnico Eagle's share of the purchase price to attributable assets acquired and liabilities assumed pursuant to the Arrangement, based on management's
previously reported preliminary estimates of fair value and adjusted final estimates of fair value:
Fair value of assets acquired and liabilities assumed:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Preliminary(i) |
|
Adjustments |
|
Adjusted Final |
|
|
Property, plant and mine development |
|
$ |
1,452,148 |
|
$ |
(145,631 |
) |
$ |
1,306,517 |
|
|
Goodwill(ii) |
|
|
543,444 |
|
|
114,348 |
|
|
657,792 |
|
|
Cash and cash equivalents |
|
|
59,219 |
|
|
|
|
|
59,219 |
|
|
Restricted cash |
|
|
35,528 |
|
|
|
|
|
35,528 |
|
|
Trade receivables(iii) |
|
|
9,653 |
|
|
|
|
|
9,653 |
|
|
Inventories |
|
|
51,477 |
|
|
|
|
|
51,477 |
|
|
Other current assets |
|
|
11,420 |
|
|
|
|
|
11,420 |
|
|
Accounts payable and accrued liabilities |
|
|
(49,391 |
) |
|
(3,726 |
) |
|
(53,117 |
) |
|
Reclamation provision |
|
|
(20,776 |
) |
|
|
|
|
(20,776 |
) |
|
Long-term debt |
|
|
(151,333 |
) |
|
|
|
|
(151,333 |
) |
|
Deferred income and mining tax liabilities |
|
|
(343,590 |
) |
|
35,009 |
|
|
(308,581 |
) |
|
|
|
|
|
|
|
|
|
|
Net assets acquired |
|
$ |
1,597,799 |
|
$ |
|
|
$ |
1,597,799 |
|
|
|
|
|
|
|
|
|
|
Notes:
- (i)
- Preliminary
estimates of the fair value of assets acquired and liabilities assumed are presented as reported in the Company's 2014 annual audited
consolidated financial statements.
- (ii)
- Goodwill
is not deductible for tax purposes and is allocated to the Canadian Malartic joint operation segment.
- (iii)
- The
fair value of trade receivables approximates the gross contractual amounts receivable.
The
joint acquisition of Osisko is a strategic fit with the Company's skill set and its other operating assets in the area. The Company believes that goodwill associated with the joint acquisition of
Osisko arose principally because of the following factors: (1) the value implicit in the Company's ability to sustain and/or grow its business by increasing proven and probable mineral reserves
and mineral resources through new discoveries; and (2) the requirement to record a deferred tax liability for the difference between the assigned values and the tax bases of assets acquired and
liabilities assumed in a business combination at amounts that do not reflect fair value. The amount of goodwill associated with the joint acquisition of Osisko that is expected to be deductible
for tax purposes is nil. Upon
43
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
5. ACQUISITIONS (Continued)
finalization
of management's estimates of the fair value of identifiable assets and liabilities, the Company conducted a retrospective goodwill impairment test as at December 31, 2014 based on
the adjusted final value of goodwill, with no impairment losses required.
The
Company's indirect 50.0% interest in Canadian Malartic GP resulted in revenues from mining operations of $189.9 million and a net loss of $15.8 million between the
June 16, 2014 completion of the Arrangement and December 31, 2014.
6. FAIR VALUE MEASUREMENT
Fair
value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. All assets and
liabilities for which fair value is measured or disclosed in the condensed interim consolidated financial statements are categorized within the fair value hierarchy, described, as follows, based on
the lowest-level input that is significant to the fair value measurement as a whole:
Level 1 Unadjusted
quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities;
Level 2 Quoted
prices in markets that are not active or inputs that are observable, either directly or indirectly, for substantially the full term of the
asset or liability; and
Level 3 Prices
or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by
little or no market activity).
The
fair value hierarchy gives the highest priority to Level 1 inputs and the lowest priority to Level 3 inputs.
For
items that are recognized at fair value on a recurring basis, the Company determines whether transfers have occurred between levels in the hierarchy by reassessing their classification at the end
of each reporting period.
During
the six months ended June 30, 2015, there were no transfers between Level 1 and Level 2 fair value measurements, and no transfers into or out of Level 3 fair value
measurements.
The
Company's financial assets and liabilities include cash and cash equivalents, short-term investments, restricted cash, trade receivables, available-for-sale securities, accounts payable and
accrued liabilities, long-term debt and derivative financial instruments.
The
fair values of cash and cash equivalents, short-term investments, restricted cash and accounts payable and accrued liabilities approximate their carrying values due to their short-term nature.
Long-term
debt is recorded on the condensed interim consolidated balance sheet at June 30, 2015 at amortized cost. The fair value of long-term debt is determined by applying a discount rate,
reflecting the credit spread based on the Company's credit rating, to future related cash flows. As at June 30, 2015, the Company's long-term debt had a fair value of $1,275.4 million
(December 31, 2014 $1,498.4 million).
The
following table sets out the Company's financial assets and liabilities measured at fair value on a recurring basis as at June 30, 2015 using the fair value hierarchy:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Level 1 |
|
Level 2 |
|
Level 3 |
|
Total |
|
|
Financial assets: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trade receivables |
|
$ |
|
|
$ |
61,195 |
|
$ |
|
|
$ |
61,195 |
|
|
Available-for-sale securities |
|
|
41,336 |
|
|
4,693 |
|
|
|
|
|
46,029 |
|
|
Fair value of derivative financial instruments |
|
|
|
|
|
899 |
|
|
|
|
|
899 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total financial assets |
|
$ |
41,336 |
|
$ |
66,787 |
|
$ |
|
|
$ |
108,123 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Financial liabilities: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fair value of derivative financial instruments |
|
$ |
|
|
$ |
12,796 |
|
$ |
|
|
$ |
12,796 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total financial liabilities |
|
$ |
|
|
$ |
12,796 |
|
$ |
|
|
$ |
12,796 |
|
|
|
|
|
|
|
|
|
|
|
|
44
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
6. FAIR VALUE MEASUREMENT (Continued)
The
following table sets out the Company's financial assets and liabilities measured at fair value on a recurring basis as at December 31, 2014 using the fair value hierarchy:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Level 1 |
|
Level 2 |
|
Level 3 |
|
Total |
|
|
Financial assets: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trade receivables |
|
$ |
|
|
$ |
59,716 |
|
$ |
|
|
$ |
59,716 |
|
|
Available-for-sale securities |
|
|
51,653 |
|
|
4,815 |
|
|
|
|
|
56,468 |
|
|
Fair value of derivative financial instruments |
|
|
|
|
|
4,877 |
|
|
|
|
|
4,877 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total financial assets |
|
$ |
51,653 |
|
$ |
69,408 |
|
$ |
|
|
$ |
121,061 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Financial liabilities: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Convertible Debentures |
|
$ |
|
|
$ |
|
|
$ |
34,678 |
|
$ |
34,678 |
|
|
Fair value of derivative financial instruments |
|
|
|
|
|
8,249 |
|
|
|
|
|
8,249 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total financial liabilities |
|
$ |
|
|
$ |
8,249 |
|
$ |
34,678 |
|
$ |
42,927 |
|
|
|
|
|
|
|
|
|
|
|
|
Valuation Techniques
Trade Receivables
Trade
receivables from provisional invoices for concentrate sales are valued using quoted forward rates derived from observable market data based on the month of expected settlement (classified within
Level 2 of the fair value hierarchy).
Available-for-sale Securities
Available-for-sale
securities representing shares of publicly traded entities are recorded at fair value using quoted market prices (classified within Level 1 of the fair value hierarchy).
Available-for-sale securities representing shares of non-publicly traded entities are recorded at fair value using external broker-dealer quotations (classified within Level 2 of the fair value
hierarchy).
Derivative Financial Instruments
Derivative
financial instruments classified within Level 2 of the fair value hierarchy are recorded at fair value using external broker-dealer quotations or option pricing models that utilize a
variety of inputs that are a combination of quoted prices and market-corroborated inputs. Derivative financial instruments are classified as at fair value through the consolidated statements
of income.
Convertible Debentures
On
June 30, 2015, the negotiated early settlement of all of the convertible debentures was completed. Convertible debentures issued by Osisko and subsequently an obligation of Canadian
Malartic GP were reported at fair value and classified within Level 3 of the fair value hierarchy and constituted contracts which resulted in the payment of cash and the issuance of
publicly-traded shares. Fair value was calculated with consideration given to the influence of a variety of inputs including quoted market prices and interest rates. Convertible debentures were
included in the current portion of long-term debt line item of the condensed interim consolidated balance sheets prior to settlement.
7. INVENTORIES
During
the three and six months ended June 30, 2015, a charge of $1.4 million (December 31, 2014 $4.6 million) was recorded within
the production costs line item of the condensed interim consolidated statements of income and comprehensive income to reduce the carrying value of inventories to their net realizable value.
8. AVAILABLE-FOR-SALE SECURITIES
During
the three months ended June 30, 2015, the Company purchased certain available-for-sale securities totaling $14.2 million (three months ended June 30,
2014 nil). During the six months ended June 30, 2015, the Company purchased certain available-for-sale securities totaling $19.4 million
(six months ended June 30, 2014 $10.6 million).
45
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
8. AVAILABLE-FOR-SALE SECURITIES (Continued)
During
the three months ended June 30, 2015, the Company received proceeds of $18.6 million (three months ended June 30,
2014 $39.5 million) and recognized a gain before income taxes of $2.7 million (three months ended June 30,
2014 $5.0 million) on the sale of certain available-for-sale securities. During the six months ended June 30, 2015, the Company received proceeds
of $49.7 million (six months ended June 30, 2014 $40.1 million) and recognized a gain before income taxes of $23.7 million
(six months ended June 30, 2014 $5.3 million) on the sale of certain available-for-sale securities.
During
the three months ended June 30, 2015, the Company recorded an impairment loss of $0.3 million (three months ended June 30,
2014 $2.4 million) on certain available-for-sale securities that were determined to have an impairment that was significant or prolonged. During the six
months ended June 30, 2015, the Company recorded an impairment loss of $1.0 million (six months ended June 30,
2014 $2.4 million) on certain available-for-sale securities that were determined to have an impairment that was significant or prolonged.
9. PROPERTY, PLANT AND MINE DEVELOPMENT
Acquisitions and disposals
During
the six months ended June 30, 2015, $227.4 million of additions (six months ended June 30, 2014 $206.5 million) were
capitalized to property, plant and mine development, excluding amounts capitalized related to acquisitions.
During
the six months ended June 30, 2015, the Company capitalized assets with a cost of $49.1 million (six months ended June 30,
2014 $1,306.5 million) related to acquisitions (see note 5 to these condensed interim consolidated financial statements for details).
Total
borrowing costs capitalized to property, plant and mine development during the six months ended June 30, 2015 were approximately $0.2 million (twelve months ended
December 31, 2014 $1.7 million) at a capitalization rate of 1.2% (twelve months ended December 31,
2014 1.3%).
Assets
with a net book value of $3.7 million were disposed of by the Company during the six months ended June 30, 2015 (twelve months ended December 31,
2014 $8.7 million), resulting in a net loss on disposal of $1.3 million (twelve months ended December 31,
2014 $6.5 million).
See
note 15 to these condensed interim consolidated financial statements for capital commitments.
10. LONG-TERM DEBT
Credit Facility and Loan Repayments
At
June 30, 2015, the Credit Facility was drawn down by $375.0 million (December 31, 2014 $500.0 million). Amounts drawn down,
together with outstanding letters of credit under the Credit Facility, resulted in Credit Facility availability of $824.0 million at June 30, 2015. During the six months ended
June 30, 2015, Credit Facility drawdowns totaled $75.0 million and repayments totaled $200.0 million.
In
connection with its joint acquisition of Osisko on June 16, 2014, Canadian Malartic GP was assigned and assumed certain outstanding debt obligations of Osisko relating to the Canadian
Malartic mine. Agnico Eagle's indirect attributable interest in such debt instruments included a secured loan facility. A scheduled repayment of C$20.0 million ($16.0 million) was made
on June 30, 2015, resulting in attributable outstanding principal of C$40.0 million ($32.1 million) as at June 30, 2015.
Convertible Debentures
In
connection with its joint acquisition of Osisko on June 16, 2014, Canadian Malartic GP was assigned and assumed certain outstanding debt obligations of Osisko relating to the Canadian
Malartic mine. Agnico Eagle's indirect attributable interest in such debt instruments included Convertible Debentures with principal outstanding of C$37.5 million ($34.6 million), a
November 2017 maturity date and a 6.875% interest rate.
On
June 30, 2015, the negotiated early settlement of all of the Convertible Debentures was completed. As a result of this settlement, 871,680 Agnico Eagle common shares with a fair value
of $24.8 million were released from a depositary to the holders of the Convertible Debentures along with a cash payment of $10.1 million to settle the Company's obligation. In the three
months ended June 30, 2015 a
$2.0 million mark-to-market gain was recorded in the other expenses line item of the condensed interim consolidated statements of income and comprehensive income related to the Convertible
Debentures, while a $2.4 million mark-to-market loss was recorded in the six months ended June 30, 2015. In the three and six months ended June 30, 2014, a $4.2 million
mark-to-market loss
46
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
10. LONG-TERM DEBT (Continued)
was
recorded related to the Convertible Debentures. Additional cash consideration of $3.2 million was paid to the holders of the Convertible Debentures upon settlement and was recorded in the
other expenses line item of the condensed interim consolidated statements of income and comprehensive income. As at June 30, 2015, the Convertible Debentures had principal outstanding
of nil.
11. EQUITY
Net Income Per Share
The
following table sets out the weighted average number of common shares used in the calculation of basic and diluted net income per share:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months
Ended June 30, |
|
Six Months
Ended June 30, |
|
|
|
|
2015 |
|
2014 |
|
2015 |
|
2014 |
|
|
Net income for the period |
|
$ |
10,083 |
|
$ |
22,158 |
|
$ |
38,826 |
|
$ |
119,303 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Weighted average number of common shares outstanding basic (in thousands) |
|
|
215,426 |
|
|
185,718 |
|
|
214,996 |
|
|
179,845 |
|
|
Add: Dilutive impact of common shares related to the RSU plan and LTIP |
|
|
366 |
|
|
345 |
|
|
302 |
|
|
328 |
|
|
Add: Dilutive impact of employee stock options |
|
|
930 |
|
|
219 |
|
|
888 |
|
|
180 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Weighted average number of common shares outstanding diluted (in thousands) |
|
|
216,722 |
|
|
186,282 |
|
|
216,186 |
|
|
180,353 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income per share basic |
|
$ |
0.05 |
|
$ |
0.12 |
|
$ |
0.18 |
|
$ |
0.66 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income per share diluted |
|
$ |
0.05 |
|
$ |
0.12 |
|
$ |
0.18 |
|
$ |
0.66 |
|
|
|
|
|
|
|
|
|
|
|
|
Diluted
net income per share has been calculated using the treasury stock method. In applying the treasury stock method, outstanding employee stock options with an exercise price greater than the
average quoted market price of the common shares for the period outstanding are not included in the calculation of diluted net income per share as the impact would be anti-dilutive.
For
the three months ended June 30, 2015, 4,884,005 (three months ended June 30, 2014 9,277,235) employee stock options were excluded from the
calculation of diluted net income per share as their impact would have been anti-dilutive. For the six months ended June 30, 2015, 4,864,005 (six months ended June 30,
2014 9,277,235) employee stock options were excluded from the calculation of diluted net income per share as their impact would have been anti-dilutive.
The
dilutive impact of the Convertible Debentures, including both their impact on diluted net income and the dilutive impact of related common shares held by a depositary in connection with any
conversion thereof, has been excluded from the calculation of diluted net income per share for the three and six months ended June 30, 2015 and the three and six months ended
June 30, 2014 as their impact would have been anti-dilutive. The Convertible Debentures were settled on June 30, 2015 (see note 10 to these condensed interim consolidated
financial statements for details).
47
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
12. STOCK-BASED COMPENSATION
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Six Months Ended
June 30, 2015 |
|
Six Months Ended
June 30, 2014 |
|
|
|
|
Number of
Stock
Options |
|
Weighted
Average
Exercise
Price |
|
Number of
Stock
Options |
|
Weighted
Average
Exercise
Price |
|
|
Outstanding, beginning of period |
|
|
11,913,210 |
|
C$ |
48.84 |
|
|
11,283,535 |
|
C$ |
56.02 |
|
|
Granted |
|
|
3,068,080 |
|
|
29.09 |
|
|
3,180,000 |
|
|
28.04 |
|
|
Exercised |
|
|
(529,733 |
) |
|
29.88 |
|
|
(377,425 |
) |
|
29.90 |
|
|
Forfeited |
|
|
(53,764 |
) |
|
45.34 |
|
|
(211,250 |
) |
|
52.24 |
|
|
Expired |
|
|
(2,032,331 |
) |
|
57.01 |
|
|
(1,724,150 |
) |
|
62.64 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Outstanding, end of period |
|
|
12,365,462 |
|
C$ |
43.43 |
|
|
12,150,710 |
|
C$ |
48.63 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Options exercisable, end of period |
|
|
7,762,445 |
|
C$ |
50.19 |
|
|
7,739,210 |
|
C$ |
55.42 |
|
|
|
|
|
|
|
|
|
|
|
|
The
average share price of Agnico Eagle's common shares during the six months ended June 30, 2015 was C$38.16 (six months ended June 30,
2014 C$34.67).
Agnico
Eagle estimated the fair value of stock options under the Black-Scholes option pricing model using the following weighted average assumptions:
|
|
|
|
|
|
|
|
|
|
|
|
Six Months Ended
June 30, |
|
|
|
|
2015 |
|
2014 |
|
|
Risk-free interest rate |
|
|
1.50% |
|
|
1.52% |
|
|
Expected life of stock options (in years) |
|
|
2.7 |
|
|
2.6 |
|
|
Expected volatility of Agnico Eagle's share price |
|
|
45.0% |
|
|
42.5% |
|
|
Expected dividend yield |
|
|
1.69% |
|
|
3.83% |
|
The
total compensation expense for the ESOP recorded in the general and administrative line item of the condensed interim consolidated statements of income and comprehensive income during the three
months ended June 30, 2015 was $4.2 million (three months ended June 30, 2014 $4.6 million) and $12.2 million for the six
months ended June 30, 2015 (six months ended June 30, 2014 $13.1 million). Of the total compensation cost for the ESOP,
$0.1 million was capitalized as part of the property, plant and mine development line item of the condensed interim consolidated balance sheets for the three months ended June 30, 2015
(three months ended June 30, 2014 $0.2 million) and $0.4 million for the six months ended June 30, 2015 (six months ended
June 30, 2014 $0.5 million).
- (b)
- Restricted Share Unit Plan
During
the six months ended June 30, 2015, 423,822 (six months ended June 30, 2014 294,080) RSUs were granted with a grant date fair value
of $11.9 million (six months ended June 30, 2014 $8.4 million). In the first six months of 2015, the Company funded the RSU plan by
transferring $11.5 million (first six months of 2014 $7.5 million) to an employee benefit trust that then purchased common shares of the Company
in the open market.
Compensation
expense related to the RSU plan was $2.9 million for the three months ended June 30, 2015 (three months ended June 30,
2014 $3.9 million) and $5.7 million for the six months ended June 30, 2015 (six months ended June 30,
2014 $6.6 million). Compensation expense related to the RSU plan is included as part of the general and administrative line item of the condensed interim
consolidated statements of income and comprehensive income.
48
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
12. STOCK-BASED COMPENSATION (Continued)
- (c)
- Incentive Share Purchase Plan
During
the six months ended June 30, 2015, 254,743 common shares were subscribed for under the incentive share purchase plan (the "Purchase Plan") (six months ended
June 30, 2014 238,042) for a value of $7.4 million (six months ended June 30,
2014 $8.1 million). The total compensation cost recognized in the six months ended June 30, 2015 related to the Purchase Plan was
$2.5 million (six months ended June 30, 2014 $2.7 million).
13. DERIVATIVE FINANCIAL INSTRUMENTS
Currency Risk Management
The
Company utilizes foreign exchange economic hedges to reduce the variability in expected future cash flows arising from changes in foreign currency exchange rates. The Company is primarily exposed
to currency fluctuations relative to the US dollar as a portion of the Company's operating costs and capital expenditures are denominated in foreign currencies; primarily the Canadian dollar, the Euro
and the Mexican peso. These potential currency fluctuations increase the volatility of, and could have a significant impact on, the Company's production costs. The economic hedges relate to a portion
of the foreign currency denominated cash outflows arising from foreign currency denominated expenditures. The Company does not apply hedge accounting to these arrangements.
As
at June 30, 2015, the Company had outstanding foreign exchange zero cost collars. The purchase of US dollar put options was financed through selling US dollar call options at a higher level
such that the net premium payable to the different counterparties by the Company was nil. At June 30, 2015, the zero cost collars related to $343.0 million of 2015 expenditures and the
Company recognized mark-to-market adjustments in the gain on derivative financial instruments line item of the condensed interim consolidated statements of income and comprehensive income.
Mark-to-market gains (losses) related to foreign exchange derivative financial instruments are recorded at fair value based on broker-dealer quotations that utilize period end forward pricing of the
applicable foreign currency to calculate fair value.
The
Company's other foreign currency derivative strategies in 2015 and 2014 consisted mainly of writing US dollar call options with short maturities to generate premiums that would, in essence,
enhance the spot transaction rate received when exchanging US dollars for Canadian dollars. All of these derivative transactions expired prior to period end such that no derivatives were outstanding
as at June 30, 2015 or December 31, 2014. The call option premiums were recognized in the gain on derivative financial instruments line item of the condensed interim consolidated
statements of income and comprehensive income.
Commodity Price Risk Management
To
mitigate the risks associated with fluctuating diesel fuel prices, the Company uses derivative financial instruments as economic hedges of the price risk on a portion of diesel fuel costs
associated with the Meadowbank mine's diesel fuel exposure as it relates to operating costs. There were derivative financial instruments outstanding at June 30, 2015 relating to
14.0 million gallons of heating oil. The related mark-to-market adjustments prior to settlement were recognized in the gain on derivative financial instruments line item of the condensed
interim consolidated statements of income and comprehensive income. The Company does not apply hedge accounting to these arrangements.
Mark-to-market
gains (losses) related to heating oil derivative financial instruments are based on broker-dealer quotations that utilize period end forward pricing to calculate fair value.
As
at June 30, 2015 and December 31, 2014, there were no metal derivative positions. The Company may from time to time utilize short-term financial instruments as part of its strategy to
minimize risks and optimize returns on its by-product metal sales.
49
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
13. DERIVATIVE FINANCIAL INSTRUMENTS (Continued)
The
following table sets out a summary of the amounts recognized in the gain on derivative financial instruments line item of the condensed interim consolidated statements of income and comprehensive
income:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended
June 30, |
|
Six Months Ended
June 30, |
|
|
|
|
2015 |
|
2014 |
|
2015 |
|
2014 |
|
|
Premiums realized on written foreign exchange call options |
|
$ |
697 |
|
$ |
403 |
|
$ |
1,362 |
|
$ |
1,235 |
|
|
Realized (loss) gain on warrants |
|
|
(593 |
) |
|
|
|
|
9,071 |
|
|
(185 |
) |
|
Unrealized gain (loss) on warrants(i) |
|
|
789 |
|
|
2,198 |
|
|
(1,770 |
) |
|
5,327 |
|
|
Realized (loss) gain on currency and commodity derivatives |
|
|
(1,489 |
) |
|
784 |
|
|
(4,225 |
) |
|
784 |
|
|
Unrealized gain (loss) on currency and commodity derivatives(i) |
|
|
9,432 |
|
|
(2,867 |
) |
|
(4,178 |
) |
|
(2,897 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
Gain on derivative financial instruments |
|
$ |
8,836 |
|
$ |
518 |
|
$ |
260 |
|
$ |
4,264 |
|
|
|
|
|
|
|
|
|
|
|
|
Note:
- (i)
- Unrealized
gains and losses on financial instruments that did not qualify for hedge accounting are recognized through the gain on derivative
financial instruments line item of the condensed interim consolidated statements of income and comprehensive income and through the other line item of the condensed interim consolidated statements of
cash flows.
14. SEGMENTED INFORMATION
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Six Months Ended June 30, 2015:
|
|
Revenues from
Mining
Operations |
|
Production
Costs |
|
Exploration and
Corporate
Development |
|
Segment
Income
(Loss) |
|
|
Northern Business: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
$ |
153,812 |
|
$ |
(90,999 |
) |
$ |
|
|
$ |
62,813 |
|
|
Lapa mine |
|
|
53,679 |
|
|
(27,641 |
) |
|
|
|
|
26,038 |
|
|
Goldex mine |
|
|
66,558 |
|
|
(31,780 |
) |
|
|
|
|
34,778 |
|
|
Meadowbank mine |
|
|
220,160 |
|
|
(123,983 |
) |
|
|
|
|
96,177 |
|
|
Canadian Malartic joint operation (note 5) |
|
|
162,827 |
|
|
(83,371 |
) |
|
(2,628 |
) |
|
76,828 |
|
|
Kittila mine |
|
|
106,336 |
|
|
(62,776 |
) |
|
|
|
|
43,560 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Northern Business |
|
|
763,372 |
|
|
(420,550 |
) |
|
(2,628 |
) |
|
340,194 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Southern Business: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
133,169 |
|
|
(53,979 |
) |
|
|
|
|
79,190 |
|
|
Creston Mascota deposit at Pinos Altos |
|
|
34,484 |
|
|
(13,107 |
) |
|
|
|
|
21,377 |
|
|
La India mine |
|
|
62,680 |
|
|
(23,256 |
) |
|
|
|
|
39,424 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Southern Business |
|
|
230,333 |
|
|
(90,342 |
) |
|
|
|
|
139,991 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Exploration |
|
|
|
|
|
|
|
|
(44,639 |
) |
|
(44,639 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
Segments totals |
|
$ |
993,705 |
|
$ |
(510,892 |
) |
$ |
(47,267 |
) |
$ |
435,546 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total segments income |
|
$ |
435,546 |
|
|
Corporate and other: |
|
|
|
|
|
Amortization of property, plant and mine development |
|
|
(293,512 |
) |
|
General and administrative |
|
|
(48,793 |
) |
|
Impairment loss on available-for-sale securities |
|
|
(1,030 |
) |
|
Finance costs |
|
|
(37,667 |
) |
|
Gain on derivative financial instruments |
|
|
260 |
|
|
Gain on sale of available-for-sale securities |
|
|
23,724 |
|
|
Environmental remediation |
|
|
(288 |
) |
|
Foreign currency translation gain |
|
|
6,911 |
|
|
Other expenses |
|
|
(7,529 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income before income and mining taxes |
|
$ |
77,622 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
14. SEGMENTED INFORMATION (Continued)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Six Months Ended June 30, 2014:
|
|
Revenues from
Mining
Operations |
|
Production
Costs |
|
Exploration and
Corporate
Development |
|
Segment
Income
(Loss) |
|
|
Northern Business: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LaRonde mine |
|
$ |
165,863 |
|
$ |
(94,037 |
) |
$ |
|
|
$ |
71,826 |
|
|
Lapa mine |
|
|
54,097 |
|
|
(29,706 |
) |
|
|
|
|
24,391 |
|
|
Goldex mine |
|
|
54,073 |
|
|
(31,264 |
) |
|
|
|
|
22,809 |
|
|
Meadowbank mine |
|
|
343,575 |
|
|
(130,888 |
) |
|
|
|
|
212,687 |
|
|
Canadian Malartic joint operation (note 5) |
|
|
22,001 |
|
|
(18,333 |
) |
|
|
|
|
3,668 |
|
|
Kittila mine |
|
|
89,570 |
|
|
(56,384 |
) |
|
|
|
|
33,186 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Northern Business |
|
|
729,179 |
|
|
(360,612 |
) |
|
|
|
|
368,567 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Southern Business: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
133,841 |
|
|
(61,359 |
) |
|
|
|
|
72,482 |
|
|
Creston Mascota deposit at Pinos Altos |
|
|
27,776 |
|
|
(12,633 |
) |
|
|
|
|
15,143 |
|
|
La India mine |
|
|
39,492 |
|
|
(12,845 |
) |
|
|
|
|
26,647 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Southern Business |
|
|
201,109 |
|
|
(86,837 |
) |
|
|
|
|
114,272 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Exploration |
|
|
|
|
|
|
|
|
(21,045 |
) |
|
(21,045 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
Segments totals |
|
$ |
930,288 |
|
$ |
(447,449 |
) |
$ |
(21,045 |
) |
$ |
461,794 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total segments income |
|
$ |
461,794 |
|
|
Corporate and other: |
|
|
|
|
|
Amortization of property, plant and mine development |
|
|
(177,137 |
) |
|
General and administrative |
|
|
(67,785 |
) |
|
Impairment loss on available-for-sale securities |
|
|
(2,419 |
) |
|
Finance costs |
|
|
(34,397 |
) |
|
Gain on derivative financial instruments |
|
|
4,264 |
|
|
Gain on sale of available-for-sale securities |
|
|
5,289 |
|
|
Environmental remediation |
|
|
(673 |
) |
|
Foreign currency translation loss |
|
|
(1,509 |
) |
|
Other expenses |
|
|
(6,892 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income before income and mining taxes |
|
$ |
180,535 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
51
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
14. SEGMENTED INFORMATION (Continued)
|
|
|
|
|
|
|
|
|
|
|
|
Total Assets as at |
|
|
|
|
June 30,
2015 |
|
December 31,
2014 |
|
|
Northern Business: |
|
|
|
|
|
|
|
|
LaRonde mine |
|
$ |
853,250 |
|
$ |
856,489 |
|
|
Lapa mine |
|
|
65,353 |
|
|
74,131 |
|
|
Goldex mine |
|
|
202,584 |
|
|
205,101 |
|
|
Meadowbank mine |
|
|
586,427 |
|
|
660,278 |
|
|
Canadian Malartic joint operation (note 5) |
|
|
2,056,992 |
|
|
2,068,532 |
|
|
Meliadine project |
|
|
510,346 |
|
|
487,901 |
|
|
Kittila mine |
|
|
922,206 |
|
|
931,335 |
|
|
|
|
|
|
|
|
|
Total Northern Business |
|
|
5,197,158 |
|
|
5,283,767 |
|
|
|
|
|
|
|
|
|
Southern Business: |
|
|
|
|
|
|
|
|
Pinos Altos mine |
|
|
588,455 |
|
|
573,786 |
|
|
Creston Mascota deposit at Pinos Altos |
|
|
76,656 |
|
|
84,176 |
|
|
La India mine |
|
|
543,991 |
|
|
543,297 |
|
|
|
|
|
|
|
|
|
Total Southern Business |
|
|
1,209,102 |
|
|
1,201,259 |
|
|
|
|
|
|
|
|
|
Exploration |
|
|
206,572 |
|
|
144,580 |
|
|
|
|
|
|
|
|
|
Corporate and other |
|
|
136,983 |
|
|
179,649 |
|
|
|
|
|
|
|
|
|
Total assets |
|
$ |
6,749,815 |
|
$ |
6,809,255 |
|
|
|
|
|
|
|
|
15. COMMITMENTS AND CONTINGENCIES
As
part of its ongoing business and operations, the Company has been required to provide assurance in the form of letters of credit for environmental and site restoration costs, custom credits,
government grants and other general corporate purposes. As at June 30, 2015, the total amount of these guarantees was $164.7 million.
As
at June 30, 2015, the Company had $39.2 million of commitments related to the purchase of property, plant and mine development.
16. SUBSEQUENT EVENTS
Dividends Declared
On
July 29, 2015, Agnico Eagle announced that the Board approved the payment of a quarterly cash dividend of $0.08 per common share (a total value of approximately $17.4 million),
paid on September 15, 2015 to holders of record of the common shares of the Company on September 1, 2015.
17. ONGOING LITIGATION
Securities Class Action Lawsuits
On
March 8, 2012 and April 10, 2012, a Notice of Action and Statement of Claim (collectively, the "Ontario Claim") were issued by William Leslie, AFA Livforsakringsaktiebolag and certain
other entities against the Company and certain of its current and former officers, some of whom who also are or were directors of the Company. On September 27, 2012, the plaintiffs issued a
Fresh as Amended Statement of Claim. The Fresh as Amended Statement of Claim alleges that the Company's public disclosure concerning water flow issues at its Goldex mine was misleading. The Ontario
Claim was issued by the plaintiffs on behalf of all persons and entities who acquired securities of the Company during the period March 26, 2010 to October 19, 2011, excluding persons
resident or domiciled in the Province of Quebec at the time they purchased or acquired such securities. The plaintiffs seek, among other things, damages of C$250.0 million. Following
negotiations with the plaintiffs, on April 17, 2013 an Order was granted on consent of the plaintiffs and defendants certifying a class action proceeding and granting leave for the claims under
Section 138 of the Securities Act (Ontario) to proceed. The consent Order significantly narrows the class of claimants initially proposed by the
plaintiffs and eliminates many of the claims initially made in the action. The Company has agreed to participate in a mediation with the plaintiffs in respect of both the
52
AGNICO EAGLE MINES LIMITED
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2015
17. ONGOING LITIGATION (Continued)
Ontario
and Quebec actions which will occur in early September 2015. If the mediation is not successful, it is expected that oral discoveries will take place in early 2016, and the Company
intends to vigorously defend the action on the merits. No amounts have been recorded for any potential liability arising from this matter.
On
March 28, 2012, the Company and certain of its current and former officers, some of whom also are or were directors of the Company, were named as respondents in a Motion for Leave to
Institute a Class Action and for the Appointment of a Representative Plaintiff (the "Quebec Motion"). The action is on behalf of all persons and entities with fewer than 50 employees
resident in Quebec who acquired securities of the Company between March 26, 2010 and October 19, 2011. The proposed class action is for damages of C$100.0 million arising as a
result of allegedly misleading disclosure by the Company concerning its operations at the Goldex mine. On October 15, 2012, the plaintiffs served an amended Quebec Motion seeking leave to
commence an action under the Securities Act (Quebec) in addition to seeking authorization to institute a class action. On October 1, 2013, the
Quebec court certified the class action on terms identical to those set out in the consent Order granted in Ontario on April 17, 2013. As noted in respect of the Ontario Claim, the Company has
agreed to participate in a mediation with the plaintiffs in respect of both the Ontario and Quebec actions, which will occur in early September 2015. If the mediation is not successful, it is
expected that oral discoveries will take place in early 2016, and Company intends to vigorously defend the action on the merits. No amounts have been recorded for any potential liability arising from
this matter.
53
QuickLinks
Second Quarter Report 2015
AGNICO EAGLE MINES LIMITED MANAGEMENT'S DISCUSSION AND ANALYSIS (Prepared in accordance with International Financial Reporting Standards) for the three and six months ended June 30, 2015
AGNICO EAGLE MINES LIMITED MANAGEMENT'S DISCUSSION AND ANALYSIS (Prepared in accordance with International Financial Reporting Standards) for the three and six months ended June 30, 2015
AGNICO EAGLE MINES LIMITED SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS (thousands of United States dollars, except where noted)
AGNICO EAGLE MINES LIMITED SUMMARIZED QUARTERLY DATA (thousands of United States dollars, except where noted)
AGNICO EAGLE MINES LIMITED CONDENSED INTERIM CONSOLIDATED BALANCE SHEETS (thousands of United States dollars, except share amounts) (Unaudited)
AGNICO EAGLE MINES LIMITED CONDENSED INTERIM CONSOLIDATED STATEMENTS OF INCOME AND COMPREHENSIVE INCOME (thousands of United States dollars, except per share amounts) (Unaudited)
AGNICO EAGLE MINES LIMITED CONDENSED INTERIM CONSOLIDATED STATEMENTS OF EQUITY (thousands of United States dollars, except share and per share amounts) (Unaudited)
AGNICO EAGLE MINES LIMITED CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS (thousands of United States dollars) (Unaudited)
AGNICO EAGLE MINES LIMITED NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (thousands of United States dollars, except share and per share amounts, unless otherwise indicated) (Unaudited) June 30,
2015
Agnico Eagle Mines (NYSE:AEM)
Historical Stock Chart
From Mar 2024 to Apr 2024
Agnico Eagle Mines (NYSE:AEM)
Historical Stock Chart
From Apr 2023 to Apr 2024