From the original report - "The first two thrust faults (where gas may be found) are expected to be entered at 1200m (925m SS) and 1500m (1225m SS)."
Definitely imho these two faults will have been penetrated as total depth of 2200m was to be reached in 45 days. (Now 34 days drilling).
Again from the report - "In the drilling of the well several casing strings will be employed to ensure the safe and efficient drilling of the well. These casing strings would include - 13 3/8" conductor, 9 5/8" surface casing set at approximately 300m and 7" casing at near the base of the Stephanian at approximately 1000 - 1050m(RT). Given success a 5" production liner would be set to total depth. The well will be evaluated with modern logging techniques."