ken: on 30 July 2004 AB said that "In addition to the Campo Rico Structure, technical work on the Campo Rico Block has to date established a further three prospects - Cimmaron Sur (later renamed Vigia) and two smaller prospects". He estimated "Vigia" at 11 million barrels recoverable, and the two smaller ones 5 million barrels recoverable between them, at that time. That made a total of four prospects, based on the 2D 'patchwork' seismic. The figure of 11 mbo for Vigia seems a bit low to me, but time will tell... bob