The following table lists planned and unplanned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

Motiva Enterprises LLC on June 6 said planned maintenance on a delayed coker unit's gas recovery system at its Port Arthur, Texas, refinery under way since June 3 resulted in flaring. A filing to environmental regulators made available on June 5 didn't specify whether the work was planned or unplanned. It did say operations were slowed to stabilize the unit and to minimize flaring. The current status of operations isn't clear.

CVR Refining LP said unplanned sulfur recovery unit maintenance on June 5 at its Wynnewood, Okla., Refinery resulted in flaring an emission of hydrogen sulfide, according to a filing to the U.S. National Response Center. The report didn't specify whether the work was impacting production at the 70,000-barrels-a-day refinery.

Tesoro Corp. (TSO) on June 2 reported the start-up of a H2SO4 Plant at its Golden Eagle Refinery in Martinez, Calif. to state environmental regulators. It wasn't clear when the unit was taken out of service or whether it had an impact to production.

Valero Energy Corp. (VLO) on June 3 said some units at its Jean Gaulin refinery in Quebec, Canada, have begun the restart process following nine weeks of plant-wide turnaround maintenance. It will be another several days before the refinery is back at planned rates.

CHS Inc.'s (CHSCP) oil refinery in Laurel, Montana, has been undergoing major turnaround maintenance since earlier this spring, a report on June 2 in the local Billings Gazette newspaper said. The scope of the turnaround wasn't detailed but information submitted to the Department of Environmental Quality said the project involves major renovations to several processing units and that the project will enable the refinery to refine a higher percentage of diesel fuel and a lower percentage of gasoline, the Gazette story said.

Exxon Mobil Corp. (XOM) on May 30 said its Torrance, Calif., refinery was working to normalize operations following a disruption in power supplied to the refinery by an external provider. The incident resulted in emissions and unplanned flaring. The status of operations at the plant wasn't clear since the company in early-May said the refinery would conduct "several weeks" of planned maintenance at several process units.

For more detailed information, search Dow Jones Newswires using the code N/REF.

 
Operator   Refinery    Capacity   Description                    Restart 
                       (in 000s 
                       bbl/day) 
UNPLANNED 
 
CANADA 
 
CARIBBEAN 
 
EAST COAST 
 
 
GULF COAST 
 
Phillips Sweeny,       247.0  Unit 35, an aromatics unit, shut 
66       TX                   on May 29 due to a furnace pro- 
                              blem. 
 
MIDWEST 
 
CVR      Wynnewood      77.0  Unplanned SRU maintenance on 
Refining OK                   June 5 results in emission of 
                              hydrogen sulfide and flaring. 
                              Impact to production not known. 
 
Holly    El Dorado,KS  135.0  Problems in FCCU will result in    May 25 
Frontier Cheyenne, WY         about 10 days of down time, the 
                              company said May 15. 
 
Phillips  Roxana,      328.0  Process leak at hydrocracker unit 
66        IL                  reported to state regulators on 
                              May 28. Status of operations un- 
                              clear. 
 
ROCKIES 
 
WEST COAST 
 
Exxon    Torrance      150.0  Refinery normalizing operations 
Mobil    CA                   on May 30 after a power interrup- 
                              tion the same day. (The plant is 
                              under going planned maintenance.) 
 
Tesoso   Martinez,     166.0  Major process unit restarted on 
Corp.    CA                   May 25. Not clear if the restart 
                              was associated with May 16 par- 
                              tial, brief power outage. Four 
                              major units affected then were 
                              in restart on May 17. 
 
 
PLANNED 
 
CANADA 
 
Husky    Saskatchewan         Major turnaround to take place     Spring 
Energy                        in spring of 2013. Plant-wide      2013 
                              shutdown is planned for in- 
                              spection and equipment repairs. 
 
Valero   Quebec        100.0  Refinery begins restart on June    June 3 
Energy                        3 following nine weeks of plant- 
                              wide turnaround maintenance, the 
                              co. said. It will be another 
                              several days for the refinery to 
                              reach planned rates. 
 
 
CARIBBEAN 
 
Valero   Aruba                Refinery will be converted to a 
                              terminal while the company con- 
                              tinues to seek a buyer. 
 
EAST COAST 
 
PBF      Delaware     182.2   Work will be done on fluid coker   4Q 
Energy   City, DE             during the 4Q 2013.                2013 
 
         Paulsboro,   160.0   Crude unit maintenance in 4Q       4Q 
         N.J.                 2013.                              2013 
 
 
GULF COAST 
 
Motiva   Norco, LA     233.5  Planed work under way at manu- 
                              facturing complex, company said 
                              on May 22. Units not specified. 
 
Motiva   Port Arthur   600.0  Planned work at DCU1 gas re- 
         TX                   covery system, under way since 
                              June 3 resulted in flaring. 
 
Valero   Sunray,       170.0  Maintenance on soot blowers under 
Energy   TX                   way, the company said on May 24. No 
                              material effect on production an- 
                              ticipated. 
 
MIDWEST 
 
BP       Whiting,      336.0  Largest of three CDUs shut for     Mid-2013 
         IN                   replacement, the company said 
                              on Oct. 31 as part of major 
                              expansion project. Completion on 
                              track for the second half of 2013. 
 
Citgo    Lemont,       167.0  Compressor back in service on May 
         IL                   29 after completion of repairs 
                              under way since May 20. 
 
Exxon    Joliet,       250.0  Planned maintenance under way, 
Mobil    IL                   the company said on April 17. All 
                              operating units are involved in 
                              this round of work. No restart 
                              estimate provided. 
 
Husky    Lima,         160.0  45 days of major turnaround 
         OH                   scheduled in 2014; 70% of units 
                              involved. Remaining 30% will 
                              undergo major turnaround in 2015, 
                              the company said Feb. 9. 
 
Northern St.Paul Pk     84.5  FCCU maintenance is planned in     October 
Tier     MN                   October for most of the month. 
 
 
ROCKIES 
 
CHS      Laurel         55.0  Refinery undergoing major turn- 
Inc.     MT                   around maintenance since earlier 
                              this spring. Completion date not 
                              known. 
 
WEST COAST 
 
Alon     Bakersfield    94.0  Company purchasing asphalt to 
Calif.   Long Beach           supply 2013 asphalt season. Re- 
Complex  Paramount            fining complex operations still 
         CA                   suspended. Seeking permit to build 
                              rail line to supply midcontinent 
                              crude, the company said on March 8. 
 
Exxon    Torrance,     155.0  Several unspecified process units 
         CA                   will be down for planned work for 
                              several weeks, the company said on 
                              May 2. 
 
Tesoro   Martinez      166.0  H2SO4 Plant restarted on June 2.   June 2 
Corp.    CA                   Unclear when the unit shutdown or 
                              whether it had an impact to pro- 
                              duction. 
 
 
 

Subscribe to WSJ: http://online.wsj.com?mod=djnwires

Alon (NYSE:ALJ)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Alon Charts.
Alon (NYSE:ALJ)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Alon Charts.