Date          27 July 2021 Polymetal International plc Q2 2021 production results 

Polymetal reports solid production results for the second quarter and the six months ended June 30, 2021.

"In Q2, Polymetal delivered steady results. All producing mines made budget targets while mechanical completion and start of commissioning at Nezhda represented a key development milestone", said Vitaly Nesis, Group CEO of Polymetal.

HIGHLIGHTS ? There were no fatal accidents during the first half of the year (consistent with H1 2020) among Polymetal's

workforce and the Company's contractors. Unfortunately, on July 18 a drilling contractor lost his life at the Saum

open-pit mine, part of Voro operations. We send our condolences to the family and friends of our colleague. ? The Company's Q2 gold equivalent ("GE") production decreased by 6% y-o-y to 339 Koz due to the planned grade

declines at Kyzyl and Albazino. GE output for H1 was 714 Koz, a 1% decrease y-o-y. ? Russia and Kazakhstan have entered the third wave of the COVID pandemic with record numbers of infections and

deaths from the virus. At Polymetal, the epidemiological situation remains well controlled with less than fifty

presently active cases, none at operating sites. COVID-related transportation restrictions have led to a material

increase of Kyzyl concentrate in storage and transit to China and prompted the management to accelerate seasonal

summer purchasing campaign across the portfolio. These factors drove a significant increase in working capital

levels, which should normalise by the year-end. ? Revenue for the quarter was up 6% y-o-y and reached USUSD 681 million on the back of higher metal prices. H1 revenue

increased by 12% y-o-y to USUSD 1,274 million. Net debt increased by USUSD 0.5 billion for the quarter to USUSD 1.83

billion due to record final dividend payment of USUSD 0.4 billion and working capital build-up. ? Construction and development activities at Nezhda and POX-2 projects progressed on schedule amid continued

tightness in the construction contractor market and COVID-related cross-border travel restrictions. Nezhda achieved

mechanical completion of the key equipment. The project is on track to produce first concentrate in early November

in line with the schedule. ? Following the latest review by Vigeo Eris, a global leader in ESG assessments, data, research and analytics,

Polymetal's ESG overall score improved to 69 (out of 100), corresponding to the Advanced level of performance and

placing Polymetal on the 2nd place among 43 industry peers[1]. ? Polymetal confirms its 2021 production guidance of 1.5 Moz of GE and maintains the full-year cost guidance of USUSD

700-750/GE oz for TCC and USUSD 925-975/GE oz for AISC. The cost guidance remains contingent on the Russian rouble

and Kazakh tenge exchange rate dynamics. The Company notes the continuous macro and COVID-related pressures

affecting its capital expenditures. The Company continues to prioritize timely project execution and to incur

additional costs to avoid project schedule slippage. ?

OPERATING HIGHLIGHTS

 
                                  3 months ended June 30,                    6 months ended June 30, 
                                                          % change1                                  % change1 
                                  2021        2020                           2021        2020 
 
Waste mined, Mt                   52.5        39.2        +34%               98.0        79.1        +24% 
Underground development, km       23.3        23.2        +0%                46.3        46.4        -0% 
Ore mined, Mt                     3.8         4.1         -8%                7.5         8.0         -6% 
Open-pit                          2.8         3.0         -7%                5.6         5.9         -6% 
Underground                       0.9         1.0         -9%                1.9         2.0         -5% 
Ore processed, Mt                 4.0         4.3         -7%                7.6         7.8         -3% 
Average GE grade processed, g/t   3.5         3.8         -9%                3.6         4.0         -9% 
Production 
Gold, Koz                         299         318         -6%                635         642         -1% 
Silver, Moz                       4.8         4.9         -1%                9.4         9.8         -4% 
Gold equivalent, Koz2             339         358         -6%                714         723         -1% 
Sales 
Gold, Koz                         315         324         -3%                595         595         +0% 
Silver, Moz                       4.3         5.2         -18%               8.0         9.9         -19% 
Revenue, USUSDm3                    681         641         +6%                1,274       1,135       +12% 
Net debt, USUSDm4                   1,827       1,321       +38%               1,827       1,351       +35% 
 
LTIFR5                            0.10        0.08        +25%               0.17        0.07        +143% 
Fatalities                        0           0           NA                 0           0           NA 
Notes: (1) % changes can be different from zero even when absolute numbers are unchanged because of rounding. Likewise, 
% changes can be equal to zero when absolute numbers differ due to the same reason. This note applies to all tables in 
this release. 
 (2) Based on 120:1 Au/Ag conversion ratio and excluding base metals.  Comparative data for 2020 restated accordingly. 
(3) Calculated based on the unaudited consolidated management accounts. 
(4) Non-IFRS measure based on unaudited consolidated management accounts. Comparative information is presented for 31 
March 2021 (for the three months period) and 31 December 2020 (for the six months period). 
(5) LTIFR = lost time injury frequency rate per 200,000 hours worked. 

PRODUCTION BY MINE

                3 months ended June 30, %      6 months ended June 30, % 
                2021        2020        change 2021        2020        change 
 
GOLD EQ. (KOZ)1 
Kyzyl           93          104         -10%   182         213         -14% 
Varvara         51          41          +23%   110         84          +31% 
Dukat           50          52          -3%    98          104         -5% 
Omolon          50          46          +9%    96          88          +10% 
Albazino        46          62          -26%   123         140         -12% 
Svetloye        26          31          -15%   53          52          +2% 
Voro            18          22          -17%   40          42          -5% 
Mayskoye        4           1           NM     10          1           NM 
TOTAL           339         358         -6%    714         723         -1% 

Notes: (1) Based on 120:1 Au/Ag conversion ratio and excluding base metals. Comparative data for 2020 restated accordingly.

CONFERENCE CALL AND WEBCAST

The Company will hold a conference call and webcast on Tuesday, 27 July 2021 at 12:00 London time (14:00 Moscow time).

To participate in the call, please dial:

From the UK:

+44 203 984 9844 (local access)

+44 800 011 9129 (toll free)

From the US:

+1 718 866 4614 (local access)

+1 888 686 3653 (toll free)

From Russia:

+7 495 283 9858 (local access)

To participate from other countries, please dial any of the local access numbers listed above.

Conference code: 785872

To participate in the webcast follow the link: https://mm.closir.com/slides?id=785872.

Please be prepared to introduce yourself to the moderator or register.

A recording of the call will be available at the same numbers and webcast link listed above within an hour after the call and until 3 August 2021.

About Polymetal

Polymetal International plc (together with its subsidiaries - "Polymetal", the "Company", or the "Group") is a top-10 global gold producer and top-5 global silver producer with assets in Russia and Kazakhstan. The Company combines strong growth with a robust dividend yield.

Enquiries

Media                                                   Investor Relations 
                                                        Polymetal          ir@polymetalinternational.com 
FTI Consulting 
                                                        Evgeny Monakhov    +44 20 7887 1475 (UK) 
Leonid Fink                            +44 20 3727 1000 
                                                        Timofey Kulakov 
Viktor Pomichal 
                                                        Kirill Kuznetsov   +7 812 334 3666 (Russia) 
Joint Corporate Brokers 
Morgan Stanley & Co. International plc +44 20 7425 8000 
Andrew Foster 
                                                        RBC Europe Limited 
Richard Brown 
                                                        Marcus Jackson     +44 20 7653 4000 
 
Panmure Gordon                                          Jamil Miah 
 
John Prior 
                                       +44 20 7886 2500 
Rupert Dearden 

Forward-looking statements

This release may include statements that are, or may be deemed to be, "forward-looking statements". These forward-looking statements speak only as at the date of this release. These forward-looking statements can be identified by the use of forward-looking terminology, including the words "targets", "believes", "expects", "aims", "intends", "will", "may", "anticipates", "would", "could" or "should" or similar expressions or, in each case their negative or other variations or by discussion of strategies, plans, objectives, goals, future events or intentions. These forward-looking statements all include matters that are not historical facts. By their nature, such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the company's control that could cause the actual results, performance or achievements of the company to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding the company's present and future business strategies and the environment in which the company will operate in the future. Forward-looking statements are not guarantees of future performance. There are many factors that could cause the company's actual results, performance or achievements to differ materially from those expressed in such forward-looking statements. The company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements contained herein to reflect any change in the company's expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based.

KYZYL

                            3 months ended June 30,          6 months ended June 30, 
                                                    % change                         % change 
                            2021        2020                 2021        2020 
MINING 
Waste mined, Mt             20.6        18.8        +10%     40.9        38.0        +7% 
Ore mined (open-pit), Kt    542         518         +5%      1,098       1,041       +5% 
 
PROCESSING 
Ore processed, Kt           569         481         +18%     1,133       1,006       +13% 
Gold grade, g/t             6.5         8.5         -24%     6.2         8.3         -25% 
Gold recovery               89.9%       87.2%       +3%      89.4%       87.2%       +2% 
Concentrate produced, Kt    34.2        37.3        -8%      69.3        73.0        -5% 
Concentrate gold grade, g/t 97.0        97.4        -0%      90.9        99.3        -8% 
Gold in concentrate, Koz1   107         117         -9%      202         233         -13% 
 
Concentrate shipped, Kt     21.4        26.4        -19%     48.4        47.3        +2% 
Payable gold shipped, Koz   40          51          -21%     86          92          -6% 
 
Amursk POX 
Concentrate processed, Kt   13          13          +1%      25          29          -13% 
Gold grade, g/t             130.8       149.2       -12%     133.9       141.8       -6% 
Gold recovery               90.2%       91.8%       -2%      91.3%       91.8%       -1% 
Gold produced, Koz          53          54          -0%      96          121         -20% 
 
TOTAL PRODUCTION 
Gold, Koz                   93          104         -10%     182         213         -14% 

Note: (1) For information only; not considered as gold produced and therefore not reflected in the table representing total production. It will be included in total production upon shipment to off-taker or dore production at Amursk POX.

(2) To be further processed at Amursk POX.

In Q2, the Kyzyl concentrator set a quarterly throughput record (second in a row) and also achieved the record recovery following full commissioning of the expanded dewatering section. Grade processed, as expected, declined y-o-y towards the open-pit reserve average. The planned grade decline will continue to impact production at Kyzyl throughout 2021 and will be only partially offset by higher throughput and improved recoveries.

A 10% increase in open-pit rock moved was achieved without new equipment thanks to productivity improvements driven by reduction in truck and excavator downtime.

Delivery of Kyzyl concentrate to ?hina was disrupted given the anti-COVID precautionary measures at seaports and railway crossings which have resulted in substantial rail car and ship deficit as well as lengthening round-trip times. Polymetal is switching from bulk (boxcar) to container shipping to accelerate cycle times and expects the sales/ production gap to close by year-end. ALBAZINO

                            3 months ended June 30,          6 months ended June 30, 
                                                    % change                         % change 
                            2021        2020                 2021        2020 
MINING 
Waste mined, Mt             5.6         5.1         +10%     10.7        9.9         +8% 
Underground development, km 3.9         3.1         +24%     7.1         6.2         +15% 
Ore mined, Kt               455         464         -2%      949         981         -3% 
Open-pit                    268         295         -9%      576         655         -12% 
Underground                 187         169         +11%     373         325         +15% 
 
PROCESSING 
Albazino concentrator 
Ore processed, Kt           444         446         -0%      871         891         -2% 
Gold grade, g/t             4.0         4.8         -16%     4.1         4.6         -11% 
Gold recovery1              88.4%       86.5%       +2%      88.6%       86.0%       +3% 
Concentrate produced, Kt    33.7        36.8        -8%      66.5        72.7        -9% 
Concentrate gold grade, g/t 46.7        50.0        -7%      48.1        49.1        -2% 
Gold in concentrate, Koz2   51          59          -14%     103         115         -10% 
 
Amursk POX 
Concentrate processed, Kt   34          40          -15%     82          86          -4% 
Gold grade, g/t             47.1        51.6        -9%      50.4        52.6        -4% 
Gold recovery               96.3%       96.5%       -0%      96.4%       96.5%       -0% 
Gold produced, Koz          46          62          -26%     123         139         -12% 
 
TOTAL PRODUCTION 
Gold, Koz                   46          62          -26%     123         139         -12% 

Notes: (1) To concentrate.

(2) For information only; not considered as gold produced and therefore not reflected in the table representing total production. Included in total production after Dore production at the Amursk POX.

In H1, Albazino recorded a 12% decrease in production as the Anfisa high-grade open pit is nearing full depletion. The ramp-up of stoping at the Ekaterina-2 underground mine only partially compensates for this development. The new open pit, Farida, with lower grades, drove a 10% increase in waste volumes.

Recovery at the concentrator improved by 2 p.p. and 3 p.p. in Q2 and H1 2021 respectively as feedstock mix shifted to ores from deeper underground levels.

Construction at the Kutyn heap leach project is in full swing with final construction permits in place and contractors fully mobilized on site.

MAYSKOYE

                                                  3 months ended June 30,          6 months ended June 30, 
                                                                          % change                         % change 
                                                  2021        2020                 2021        2020 
MINING 
Waste mined, Mt                                   1.0         0.6         +63%     2.0         1.7         +16% 
Underground development, km                       4.7         5.5         -14%     9.8         11.0        -11% 
Ore mined, Kt                                     197         306         -36%     388         567         -32% 
Open-pit                                          38          108         -64%     51          186         -73% 
Underground                                       158         197         -20%     336         380         -12% 
 
PROCESSING 
Ore processed, Kt                                 218         230         -5%      435         458         -5% 
Gold grade, g/t                                   5.7         6.7         -15%     6.0         6.2         -4% 
Gold recovery                                     92.0%       84.4%       +9%      92.3%       87.5%       +5% 
Gold in concentrate, Koz2                         37          37          -1%      77          76          +2% 
 
Gold produced in dore from concentrate (POX), Koz 4           -           NM       5           -           NM 
Gold produced in dore from carbon, Koz3           -           1           NM       5           1           NM 
 
TOTAL PRODUCTION 
Gold, Koz                                         4           1           NM       10          1           NM 

Notes: (1) To concentrate.

(2) For information only; not considered as gold produced and therefore not reflected in the table representing total production. Included in total production upon sale to off-taker or dore production at Amursk POX.

(3) Gold produced from carbon at Amursk POX.

At Mayskoye, in Q2 2021 the plant only processed sulphide ore while in Q2 2020 oxidised material from the open pit was also part of the feed. Thus, the grades and recoveries are not comparable y-o-y. The Company started processing oxidised ore in July 2021.

Underground mine electrification project is running on schedule. Conveyor installation has commenced with first ore deliveries to the surface expected in Q2 2022.

AMURSK POX

                          3 months ended June 30,          6 months ended June 30, 
                                                  % change                         % change 
                          2021        2020                 2021        2020 
Concentrate processed, Kt 50          53          -7%      110         115         -4% 
    Albazino              33          38          -14%     77          79          -2% 
    Kyzyl                 13          13          +1%      25          29          -13% 
    Mayskoye              2           -           NA       3           -           NA 
    Veduga                -           1           -100%    4           3           +38% 
    Other1                1           0           NA       1           3           -73% 
Gold recovery             93.0%       94.2%       -1%      94.0%       94.2%       -0% 
Average gold grade, g/t   69.8        75.6        -8%      69.7        75.2        -7% 
Average sulphur grade     14.1%       13.5%       +4%      13.8%       13.9%       -1% 
Total gold produced2, Koz 103         116         -11%     224         261         -14% 
    Albazino              45          51          -13%     112         111         +1% 
    Kyzyl                 53          54          -0%      96          121         -20% 
    Mayskoye              4           -           NA       5           0           NA 
    Veduga                -           4           -100%    9           19          -49% 
    Other1                1           6           -86%     1           10          -91% 

Notes: (1) Purchased concentrates which are included in reportable production in the Albazino segment.

(2) For information only. Already accounted for in production at operating mines.

POX quarterly output was down due to lower production from Albazino concentrate and a 1 p.p. decrease in POX recovery on the back of the increased share of more metallurgically challenging material from Kyzyl.

A planned three-week autoclave maintenance shutdown in April went smoothly and identified no material issues.

VARVARA

                               3 months ended June 30,          6 months ended June 30, 
                                                       % change                         % change 
                               2021        2020                 2021        2020 
MINING 
Waste mined, Mt                10.0        10.1        -1%      19.5        20.3        -4% 
Ore mined, Kt                  850         702         +21%     1,906       1,484       +28% 
 
PROCESSING 
Leaching 
Ore processed, Kt              794         796         -0%      1,558       1,530       +2% 
Gold grade, g/t                1.7         1.5         +11%     1.7         1.5         +12% 
Gold recovery1                 89.9%       89.1%       +1%      88.2%       88.1%       +0% 
Gold production (in dore), Koz 38          32          +19%     84.4        66.8        +26% 
 
Flotation 
Ore processed, Kt              185         188         -1%      375         317         +19% 
Gold grade, g/t                2.8         2.6         +9%      2.7         2.8         -4% 
Recovery1                      83.9%       87.2%       -4%      84.3%       86.5%       -3% 
Gold in concentrate, Koz       12          9           +41%     26          18          +47% 
 
Total ore processed, Kt        979         984         -0%      1,933       1,876       +3% 
 
 
TOTAL PRODUCTION 
Gold, Koz                      51          41          +23%     110         84          +31% 

Note: (1) Technological recovery, includes gold and copper within work-in-progress inventory. Does not include toll-treated ore.

(2) To be further processed at Amursk POX.

Q2 gold production at Varvara was up 23% y-o-y driven by higher grade leach ore from Komar and grade increase in third-party material at flotation circuit. Gold recovery from low copper grade ore improved to 89.9% after leaching circuit expansion increased residence time.

DUKAT OPERATIONS

                            3 months ended June 30,          6 months ended June 30, 
                                                    % change                         % change 
                            2021        2020                 2021        2020 
MINING 
Waste mined, Mt             0.7         -           NA       1.1         -           NA 
Underground development, km 11.1        10.9        +1%      22.8        22.2        +3% 
Ore mined, Kt               638         545         +17%     1,283       1,084       +18% 
    Open-pit                119         -           NA       223         -           NA 
    Underground             518         545         -5%      1,060       1,084       -2% 
 
PROCESSING 
Omsukchan concentrator 
Ore processed, Kt           508         496         +3%      1,021       1,009       +1% 
Grade 
Gold, g/t                   0.6         0.6         -6%      0.5         0.5         -3% 
Silver, g/t                 257         273         -6%      255         280         -9% 
Recovery1 
Gold                        87.1%       85.1%       +2%      85.3%       84.8%       +1% 
Silver                      87.6%       87.4%       +0%      87.2%       86.6%       +1% 
Production 
Gold, Koz                   8           8           -1%      14          14          -0% 
Silver, Moz                 3.6         3.7         -4%      7.1         7.7         -7% 
 
Lunnoye plant 
Ore processed, Kt           122         116         +5%      237         232         +2% 
Grade 
Gold, g/t                   1.6         1.4         +15%     1.6         1.5         +7% 
Silver, g/t                 219         278         -21%     235         273         -14% 
Recovery1 
Gold                        90.0%       91.8%       -2%      90.8%       91.2%       -0% 
Silver                      93.2%       92.8%       +0%      92.6%       92.1%       +1% 
Production 
Gold, Koz                   6           5           +17%     11          10          +9% 
Silver, Moz                 0.8         1.0         -17%     1.6         1.9         -12% 
 
TOTAL PRODUCTION 
Gold, Koz                   13          13          +6%      25          24          +3% 
Silver, Moz                 4.4         4.7         -6%      8.8         9.5         -8% 

Notes: (1) Technological recovery, includes gold and silver within work-in-progress inventory.

Dukat continues to experience planned grade decline, which resulted in a y-o-y production decrease. Ore mined was higher y-o-y as open-pit mining recommenced in Q1.

Primorskoye satellite underground mine produced first ore from development with first deliveries of high-grade direct shipment material to third-party smelters expected in Q3. OMOLON OPERATIONS

                            3 months ended June 30,          6 months ended June 30, 
                                                    % change                         % change 
                            2021        2020                 2021        2020 
MINING 
Waste mined, Mt             1.3         1.1         +13%     1.6         2.0         -23% 
Underground development, Km 3.0         3.7         -19%     5.7         7.0         -19% 
Ore mined, Kt               113         763         -85%     186         1,564       -88% 
    Open-pit                34          642         -95%     34          1,331       -97% 
    Underground             78          121         -35%     151         234         -35% 
 
PROCESSING 
Kubaka Mill 
Ore processed, Kt           217         220         -1%      429         433         -1% 
Grade 
Gold, g/t                   6.5         6.6         -1%      6.7         6.7         -1% 
Silver, g/t                 64          26          +150%    44          20          +122% 
Recovery1 
Gold                        95.0%       94.3%       +1%      93.9%       93.2%       +1% 
Silver                      81.0%       69.5%       +17%     79.5%       74.3%       +7% 
Gold production, Koz        43          41          +6%      88          83          +7% 
Silver production, Moz      0.3         0.1         +177%    0.5         0.2         +144% 
 
Birkachan Heap Leach 
Ore stacked, Kt             308         707         -56%     353         707         -50% 
Gold grade, g/t             1.3         2.3         -44%     1.2         2.3         -45% 
Gold production, Koz        4           3           +7%      4           3           +24% 
 
TOTAL PRODUCTION 
Gold, Koz                   47          45          +6%      93          86          +8% 
Silver, Moz                 0.3         0.1         +171%    0.5         0.2         +141% 

Note: (1) Technological recovery, includes gold and silver within work-in-progress inventory.

In Q2, the Merrill-Crowe circuit at Kubaka plant was re-launched after a shut-down in 2020 as sufficient volumes of high silver grade material became available.

Grade at Birkachan heap leach decreased due to the higher base in 2020 when higher-grade stockpiled ore was processed. Stacking was lower with the crusher focused on re-handling of previously stacked ore.

Ore mining was down as Olcha open pit and underground mines as well as Birkachan open pit have been depleted. A new open pit mine at Burgali, 110 km from the processing plant, produced first ore.

The commissioning of the 2.5 MWh solar power plant commenced in July. The dry tailings storage facility achieved mechanical completion and is on track to enter production by the end of 2021.

SVETLOYE

                         3 months ended June 30,          6 months ended June 30, 
                                                 % change                         % change 
                         2021        2020                 2021        2020 
MINING 
Waste mined, Mt          1.1         0.9         +22%     1.8         1.6         +9% 
Ore mined (open pit), Kt 536         561         -4%      926         907         +2% 
 
PROCESSING 
Ore stacked, Kt          366         317         +16%     648         626         +4% 
Gold grade, g/t          2.8         3.7         -24%     3.7         4.0         -9% 
Gold production, Koz     26          31          -15%     53          52          +2% 
 
TOTAL PRODUCTION 
Gold, Koz                26          31          -15%     53          52          +2% 

Quarterly gold production at Svetloye contracted y-o-y on the back of the planned decline in grade. Stacking increase is attributable to the low base of Q2 2020 when stacking volumes were impacted by maintenance shutdown of the ore crushing complex.

Waste mined jumped as mining started at the new Lyudmila pit.

VORO

                     3 months ended June 30,          6 months ended June 30, 
                                             % change                         % change 
                     2021        2020                 2021        2020 
MINING 
Waste mined, Mt      3.0         -           NA       3.6         -           NA 
Ore mined, Kt        57          -           NA       68          -           NA 
 
PROCESSING 
CIP 
Ore processed, Kt    262         260         +1%      522         529         -1% 
Gold grade, g/t      1.9         2.2         -17%     2.0         2.2         -8% 
Gold recovery1       84.6%       82.5%       +3%      84.2%       82.3%       +2% 
Gold production, Koz 16          18          -11%     36          36          -0% 
 
Heap Leach 
Ore stacked, Kt      -           22          -100%     -          22          -100% 
Gold grade, g/t      -           0.9         -100%     -          0.9         -100% 
Gold production, Koz 2           4           -53%     4           6           -38% 
 
TOTAL PRODUCTION 
Gold, Koz            18          22          -18%     40          42          -6% 

Note: (1) Technological recovery, includes gold within work-in-progress inventory.

Gold production at Voro continued to drift lower as the plant processed predominantly low-grade historical stockpiles. Recovery for the reporting quarter and H1 improved by 3 p.p. and 2 p.p. y-o-y respectively as oxidized ore from Saum was introduced to the feed.

At the Voro flotation plant, the foundations for equipment and steel framework for the concentrator building were completed. SAG and ball mills have been installed. The project is 50% completed.

NEZHDA

                3 months ended June 30,          6 months ended June 30, 
                                        % change                         % change 
                2021        2020                 2021        2020 
MINING 
Waste mined, Mt 5.6         -           NA       11.0        -           NA 
Ore mined, Kt   365         -           NA       710         -           NA 

Construction and mining activities proceeded on schedule. Mechanical completion of key equipment, including SAG and ball mills, was achieved. Cold commissioning of individual equipment items is in progress with multiple representatives of international suppliers on site.

Construction of the dry-stack tailings storage facility is nearing completion. The project is on track to produce first concentrate on November 1, 2021.

POX-2

Construction progressed on schedule. In Q2, the large-sized equipment of oxygen station was installed. Equipment foundation construction at the POX building is being finalized. Downstream circuit metal framework construction was completed.

The Suez straits crisis lead to multiple delays in shipment of key equipment from Europe. The management is evaluating alternative options of ensuring the timely arrival of items on the critical path, including booking single-cargo vessels at increased cost.

SUSTAINABILITY, HEALTH AND SAFETY

There were no fatal accidents during the first half of the year (consistent with H1 2020) among Polymetal's workforce and the Company's contractors. We regret to report that on July 18 a drilling contractor lost his life at the Saum open-pit mine, part of Voro operations. We send our condolences to the family and friends of our colleague. The incident is currently under investigation to understand the root cause of the accident to prevent any recurrence.

LTIFR among the Group's employees in Q2 2021 stood at 0.10, in comparison with 0.08 in Q2 2020, while for the first half of 2021 LTIFR was 0.17 vs 0.07 a year earlier. There were three incidents among employees during the quarter and no incidents with contractor workers. During H1 2021, there were ten lost-time injuries in total vs four cases during H1 2020.

In Q2, Vigeo Eiris (part of Moody's ESG solutions), a global leader in ESG assessments, data, research and analytics , raised Polymetal's overall ESG score from 48 to 69 (out of 100) which corresponds with the Advanced level, the highest on the company's ranking scale. The new score places Polymetal on the second place out of 43 in the Mining & Metals sector and 22nd place in the global ranking universe (4,939 companies). For more information visit vigeo-eiris.com.

The reporting quarter was also marked with a couple of other external recognitions, which confirms our success as a responsible company: Polymetal took the 7th place in Russia's 30 most eco-friendly companies rating and the 2nd place among metals and mining companies in Russia by Forbes.

COVID-19 UPDATE

Epidemiological situation in the Company remains under control. Number of active cases increased q-o-q as Russia and Kazakhstan entered the third wave of the pandemic. As of the date of this press release, there are less than 50 active cases of the disease in Polymetal, none of which observed at production sites. Operations and development projects continue undisrupted. All precautionary measures, including extensive testing and observatory periods, are maintained at all sites.

Multiple regions introduced requirements for mandatory vaccination within certain industries (hospitality, transportation services). Continuously operating industries (including mining) are currently not targeted. Polymetal continues to facilitate non-obligatory vaccination among employees by organizing vaccination at local hospitals or establishing vaccination points on site.

The Company estimates COVID-related cash expenses at approximately USUSD 5 million per month with the majority recorded as operating costs. This translates into roughly USUSD 35 per GE ounce in AISC. -----------------------------------------------------------------------------------------------------------------------

[1] For more information visit vigeo-eiris.com. -----------------------------------------------------------------------------------------------------------------------

ISIN:          JE00B6T5S470 
Category Code: MSCH 
TIDM:          POLY 
LEI Code:      213800JKJ5HJWYS4GR61 
Sequence No.:  118521 
EQS News ID:   1221796 
 
End of Announcement  EQS News Service 
=------------------------------------------------------------------------------------
 
Image link: 
https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=show_t_gif&application_id=1221796&application_name=news 
 

(END) Dow Jones Newswires

July 27, 2021 02:01 ET (06:01 GMT)

Polymetal (LSE:POLY)
Historical Stock Chart
From Feb 2024 to Mar 2024 Click Here for more Polymetal Charts.
Polymetal (LSE:POLY)
Historical Stock Chart
From Mar 2023 to Mar 2024 Click Here for more Polymetal Charts.