Brasso, it has been a testing period of time from IPO as TAG to now as PELE, however, if you look at how things have progressed, the options on the table now are much better with the present state of PELE, than they ever were under TAG.
What I would like to see is at least 2 of the 3 A7-2005 workovers being good (likely T-4 and T-5). Its just a shame we started with A-2, however given its the most unlikely to flow, if it does now flow it will represent very good news. Atzam has 3 potential drilling targets up dip from A-2 well location.