Tailback, let me comment on your poisoned reamrks. The immediacy of the meeting has been lost in not publishing details to those in the shareholder group. It need not have been made public through ADVFN or the other sites as the audience may not be members of the group and it could have been cautioned with caveats.
To go back and ask for approval as to whether as a result of the notes taken at the meeting are given them the "right" impression is incredible. I can understand the importance of technical data being accurate, but if that was what the meeting descended into, then it was a waste of their time and a squandering of opportunity. I don't care whether there are 9 jhoules of energysaved as a result of a variation in pitch of some nuddle pin being shorter on the outside of some widget casing, I want to know what hurdles need to be overcome before a decision to include IVT in production quantity to assure survival of the company.
As I understand things, there is still considerable research and testing to be completed (which it is expected that Aisin will be paying for) before the decision to include can be made. How long will that take and has such testing been completed with say Getrag?
Sure, I have not a lot to say, but to be fair, there isn't a great deal of material with which to work is there?