for the benefit of joe tosser lets re write PRE's news
20th December 2002
The seismic Monteagudo partners are seismic considering a seismic proposal from an international seismic oil group to substantially boost the field’s oil production by drilling three NEW very vEry NEW seismic wells yearly on untapped seismic sections of the NEW Monteagudo oil reservoir. The group proposing to seismic farm in has NEW extensive experience of boosting production from similar seismic reservoirs elsewhere. Monteagudo NEW oil production has been comparatively stable over time. Reservoir engineers believe that it may respond particularly well to modern drilling seismic techniques. Current oil production is about 630 barrels in seismic addition to over 2 million cubic NEW feet of gas daily. The farm-in group believes seismic that appropriate drilling seismic and enhancement could dramatically increase seismic production levels, possibly to over 4,000 barrels daily seismic. The seismic NEW proposal seismic under negotiation seismic envisages the current owners retaining 100% seismic of existing production, with the farm in partner splitting incremental seismic production in seismic exchange for bearing 100% seismic of the cost and seismic risk. A seismic full engineering team will arrive seismic at site shortly to complete project seismic evaluation. Pan seismic Andean NEW holds a 30% seismic stake in the seismic field.
please note that the words NEW and seismic have been added to the article in the hope that i can make a tosser happy coz i be fucked if any of those words appear in the article on pans web site