TIDMHUM

RNS Number : 0858B

Hummingbird Resources PLC

09 February 2022

Hummingbird Resources plc / Ticker: HUM / Index: AIM / Sector: Mining

9 February 2022

Hummingbird Resources plc

('Hummingbird' or the 'Company')

Yanfolila Drilling Update

Yanfolila drilling results, including 4 meters at 64.68 g/t, highlight life of mine upside potential

Hummingbird Resources plc (AIM: HUM) provides an update on its extensive and completed 2021 exploration drilling programme at the Yanfolila gold mine ("Yanfolila") in Mali from the Sanioumale East ("SE") and greenfield deposit, BBC . For the full release, including graphics, please follow the link here

http://www.rns-pdf.londonstockexchange.com/rns/0858B_1-2022-2-8.pdf

The Company notes that these assays are the final to be received from the Yanfolila 2021 drilling programme, which totalled c.48,000 meters ("m"). The results from the programme are now being analysed and will be included in our updated 2022 Company Resources and Reserves statement, scheduled to be released in Q2 2022.

Drilling Highlights :

-- The Company has received and analysed a further c.12,000 m of assays from the SE deposit and c.3,179 m of assays from the initial drilling done at greenfield deposit BBC. A total of c.17,700 m of drilling was completed at the SE deposit in 2021

-- Results for SE continue to show significant grade and extending at depth for the deposit, as illustrated, for example, by hole SNEDD0005 containing 4 metres ("m") at 64.68 grams a ton ("g/t")

-- These and historical drilling results highlight the upside potential to SE's current Resources and Reserves profile of 204,000 ounces ("oz") and 100,300 oz respectively, and provide an increasing level of confidence in the overall geology of the SE deposit as a key future deposit to be mined at Yanfolila, which is scheduled to commence in Q1, 2023.

o The extent of the SE deposit's potential is highlighted in the graphics (which can be viewed via [Insert Link to PDF]) including SE satellite deposit plan view showing multiple open pits over the yet to be fully explored c.1.5 kilometers ("Km") strike zone; SE cross section drill view; and SE historical and 2021 drill intercept cross section view over the strike zone area

-- Greenfield target BBC is receiving its first round of drill testing, and have shown the potential to establish new resources at this deposit. This further adds to additional greenfield upside at Yanfolila's other greenfield deposits Karma and Diaban as highlighted in the 20 December 2021 Yanfolila drilling update release

-- Notable drill results from the SE deposit include:

o 4m at 64.68 g/t from 63m (SNEDD0005)

o 18m at 5.13 g/t from 7m (SNERC0511)

o 16m at 4.51 g/t from 138m (SNERCO438)

o 15m at 4.44 g/t from 75m (SNERCO476)

o 18m at 3.70 g/t from 128m (SNERC0495)

o 5m at 5.06 g/t from 99m (SNERC0495)

o 7m at 7.48 g/t from 46m (SNERC0479)

o 4m at 10.36 g/t from 230M (SNEDD0008)

o 3m at 7.25 g/t from 176m (SNERC0440

-- Notable drill results from the greenfield deposit, BBC include:

o 2m at 6.22 g/t from 78m (KBCR0058)

o 3m at 4.05 g/t from 39m (KBCRC0035)

o 5m at 1.69 g/t from 4m (KBCR0045)

o 5m at 1.38 g/t from 28m (KBCRC0035)

o 3m at 1.96 g/t from 60m (KBCRC0059)

Dan Betts, CEO of Hummingbird Resources, commented:

"Today's announcement marks the completion of our 2021 Yanfolila exploration programme of c.48,000 m. We are still awaiting on further assays from our 2021 Kouroussa drilling campaign of c.24,000 m which we will release findings on once received and analysed, which we expect to be completed this quarter.

Overall the drill programme has demonstrated the significant upside to extend the life of mine at Yanfolila on existing known deposits, coupled with upside from our greenfield deposits still only in their infancy. The results from the SE drilling are particularly encouraging, shoring up our confidence that SE will be a key future minable deposit at Yanfolila for the years ahead. This all is a positive step as we move towards our s trategic goal of achieving a +10-year Reserve mine life at Yanfolila. "

Noris Del Bel Belluz, Group Technical Services Manager of Hummingbird Resources, commented:

"As we round out receiving and analysing assay data from our extensive 2021 drilling campaign, the key focus for the geology team is to incorporate these into the Company's updated 2022 Resources and Reserves databases so as to provide valuable data to be used in our future mine plans at both Yanfolila and Kouroussa."

Sanioumale East selected drill results

 
   Hole ID      Depth From (m)   Depth To (m)   Intercept Description 
 SEMTDD0001*          24             52.3         28.3m @ 3.94 g/t 
               ---------------  -------------  ---------------------- 
 SNEDD0001           315             332           17m @ 1.38 g/t 
               ---------------  -------------  ---------------------- 
 SNEDD0002            15             20.8          5.8m @ 2.06 g/t 
               ---------------  -------------  ---------------------- 
 SNEDD0002            29              36           7.5m @ 1.35 g/t 
               ---------------  -------------  ---------------------- 
 SNEDD0005            63              67           4m @ 64.68 g/t 
               ---------------  -------------  ---------------------- 
 SNEDD0007           115            123.2          8.6m @ 1.17 g/t 
               ---------------  -------------  ---------------------- 
 SNEDD0008           208            210.8          2.8m @ 3.24 g/t 
               ---------------  -------------  ---------------------- 
 SNEDD0008           230             234           4m @ 10.36 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0438           138             154           16m @ 4.51 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0440           176             179            3m @ 7.25 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0441           148             160           12m @ 2.00 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0445           126             134            8m @ 1.07 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0447            40              42            2m @ 5.24 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0455            72              75            3m @ 2.60 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0459           120             123            3m @ 1.75 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0467            34              40            6m @ 1.52 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0468            96             107           11m @ 1.10 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0469            43              57           14m @ 2.89 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0476            24              26            2m @ 6.32 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0476            75              90           15m @ 4.44 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0479            46              53            7m @ 7.48 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0480           192             194            2m @ 4.63 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0482           150             160           10m @ 1.82 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0487            66              72            6m @ 1.98 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0489            58              69           11m @ 2.91 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0495            99             104            5m @ 5.06 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0495           128             146           18m @ 3.70 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0498            27              29            2m @ 7.03 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0498            73              90           17m @ 2.21 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0510            59              73           14m @ 0.90 g/t 
               ---------------  -------------  ---------------------- 
 SNERC0511            7               25           18m @ 5.13 g/t 
               ---------------  -------------  ---------------------- 
 SNERCD0004          184             192            8m @ 2.49 g/t 
               ---------------  -------------  ---------------------- 
 

* Downhole length of metallurgical hole intercept (not true width)

BBC selected drill results

 
  Hole ID     Depth From (m)   Depth To (m)   Intercept Description 
 KBCRC0058          78              80            2m @ 6.22 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0035          39              42            3m @ 4.05 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0045          4               9             5m @ 1.69 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0035          28              33            5m @ 1.38 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0059          60              63            3m @ 1.96 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0069          20              28            8m @ 0.68 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0060          11              12            1m @ 5.18 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0039          74              78            4m @ 0.95 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0039          30              36            6m @ 0.56 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0040          12              14            2m @ 1.67 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0053          2               4             2m @ 1.66 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0065          46              47            1m @ 2.37 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0046          0               1             1m @ 2.31 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0069          36              37            1m @ 1.77 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0069         114             115            1m @ 1.55 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0039          23              24            1m @ 1.46 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0041          92              93            1m @ 1.36 g/t 
             ---------------  -------------  ---------------------- 
 KBCRC0042          79              80            1m @ 1.15 g/t 
             ---------------  -------------  ---------------------- 
 

Qualified Person Review:

David Muir, has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as required under the AIM Rules for Companies. David is the Group Database Manager for Hummingbird, and is a "Competent Person", according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves ("JORC Code, 2012 Edition") and is a member of good standing with the Australian Institute of Geoscientists (AIG).

**ENDS**

Notes to Editors:

Hummingbird Resources (AIM: HUM) is a multi-asset, multi-jurisdiction gold production, development and exploration Company, member of the World Gold Council and founding member of Single Mine Origin ( www.singlemineorigin.com ). The Company currently has two core gold projects, the operational Yanfolila Gold Mine in Mali, and the Kouroussa Gold Mine in Guinea, which will more than double current gold production when in production, scheduled for first gold pour end of Q2 2023. Further, the Company has a controlling interest in the Dugbe Gold Project in Liberia that is being developed by Pasofino Gold Limited through an earn-in agreement. Our vision is to continue to grow our asset base, producing profitable ounces, while placing our Environmental, Social & Governance ('ESG') policies and practices at the heart of all we do.

For further information, please visit hummingbirdresources.co.uk or subscribe to our investor releases via investor email alerts

 
 Daniel Betts,          Hummingbird Resources       Tel: +44 (0) 20 7409 
  CEO                    plc                         6660 
  Thomas Hill, 
  FD 
  Anthony Köcken 
  , COO 
  Edward Montgomery, 
  CSO & ESG 
 James Spinney          Strand Hanson Limited       Tel: +44 (0) 20 7409 
  Ritchie Balmer         Nominated Adviser           3494 
                       --------------------------  ---------------------------- 
 James Asensio          Canaccord Genuity Limited   Tel: +44 (0) 20 7523 
  Thomas Diehl           Broker                      8000 
                       --------------------------  ---------------------------- 
 Bobby Morse            Buchanan                    Tel: +44 (0) 20 7466 
  Ariadna Peretz         Financial PR/IR             5000 
  James Husband                                      Email: HUM@buchanan.uk.com 
                       --------------------------  ---------------------------- 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

DRLUWSRRUOUURUR

(END) Dow Jones Newswires

February 09, 2022 02:00 ET (07:00 GMT)

Hummingbird Resources (LSE:HUM)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Hummingbird Resources Charts.
Hummingbird Resources (LSE:HUM)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Hummingbird Resources Charts.