couldn't sleep so have been checking the Hardman drilling reports on the Oz market, main points (re Mputa-1) being:
Mputa-1:
driveshaft repaired; operations recommenced 31/12/05; drilled to 347m; wireline logs run; status midnight 02/01/06 - preparing to run blowout preventers prior to drilling to total depth (planned at 1,100m)