From the testing programme RNS of 13/12
"The well is being sidetracked to enable the cutting of cores in these prospective zones to be followed by an open hole flow test. Once all the cores have been cut and logs and samples have been collected, a production liner will be run.
The cores obtained will be subjected to detailed petrophysical and mechanical analysis. From the information obtained, a fracture stimulation programme will be constructed that has the optimum chance of success."
Are we still expecting these things will take place? They seem to be very optimistic statements, not the sort you would make unless you were very confident.