FARMINGDALE, N.Y., May 4 /PRNewswire-FirstCall/ -- Cemtrex Inc. (OTC:CTEX) announced that it is exhibiting its SM4 EPA-compliant Mercury Monitor along with its complete line of continuous emission monitors at the Electric Power 2006 Conference & Exhibition in Atlanta, Georgia. Over 330 utilities and representatives from over 47 countries around the world attend the Electric Power 2006 Conference & Exhibition. The event focuses on the needs of management, engineering and operations decision-makers from power plants, both at the plant level and from corporate headquarters. "In 2005, the U.S. EPA promulgated several significant rules that will collectively limit SO2, NOx, and mercury emissions from power plants across the nation," said Aron Govil, CEO & President of Cemtrex Inc. "The coal-fired utilities, in anticipation of the Clean Air Interstate Rule (CAIR) and the Clean Air Mercury Rule (CAMR), have been preparing themselves to meet the challenges of measuring and controlling SO2, NOx and Mercury." Cemtrex, through its MIP-Ducon division, offers a complete range of Process and Air Emissions monitoring instruments and software for all pollutants regulated by the EPA, including dust, opacity, CO2, O2, SO2, NOx, CO, flow, moisture, Ammonia, Mercury and hydrocarbons. Cemtrex caters to the CEMS and PGA (Process Gas Analyzer) market with a comprehensive range of Analyzers and offers total customer support, including design, sourcing, procurement, integration, testing and field services for pollution monitoring instruments and process gas analyzer systems. Cemtrex is engaged in manufacturing and selling the most advanced and custom-engineered equipment and systems for emission monitoring markets and carbon credits. The Company's products are sold to power plants, refineries, chemical plants, cement plants and other industries, including federal and state governmental agencies. Safe Harbor Statement This press release contains forward-looking statements. Actual results could differ materially from those projected in the forward-looking statements as a result of a number of risks and uncertainties. Statements made herein are as of the date of this press release and should not be relied upon as of any subsequent date. For further information, please contact: Cemtrex Inc. 19 Engineers Lane Farmingdale, NY 11735 URL: http://www.cemtrex.com/ Email: Direct: (516) 816-1400 This release was issued through eReleases(TM). For more information, visit http://www.ereleases.com/. DATASOURCE: Cemtrex Inc. CONTACT: Cemtrex Inc., +1-516-816-1400, or Web site: http://www.cemtrex.com/

Copyright