UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
 

 
FORM 8-K
 

 
CURRENT REPORT
 
PURSUANT TO SECTION 13 OR 15(d) OF THE
SECURITIES EXCHANGE ACT OF 1934
 
DATE OF REPORT (Date of earliest event reported): April 15, 2015
 

 Ensco plc
(Exact name of registrant as specified in its charter)
 

 
England and Wales
1-8097
98-0635229
(State or other jurisdiction of incorporation)
(Commission File Number)
(I.R.S. Employer Identification No.)
 
6 Chesterfield Gardens
London, England W1J 5BQ
(Address of Principal Executive Offices and Zip Code)
 
Registrant’s telephone number, including area code: 44 (0) 20 7659 4660
 
Not Applicable
(Former name or former address, if changed since last report)
 
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

o
Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
o
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
o
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
o
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))









TABLE OF CONTENTS

 
 
INFORMATION TO BE INCLUDED IN THE REPORT
Item 7.01 Regulation FD Disclosure
Item 9.01 Financial Statements and Exhibits
SIGNATURE
EXHIBIT INDEX
Fleet Status Report as of April 15, 2015
 



2




INFORMATION TO BE INCLUDED IN THE REPORT
 
Item 7.01
Regulation FD Disclosure
 
The Fleet Status Report of Ensco plc as of April 15, 2015 is furnished as Exhibit 99.1 to this report.
 
The information furnished in Item 7.01 and in Exhibit 99.1 shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or incorporated by reference in any of the Company’s filings under the Securities Act of 1933, as amended, or the Exchange Act.

Item 9.01
Financial Statements and Exhibits

(d)
Exhibits

Exhibit
No.
Description
99.1

Fleet Status Report of Ensco plc as of April 15, 2015.


3




SIGNATURE
 
Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.


 
Ensco plc
 
 
Date: April 15, 2015
/s/ ROBERT W. EDWARDS, III
 
Robert W. Edwards, III
 
Controller



4




EXHIBIT INDEX

 
Exhibit No.
Description
 
 
99.1
Fleet Status Report of Ensco plc as of April 15, 2015.




5


Exhibit 99.1

    




 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Floaters
 
 
 
 
 
 
 
 
 
 
 
 
 
 
North & South America (excluding Brazil)
 
 
ENSCO DS-3
 
Drillship, DP3 Samsung
 
10000/12000
 
BP
 
High 480s
 
U.S. Gulf of Mexico
 
Jun. 16
 
Zero rate for 8 days in 1Q15. Plus cost adjustments
ENSCO DS-4
 
Drillship, DP3 Samsung
 
10000/12000
 
BP
 
Low 560s
 
U.S. Gulf of Mexico
 
Jul. 15
 
As disclosed in 30 Mar. 2015 Form 8-K filing, customer has delivered notice of early termination and is required to make a lump sum payment shortly after projected termination date of Jul. 2015. Zero rate for 12 days in 1Q15. Plus cost adjustments
ENSCO DS-5
 
Drillship, DP3 Samsung
 
10000/12000
 
Petrobras
 
Mid 430s
 
U.S. Gulf of Mexico
 
Jul. 16
 
Eligible for bonus opportunity up to 17%, plus cost adjustments
ENSCO 8500
 
Semisubmersible DP
 
8500/10000
 
Anadarko/Eni
 
Low 310s
 
U.S. Gulf of Mexico
 
Sep. 15
 
Plus cost adjustments -----
ENSCO 8501
 
Semisubmersible DP
 
8500/10000
 
Cold Stacking Preparations
 
 
 
U.S. Gulf of Mexico
 
 
 
 
ENSCO 8502
 
Semisubmersible DP
 
8500/10000
 
Cold Stacking Preparations
 
 
 
U.S. Gulf of Mexico
 
 
 
 
ENSCO 8503
 
Semisubmersible DP
 
8500/10000
 
-----Talos/      Stone Energy
 
Private/Low 350s
 
U.S. Gulf of Mexico
 
3Q17
 
Completing Talos contract initially with ENSCO 8502 under amended terms. Then to Stone Energy mid May 15 to 3Q17, low 350s. Panned upgrade and inspection for approx. 60 days in 3Q/4Q15. Plus four 90-day options
ENSCO 8505
 
Semisubmersible DP
 
8500/10000
 
Deep Gulf Energy
 
Mid 370s
 
U.S. Gulf of Mexico
 
May 15
 
 
ENSCO 8506
 
Semisubmersible DP
 
8500/10000
 
Anadarko
 
Low 540s
 
U.S. Gulf of Mexico
 
Jul. 15
 
Plus cost adjustments


Page 1 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Floaters
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Brazil
 
 
ENSCO 6001
 
Semisubmersible - DP Megathyst
 
5600
 
Petrobras
 
Mid 350s
 
Brazil
 
Jun. 18
 
Zero rate for 12 days in 1Q15. Plus approx. $20,000 per day amortized through Jun. 18 for capital upgrades. Plus cost adjustments
ENSCO 6002
 
Semisubmersible - DP Megathyst
 
5600
 
Petrobras
 
Mid 350s
 
Brazil
 
Ju1. 18
 
Mid 160s average rate during planned shipyard upgrade for approx. 40 days in 2Q15 and approx. 46 days in 3Q15. Plus approx. $23,000 per day amortized Aug. 15 to Jul. 18 for capital upgrades. Plus cost adjustments
ENSCO 6003
 
Semisubmersible - DP Megathyst
 
5600
 
Petrobras
 
Mid 310s
 
Brazil
 
Jan. 17
 
Eligible for bonus opportunity up to 15%, plus cost adjustments
ENSCO 6004
 
Semisubmersible - DP Megathyst
 
5600
 
Petrobras
 
Mid 310s
 
Brazil
 
Oct. 16
 
Eligible for bonus opportunity up to 15%, plus cost adjustments

Page 2 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Floaters
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Europe & Mediterranean
 
 
 
 
 
 
 
 
 
 
ENSCO 5004
 
Semisubmersible - Conv F & G Enhanced Pacesetter
 
1500
 
Mellitah
 
High 290s
 
Mediterranean
 
Jan. 17
 
Zero rate for 15 days in 1Q15. Plus approx. $30,000 per day for mobilization and reimbursable upgrades amortized through Jan. 17
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Africa
 
 
ENSCO DS-1
 
Drillship - DP Gusto 10,000
 
6000/10000
 
TOTAL
 
Mid 360s
 
Angola
 
Jan. 16
 
Plus cost adjustments and unpriced options. Eligible for bonus opportunity up to 5%
ENSCO DS-6
 
Drillship, DP3 Samsung
 
10000/12000
 
BP
 
High 540s
 
Angola
 
Feb. 18
 
Zero rate for 8 days in 1Q15. Plus approx. $102,000 per day amortized through Feb. 18 for special day rate ahead of mobilization, upgrade costs and reimbursable mobilization expenses. Plus cost adjustments and two 1-year options at mutually agreed rates
ENSCO DS-7
 
Drillship, DP3 Samsung
 
10000/12000
 
TOTAL
 
Mid 630s
 
Angola
 
Nov. 16
 
Plus periodic rate increases resulting in high 640s average rate over contract. Plus approx. $28,000 per day amortized through Nov. 16 for mobilization

Page 3 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Floaters
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Asia & Pacific Rim
 
 
ENSCO 8504
 
Semisubmersible DP
 
8500/10000
 
Shell/Inpex
 
Mid 560s
 
Malaysia
 
May 15
 
Assigned to Inpex in Malaysia Nov. 14 to Apr. 15. Plus cost adjustments. Plus approx. $8,000 per day for mobilization amortized through Apr. 15
ENSCO 5006
 
Semisubmersible - Conv Bingo 8,000
 
7000/7500
 
Inpex
 
Mid 470s
 
Australia
 
May 18
 
Zero rate for 12 days in 1Q15. -----. Plus approx. $220,000 per day amortized through May 18 for capital upgrades and day rates during shipyard stay and mobilizations
ENSCO 5005
 
Semisubmersible - Conv F & G Enhanced Pacesetter
 
1500/1700
 
PTTEP
 
Low 230s
 
Myanmar
 
Jun. 15
 
Plus approx. $11,000 per day for upgrade costs and mobilization amortized through May 15
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Under Construction
 
 
ENSCO DS-8
 
Drillship, DP3 Samsung GF12000
 
10000/12000
 
Under construction/ Contracted
 
 
 
South Korea
 
4Q20
 
Contracted to Total in Angola from 4Q15 to 4Q20, initially low 600s. Plus periodic rate increases resulting in high 630s average rate over drilling program. Plus approx. $15,000 per day amortized over primary contract term for capital upgrades. Plus mob fee of approx. $26 million to be amortized over primary contract term. Plus one 1-year priced option
ENSCO DS-9
 
Drillship, DP3 Samsung GF12000
 
10000/12000
 
Under construction/ Contracted
 
 
 
South Korea
 
4Q18
 
Contracted to ConocoPhillips in U.S. Gulf of Mexico from 4Q15 to 4Q18, low 550s. Plus mob fee of approx. $32 million to be amortized over primary contract term. Plus cost adjustments and two 1-year unpriced options
ENSCO DS-10
 
Drillship, DP3 Samsung GF12000
 
10000/12000
 
Under construction 
 
 
 
South Korea
 
3Q15
 
 

(1) For rigs that may be modified to drill in deeper water depths, both the currently outfitted and maximum upgrade capabilities are shown.
(2) Estimated available date for rig after current and follow-on contracts (excluding option period) and shipyard stays have been completed. For newbuild rigs without a contract, the estimated available date is the
expected delivery date from the shipyard.

Page 4 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
North & South America (excluding Brazil)
 
 
U.S. Gulf of Mexico
 
 
ENSCO 68
 
MLT 84-CE
  
400
 
Chevron
 
High 110s
 
Gulf of Mexico
 
Oct. 15
 
Planned inspection and maintenance for approx. 28 days in 3Q15. Day rate does not include certain extra reimbursable costs
ENSCO 75
 
MLT Super 116-C 
  
400
 
Talos
 
Private
 
Gulf of Mexico 
 
Jul. 15
 
-----
ENSCO 81
 
MLT 116-C 
 
350
 
Cold Stacking Preparations
 
 
 
Gulf of Mexico
 
 
 
 
ENSCO 82
 
MLT 116-C 
  
300
 
Cold Stacking Preparations
 
 
 
Gulf of Mexico 
 
 
 
 
ENSCO 86
 
MLT 82 SD-C
  
250
 
Century
 
Mid 70s
 
Gulf of Mexico
 
May 15
 
 
ENSCO 87
 
MLT 116-C
  
350
 
Arena
 
Mid 70s
 
Gulf of Mexico
 
Jun. 15
 
 
ENSCO 99
 
MLT 82 SD-C
  
250
 
Cold Stacking Preparations
 
 
 
Gulf of Mexico
 
 
 
 

Page 5 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Europe
 
 
ENSCO 70
 
Hitachi K1032N
 
250
 
 
 
 
 
UK
 
 
 
 
ENSCO 71
 
Hitachi K1032N
 
225
 
Maersk
 
Low 170s
 
Denmark
 
Jun. 15
 
Planned inspection for approx. 23 days in 3Q15. Plus one 1-year priced option and one 1-year option at mutually agreed rate
ENSCO 72
 
Hitachi K1025N
 
225
 
Maersk
 
Low 170s
 
Denmark
 
Sep. 15
 
Plus one 1-year priced option and one 1-year option at mutually agreed rate
ENSCO 80
 
MLT 116-CE
 
225
 
GDF
 
Mid 140s
 
UK
 
Apr. 17
 
Plus cost adjustments and unpriced option
ENSCO 92
 
MLT 116-C
 
225
 
ConocoPhillips
 
Low 110s/Low 150s
 
UK
 
Aug. 18
 
Special workover rate Apr. 15 to Jan. 16, low 110s. Then low 150s Jan. 16 to Aug. 18
ENSCO 100
 
MLT 150-88-C
 
350
 
Ithaca/ Suncor/Premier
 
Mid 160s/Mid 180s
 
UK
 
Jun. 18
 
Plus cost adjustments. Then planned inspection for approx. 30 days in 2Q15. Next assigned to Suncor in UK mid May 15 to mid Jun. 15, mid 180s. Then to Premier mid Jun. 15 to Jun. 18, mid 180s
ENSCO 101
 
KFELS MOD V-A
 
400
 
BP
 
High 210s
 
UK
 
Jan. 16
 
Inspection for 57 days in 1Q15. Plus cost adjustments and two 6-month unpriced options
ENSCO 102
 
KFELS MOD V-A
 
400
 
ConocoPhillips
 
Low 210s/Low 170s
 
UK
 
Jun. 15
 
Plus cost adjustments. Accommodation work late May 15 to mid Jun. 15, low 170s
ENSCO 120
 
ENSCO 120 Series
 
400
 
Nexen
 
Mid 230s
 
UK
 
May 16
 
Zero rate for approx. 12 days in 2Q15. Plus approx. $13,000 per day for mobilization amortized through Nov. 15. Plus cost adjustments and eleven 1-well options
ENSCO 121
 
ENSCO 120 Series
 
400
 
Wintershall
 
Low 230s
 
Netherlands
 
Jun. 16
 
Plus approx. $11,000 per day for mobilization amortized through Jun. 16. Plus one 1-year unpriced option
ENSCO 122
 
ENSCO 120 Series
 
400
 
NAM
 
Low 230s
 
-----Netherlands
 
Nov. 16
 
Plus approx. $14,000 per day for mobilization amortized through Nov. 16. Plus cost adjustments and two 1-year unpriced options

Page 6 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Middle East
 
 
ENSCO 53
 
F&G L-780 Mod II-C
 
300
 
NDC
 
Low 100s
 
UAE
 
Feb. 16
 
Plus two 1-year unpriced options
ENSCO 54
 
F&G L-780 Mod II-C
 
300
 
Saudi Aramco
 
Low 90s/Mid 110s
 
Saudi Arabia
 
Sep. 17
 
Revised operating rate Apr. 15 to Jan. 16, low 90s. Then mid 110s Jan. 16 to Sep. 17. Plus approx. $39,000 per day for upgrade costs and mobilization amortized through Sep. 17. Plus one 1-year priced option
ENSCO 76
 
MLT Super 116-C
 
350
 
Saudi Aramco
 
Mid 120s
 
Saudi Arabia
 
Dec. 18
 
Inspection for 30 days in 1Q15. Revised operating rate Apr. 15 to Jan. 16, mid 120s. Rate increases Jan. 16 to low 170s
ENSCO 84
 
MLT 82 SD-C
 
250
 
Saudi Aramco
 
High 60s/Mid 70s
 
Saudi Arabia
 
Mar. 19
 
Revised operating rate Apr. 15 to Jan. 16, high 60s. Planned inspection for approx. 32 days in 3Q15. Then mid 70s Jan. 16 to Mar. 16. Rate increases Mar. 16 to mid 120s
ENSCO 88
 
MLT 82 SD-C
 
250
 
Saudi Aramco
 
Mid 80s/Low 100s
 
Saudi Arabia
 
Nov. 16
 
Plus one 1-year priced option
ENSCO 91
 
Hitachi Zosen Drill Hope C-150
 
270
 
-----Cold Stacking Preparations
 
-----
 
Saudi Arabia
 
-----
 
-----
ENSCO 94
 
Hitachi 250-C
 
250
 
Saudi Aramco
 
Mid 80s/Low 100s
 
Saudi Arabia
 
May 16
 
Revised operating rate Apr. 15 to Jan. 16, mid 80s. Then low 100s Jan. 16 to May 16. Plus one 1-year priced option
ENSCO 96
 
Hitachi 250-C
 
250
 
Saudi Aramco
 
High 60s/Mid 70s
 
Saudi Arabia
 
Feb. 19
 
Revised operating rate Apr. 15 to Jan. 16, high 60s. Then mid 70s Jan. 16 to Feb. 16. Rate increases Feb. 16 to mid 120s
ENSCO 97
 
MLT 82 SD-C
 
250
 
Saudi Aramco
 
High 60s/Mid 70s
 
Saudi Arabia
 
Feb. 19
 
Revised operating rate Apr. 15 to Jan. 16, high 60s. Then mid 70s early Jan. 16 to late Jan. 16. Rate increases late Jan. 16 to mid 120s
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Africa
 
 
ENSCO 109
 
KFELS MOD V-Super B
 
350
 
Chevron
 
Low 170s
 
Angola
 
Jan. 18
 
Plus $13,000 per day for mobilization amortized through Jan. 18. Plus cost adjustments

Page 7 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Asia & Pacific Rim
 
 
ENSCO 52
 
F&G L-780 Mod II-C
 
300
 
Murphy
 
High 90s
 
Malaysia
 
Aug. 17
 
Plus cost adjustments and one 1-year unpriced option
ENSCO 56
 
F&G L-780 Mod II-C
 
300
 
Pertamina
 
Mid 110s
 
Indonesia
 
Jun. 15
 
Plus approx. $4,000 per day for mobilization amortized through May 15
ENSCO 67
 
MLT 84-CE
 
400
 
Pertamina
 
Mid 130s
 
Indonesia
 
Jun. 15
 
 
ENSCO 104
 
KFELS MOD V-B
 
400
 
-----
 
-----
 
-----Singapore
 
Apr. 15
 
-----
ENSCO 105
 
KFELS MOD V-B
 
400
 
Shell
 
High 190s
 
China
 
Jun. 15
 
Plus approx. $12,000 per day for capital upgrades amortized through Jun. 15
ENSCO 106
 
KFELS MOD V-B
 
400
 
CPOC
 
Mid 150s
 
Malaysia
 
Aug. 15
 
Plus cost adjustments and ----- approx. $5,000 per day for mobilization amortized through Aug. 15
ENSCO 107
 
KFELS MOD V-B
 
400
 
OMV
 
Mid 230s
 
New Zealand
 
Jul. 15
 
Plus approx. $62,000 per day for contract preparations and mobilization to be amortized through Feb. 15. Plus cost adjustments
ENSCO 108
 
KFELS MOD V-B
 
400
 
PTTEP
 
Low 160s
 
Thailand
 
Apr. 17
 
Plus cost adjustments and one 1-year priced option

Page 8 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Under Construction
 
 
ENSCO 140
 
ENSCO 140 Series
 
340/400
 
Under construction
 
 
 
UAE
 
2Q16
 
 
ENSCO 141
 
ENSCO 140 Series
 
340/400
 
Under construction
 
 
 
UAE
 
3Q16
 
 
ENSCO 123
 
ENSCO 120 Series
 
400
 
Under construction
 
 
 
Singapore
 
2Q16
 
 
ENSCO 110
 
KFELS MOD V-B
 
400
 
Completing Mobilization
 
 
 
Middle East
 
Apr. 15
 
 
 
 
 
Other
 
 
Drilling Management
 
 
Thunder Horse
 
Deepwater Semisubmersible
 
6000
 
BP
 
Low 100s
 
U.S. Gulf of Mexico
 
Jan. 16
 
Plus one 1-year priced options, plus cost adjustments
Mad Dog
 
Deepwater Spar Drilling Rig
 
4500
 
BP
 
Mid 60s
 
U.S. Gulf of Mexico
 
Jan. 16
 
Plus cost adjustments
ENSCO 83
 
MLT 82 SD-C
 
250
 
Pemex
 
Low 90s
 
Mexico
 
Oct. 16
 
Planned inspection for approx. 14 days in 2Q15
ENSCO 89
 
MLT 82 SD-C
 
250
 
Pemex
 
Low 90s
 
Mexico
 
Nov. 15
 
Planned inspection for approx. 14 days in 4Q15
ENSCO 98
 
MLT 82 SD-C
 
250
 
Pemex
 
Low 90s
 
Mexico
 
Aug. 15
 
Planned inspection for approx. 14 days in 3Q15

(1) For rigs that may be modified to drill in deeper water depths, both the currently outfitted and maximum upgrade capabilities are shown.
(2) Estimated available date for rig after current and follow-on contracts (excluding option period) and shipyard stays have been completed. For newbuild rigs without a contract, the estimated available date is the
expected delivery date from the shipyard.



Page 9 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Discontinued Operations
 
 
ENSCO 93
 
MLT 82 SD-C
 
250
 
Pemex
 
Low 90s
 
Mexico
 
Jun. 15
 
Planned inspection for approx. 14 days in 2Q15
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Held for Sale
 
 
ENSCO 7500
 
Semisubmersible DP
 
7500/8000
 
Cold Stacked
 
 
 
Spain
 
 
 
 
ENSCO DS-2
 
Drillship - DP Gusto 10,000
 
6000/10000
 
Cold Stacked
 
 
 
Spain
 
 
 
 
ENSCO 6000
 
Semisubmersible - DP Amethyst
 
3400/4000
 
Cold Stacked
 
 
 
Spain
 
 
 
 
ENSCO 5002
 
Semisubmersible - Conv Aker H-3
 
1000/3000
 
Cold Stacked
 
 
 
Singapore
 
 
 
 
ENSCO 5001
 
Semisubmersible - Conv Sonat
 
6500
 
-----Cold Stacking Preparations
 
 
 
Malaysia
 
 
 
-----
ENSCO 90
 
MLT 82 SD-C 
 
250
 
Cold Stacked
 
 
 
Gulf of Mexico
 
 
 
 
ENSCO 58
 
F&G L-780 Mod II
 
250
 
Cold Stacked
 
 
 
Saudi Arabia
 
 
 
 

(1) For rigs that may be modified to drill in deeper water depths, both the currently outfitted and maximum upgrade capabilities are shown.
(2) Estimated available date for rig after current and follow-on contracts (excluding option period) and shipyard stays have been completed. For newbuild rigs without a contract, the estimated available date is the
expected delivery date from the shipyard.

Page 10 of 11


 
 
Ensco plc
Fleet Status Report
15 April 2015
 
 
 
 
Definitions and Disclaimers
 
Day Rate and Terms. The day rates reflected in this Fleet Status Report are the operating day rates charged to customers, which may include estimated contractual adjustments for changes in operating costs and/or reimbursable cost adjustments for ongoing expenses such as crew, catering, insurance and taxes. The day rates, however, do not include certain types of non-recurring revenues such as lump sum mobilization payments, revenues earned during mobilizations, revenues associated with contract preparation and other non-recurring reimbursable items such as mobilizations and capital enhancements, and the impact of the fair market value adjustments to previously acquired drilling contracts. Routine and non-routine downtime may reduce the actual revenues recognized during the contract term. Additionally, we sometimes negotiate special rates and/or day rate adjustments with customers that may reduce revenues recognized. Significant zero rate estimates are reflected in the comments section for the remainder of 2015.
 
Forward Looking Statement. Statements contained in this Fleet Status Report that are not historical facts are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements include words or phrases such as “anticipate,” “believe,” “estimate,” “expect,” “intend,” “plan,” “project,” “could,” “may,” “might,” “should,” “will” and similar words and specifically include statements involving future rig day rates including adjustments with the customer; backlog; cost adjustments; utilization; estimated rig availability; contract duration, status, terms and other contract commitments; customers; rig enhancement projects; new rig commitments; the expected period of time and number of rigs that will be in a shipyard for repairs, maintenance, enhancement or construction; sale leaseback transactions; scheduled delivery dates for new rigs; and the timing of delivery, mobilization, contract commencement, relocation or other movement of rigs. Such statements are subject to numerous risks, uncertainties and assumptions that may cause actual results to vary materially from those indicated, including commodity price fluctuations, customer demand, new rig supply, downtime and other risks associated with offshore rig operations, relocations, severe weather or hurricanes; changes in worldwide rig supply and demand, competition and technology; future levels of offshore drilling activity; governmental action, civil unrest and political and economic uncertainties; terrorism, piracy and military action; risks inherent to shipyard rig construction, repair, maintenance or enhancement; possible cancellation, suspension or termination of drilling contracts as a result of mechanical difficulties, performance, customer finances, the decline or the perceived risk of a further decline in oil and/or natural gas prices, or other reasons, including terminations for convenience (without cause); the outcome of litigation, legal proceedings, investigations or other claims or contract disputes; governmental regulatory, legislative and permitting requirements affecting drilling operations; our ability to attract and retain skilled personnel on commercially reasonable terms; environmental or other liabilities, risks or losses; debt restrictions that may limit our liquidity and flexibility; our ability to realize the expected benefits from our redomestication and actual contract commencement dates; cybersecurity risks and threats; and the occurrence or threat of epidemic or pandemic diseases or any governmental response to such occurrence or threat. In addition to the numerous factors described above, you should also carefully read and consider “Item 1A. Risk Factors” in Part I and “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II of our most recent annual report on Form 10-K, as updated in our subsequent quarterly reports on Form 10-Q, which are available on the SEC’s website at www.sec.gov or on the Investor Relations section of our website at www.enscoplc.com.  Each forward-looking statement contained herein speaks only as of the date of this Fleet Status Report, and we undertake no obligation to publicly update or revise any forward looking statements, except as required by law.

Page 11 of 11
Ensco (NYSE:ESV)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Ensco Charts.
Ensco (NYSE:ESV)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Ensco Charts.