Hurricane Energy PLC Operational Update and Notice of Results (0001Y)
May 10 2021 - 2:00AM
UK Regulatory
TIDMHUR
RNS Number : 0001Y
Hurricane Energy PLC
10 May 2021
10 May 2021
Hurricane Energy plc
("Hurricane" or the "Company")
Operational Update and Notice of Results
Operational Update
Hurricane Energy plc, the UK based oil and gas company, provides
an update on Lancaster field operations, pursuant to the Company's
reporting framework outlined in the Proposed Financial
Restructuring announcement as initially published by the Company on
30 April 2021.
The following table details production volumes, water cut and
minimum flowing bottom hole pressure for the 205/21a-6 ("P6") well
during April 2021. During the month, and as part of the Company's
periodic well testing programme for reservoir management purposes,
the Lancaster field was producing from both the P6 and 205/21a-7z
("P7z") wells in various different configurations and at various
production rates, including periods of well shut-ins for pressure
build-up tests. As a result, monthly oil and water production is
also included for the P7z well.
April 2021 Lancaster Field Data
P6 P7z(1)
O il produced during the month
(kbbls) 303 19
------- -------
Average oil rate (bopd) 10,100 n.m.
------- -------
W ater produced during the month
(kbbls) 116 83
------- -------
A verage water cut(2) 28% n.m.
------- -------
Well gauge p ressure (psia)(3) 1,657 n.m.
------- -------
1. P7z on production for nine days in the period for the purpose
of well testing. Average oil, water cut and pressure data are not
meaningful (n.m.) due to short production duration
2. Expressed as total water produced divided by total fluid (oil and water) production
3. Pressure reported is the monthly minimum from well downhole gauge
The average Lancaster oil production rate for April 2021 was
lower than prior months, when the P6 well was producing on a
standalone basis in line with the Company's near-term production
strategy. Lancaster is currently producing 11,600 bopd from the P6
well alone with an associated water cut of 29%.
Notice of Results
Hurricane's full-year results for 2020 will be announced on 25
May 2021.
-ends-
Contacts:
Hurricane Energy plc
Antony Maris, Chief Executive Officer
Philip Corbett, Head of Investor Relations +44 (0)1483 862820
Stifel Nicolaus Europe Limited
Nominated Adviser & Joint Corporate Broker
Callum Stewart / Ashton Clanfield +44 (0)20 7710 7600
Investec Bank plc
Joint Corporate Broker
Chris Sim / Rahul Sharma +44 (0)20 7597 5970
Vigo Communications
Public Relations
Patrick d'Ancona / Ben Simons
hurricane@vigocomms.com +44 (0)20 7390 0230
About Hurricane
Hurricane was established to discover, appraise and develop
hydrocarbon resources associated with naturally fractured basement
reservoirs. The Company's acreage is concentrated on the Rona
Ridge, in the West of Shetland region of the UK Continental
Shelf.
The Lancaster field (100% owned by Hurricane) is the UK's first
producing basement field. Hurricane is pursuing a phased
development of Lancaster, starting with an Early Production System
consisting of two wells tied-back to the Aoka Mizu FPSO.
Hydrocarbons were introduced to the FPSO system on 11 May 2019 and
the first oil milestone was achieved on 4 June 2019.
In September 2018, Spirit Energy farmed-in to 50% of the Lincoln
and Warwick assets, committing to a phased work programme targeting
sanction of an initial stage of full field development.
Visit Hurricane's website at www.hurricaneenergy.com
Glossary
bopd Barrels of oil per day
FPSO Floating production storage and offloading
vessel
===========================================
kbbls Thousand barrels
===========================================
psia pounds per square inch absolute
===========================================
Inside Information
This announcement does not contain inside information.
This information is provided by RNS, the news service of the
London Stock Exchange. RNS is approved by the Financial Conduct
Authority to act as a Primary Information Provider in the United
Kingdom. Terms and conditions relating to the use and distribution
of this information may apply. For further information, please
contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms
and conditions, to analyse how you engage with the information
contained in this communication, and to share such analysis on an
anonymised basis with others as part of our commercial services.
For further information about how RNS and the London Stock Exchange
use the personal data you provide us, please see our Privacy
Policy.
END
UPDALMRTMTIMBTB
(END) Dow Jones Newswires
May 10, 2021 02:00 ET (06:00 GMT)
Hurricane Energy (LSE:HUR)
Historical Stock Chart
From Mar 2024 to Apr 2024
Hurricane Energy (LSE:HUR)
Historical Stock Chart
From Apr 2023 to Apr 2024