The following table lists planned and unplanned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

Phillips 66 (PSX) on July 15 reported a process upset on unspecified equipment in Area C of its joint-venture refinery in Borger, Texas. Emissions lasting about four hours were routed to a safety flare, a filing to local environmental regulators said. A company representative wasn't immediately available to comment. Phillips owns 50% of the refinery and is the operator. Cenovus Energy (CVE) owns the other half of the refinery and supplies heavy crude oil to the refinery from Canada.

Production problems reported at Irving Oil's Saint John Refinery in New Brunswick, Canada, by New York Harbor-based traders and brokers. The refiner, usually a net exporter of RBOB and PBOB, has been a buyer of those products in the N.Y. Harbor spot market since July 8, sources said on July 15. Irving Oil hasn't responded to requests for comment.

Phillips 66 on July 15 said planned maintenance is under way at its Bayway Refinery in Linden, N.J. The company wouldn't comment on scope of the work or the unit, or units, involved.

Philadelphia Energy Solutions, or PES, (CG, ETP) last week shut an alkylation unit at its 330,000-barrel-a-day Philadelphia Refinery for seven to 10 days of maintenance, traders and brokers doing business with the company said on July 15. It wasn't clear whether the work had been planned.

The Korean National Oil Co.'s 115,000-barrel-a-day Come-by-Chance refinery in Newfoundland and Labrador, Canada, was forced to reduce production following a sulfur-recovery unit shutdown last week, a New York Harbor-based broker said on July 15.

Valero Energy Corp. (VLO) on July 15 said a key gasoline-making fluid catalytic cracking unit and an alkylation unit at its 135,000-barrel-a-day Los Angeles-area refinery in Wilmington, Calif., were in restart. Both units tripped offline on July 14 due to an issue with a wet gas compressor, Valero spokesman Bill Day said.

BP-Husky (BP, BP.LN, HSE.T) started planned work at the smaller of two coker units at its Toledo Refinery, located in Oregon, Ohio, on July 8, a person familiar with operations at the plant said July 10. It wasn't immediately known how long it will take to overhaul the 7,500-barrel-a-day unit. A 27,500-barrel-a-day coker unit continues to operate, the person said.

Valero Energy said the FCC at its Port Arthur, Texas, refinery will begin a shutdown July 11 so work can take place to address recent outages.

A small crude distillation unit was taken down for planned repairs at BP PLC's (BP) Whiting, Ind., refinery, a person familiar with the refinery's operation said July 11.

Motiva LLC's Port Arthur, Texas, refinery shut down one of its units due to an operational issue, a spokesman for Royal Dutch Shell Plc. (RDSA) said on July 11. The planned shutdown initiated July 10 was performed safely, spokesman Kimberly Windon said.

Valero Energy said July 10 the process of starting a newly constructed hydrocracker at its St. Charles Refinery in Norco, La., is under way. The construction of the 57,000-barrel-a-day unit, which began in the fourth quarter of 2012, was completed by the end of June. The start-up procedures will progress over the next several days.

For more detailed information, search Dow Jones Newswires using the code N/REF.

 
Operator   Refinery    Capacity   Description                    Restart 
                       (in 000s 
                       bbl/day) 
UNPLANNED 
 
CANADA 
 
Irving   Saint John    300.0  Production problem cut gaso- 
Oil                           line production, traders and 
                              brokers said on July 15. 
 
KNOC     New Bruns-    115.0  Output cut due to sulfur re- 
         wick                 covery unit problem in July 
                              7 week. 
 
 
CARIBBEAN 
 
EAST COAST 
 
PES      Philadelphia  330.0  Alkylation unit shut in July 7 
                              week for seven to 10 days of 
                              maintenance, sources said on 
                              July 15. 
 
GULF COAST 
 
Phillips Borger, TX    146.0  Process upset on unspecified 
66                            equipment in Area C of its 
                              joint-venture refinery. Phillips 
                              owns 50% of the refinery and is 
                              the operator. Cenovus Energy 
                              (CVE) owns the other half. 
 
Valero   Port Arthur,  310.0  FCCU-1241 in circulation the co. 
Energy   TX                   said on July 9. The same unit 
                              experienced an upset on July 7. 
                              The unit's return to normal 
                              operation is not known. 
 
                              Upsets at SRU, SCOT units 1 
                              and 2 and two tail gas incin- 
                              erators on July 7 had no 
                              material impact to production 
                              the company said on July 8. 
 
Motiva   Port Arthur   600    Unit taken down for operational 
         TX                   issues July 10. 
 
MIDWEST 
 
ROCKIES 
 
WEST COAST 
 
Valero   Wilmington,   135.0  FCCU and alkylation unit restart 
Energy   CA                   on July 15 after tripping offline 
                              the day before, the co. said. 
 
 
 
PLANNED 
 
CANADA 
 
CARIBBEAN 
 
Valero   Aruba                Refinery will be converted to a 
                              terminal while the company con- 
                              tinues to seek a buyer. 
 
EAST COAST 
 
PBF      Delaware     182.2   Work will be done on fluid coker   4Q 
Energy   City, DE             during the 4Q 2013.                2013 
 
         Paulsboro,   160.0   Crude unit maintenance in 4Q       4Q 
         NJ                   2013.                              2013 
 
Phillips Linden,      238.0  Unspecified planned maintenance 
66       NJ                  is under way the company said on 
                             July 15. 
 
 
GULF COAST 
 
Valero   Norco, LA     270.0  Newly-constructed hydrocracker 
Energy                        in start-up the co. said on 
                              July 10. It take several days 
                              to complete. 
 
MIDWEST 
 
BP       Whiting, IN   336.0  Small CDU taken down for planned 
                              work July 10. 
 
BP-      Toledo, OH    160.0  Planned maintenance under way 
Husky                         at smaller of two coker units. 
                              since July 8. Duration of work 
                              not known. 
 
Husky    Lima, OH      160.0  45 days of major turnaround 
                              scheduled in 2014; 70% of units 
                              involved. Remaining 30% will 
                              undergo major turnaround in 2015, 
                              the company said Feb. 9. 
 
Northern St. Paul Pk    84.5  FCCU maintenance is planned in 
Tier     MN                   October for most of the month. 
 
ROCKIES 
 
WEST COAST 
 
Alon     Bakersfield    94.0  Company purchasing asphalt to 
Calif.   Long Beach           supply 2013 asphalt season. Re- 
Complex  Paramount            fining complex operations still 
         CA                   suspended. Seeking permit to build 
                              rail line to supply midcontinent 
                              crude, the company said on March 8. 
 
Exxon    Torrance,     155.0  Reported possible flaring due to 
Mobil    CA                   planned work on July 1. No production 
                              impact expected. 
 
Tesoro   Carson, CA    266.0  Flare event, not associated with 
Corp.                         equipment breakdown will occur 
                              for 24 hours starting at 6 a.m. 
                              PDT on July 10. 
 

Subscribe to WSJ: http://online.wsj.com?mod=djnwires

Sunoco Logistics Partners L.P. (NYSE:ETP)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Sunoco Logistics Partners L.P. Charts.
Sunoco Logistics Partners L.P. (NYSE:ETP)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Sunoco Logistics Partners L.P. Charts.