Rambler's Drills 7.50 Metres of 3.62 % Copper in Lower Footwall Drill Program at the Ming Mine (Rambler Metals)

Date : 06/18/2008 @ 2:00AM
Source : UK Regulatory (RNS and others)
Stock : Rambler Metals Plc (RMM)
Quote : 7.625  -0.5 (-6.15%) @ 10:08AM
<< BackQuote Chart

 



Rambler's Drills 7.50 Metres of 3.62 % Copper in Lower Footwall Drill Program at the Ming Mine (Rambler Metals)

    FOR:  RAMBLER METALS & MINING PLC

TSX VENTURE SYMBOL:  RAB
AIM SYMBOL:  RMM

June 18, 2008

Rambler's Drills 7.50 Metres of 3.62 % Copper in Lower Footwall Drill Program at the Ming
Mine

LONDON, ENGLAND and BAIE VERTE, NEWFOUNDLAND AND LABRADOR--(Marketwire - June 18, 2008) -
Rambler Metals and
Mining plc (TSX VENTURE:RAB)(AIM:RMM) ('Rambler') is pleased to announce further positive
drill results from
its underground exploration program drilling the Lower Footwall Zone at the Ming Mine.

Drilling highlights:

- Good progress on the underground drilling program at the Lower Footwall Zone which commenced
in November 2007

- Additional drill rig acquired on 5th June 2008 to expedite the exploration program

- Latest samples demonstrate copper grades as high as 3.74%

- Average copper grades of over 2% copper or better with gold as a valuable by-product

- Next drill results update is expected in calendar (Q3 2008)

Highlights include the following assay results:

/T/

------------------------------------------------------------
Drill Hole      Sample Length              Au            Cu
------------------------------------------------------------
RMUG08-54              6.00 m        0.12 g/t          1.95%
------------------------------------------------------------
RMUG08-55              8.00 m        0.07 g/t          2.17%
------------------------------------------------------------
RMUG08-59              7.00 m        0.10 g/t          2.14%
------------------------------------------------------------
 including             4.00 m        0.15 g/t          3.10%
------------------------------------------------------------
RMUG08-66              2.00 m        0.40 g/t          2.46%
------------------------------------------------------------
RMUG08-68              3.00 m        0.13 g/t          2.96%
------------------------------------------------------------
RMUG08-68              7.50 m        0.26 g/t          3.62%
------------------------------------------------------------
RMUG08-69              2.00 m        0.12 g/t          3.74%
------------------------------------------------------------
RMUG08-69              6.10 m        0.06 g/t          1.84%
------------------------------------------------------------
RMUG08-70              6.00 m        0.21 g/t          2.03%
------------------------------------------------------------
RMUG08-70             10.90 m        0.10 g/t          2.08%
------------------------------------------------------------
RMUG08-71              8.50 m        0.17 g/t          2.42%
------------------------------------------------------------
RMUG08-71              6.00 m        0.15 g/t          2.60%
------------------------------------------------------------
RMUG08-73            134.70 m        0.06 g/t          1.04%
------------------------------------------------------------
 including            19.00 m        0.08 g/t          1.92%
------------------------------------------------------------
RMUG08-74             16.30 m        0.10 g/t          1.54%
------------------------------------------------------------
RMUG08-74              5.10 m        0.06 g/t          1.92%
------------------------------------------------------------

/T/

Lower Footwall Zone

The underground drill delineation program is progressing well and Rambler is pleased with the
drill results to
date. The continued success of this program will have a significant impact on both the size
and grade of the
footwall resource which will in turn strengthen the economics of this already extensive zone.
Over the coming
months Rambler plans to refine the 4,000 tpd mining rate envisaged in the recently completed
scoping report
through its pre-feasibility engineering study.

Larry Pilgrim, Chief Geologist and independent consultant commented;

"We are very pleased that Rambler now has two underground drill rigs on site especially at a
time when the
mining industry is facing increased demands for such equipment. These drills are now in place,
testing both the
footwall stringer zone and the strike extension of the Ming Massive sulphide horizon. Rambler
is confident that
the results of these drill programs will continue to build on the resource estimate outlined
in the NI 43-101
Report released on June 16th 2008."

A complete listing of all drill highlights for this release can be found in Appendix 1. For
more information on
all RMM drill intersections, corresponding maps, figures and NI43-101 compliance information
please visit our
website at www.ramblermines.com.

About the Company

Rambler Metals and Mining plc ("Rambler") was established to invest in the base metal sector
in politically
stable jurisdictions. Its principal project is the Rambler copper-gold property, located on
the Baie Verte
Peninsula of Newfoundland and Labrador, Canada. Rambler acquired the property from Altius
Minerals Corporation
in exchange for ordinary shares during 2005.

The Rambler property contains the former producing Ming and Ming West copper-gold mines. The
Ming Mine last
operated in 1982 and the Ming West Mine in 1996. Mining of the Ming Mine ceased when workings
reached a
neighbouring property boundary. Rambler Metals and Mining acquired the property after it had
been successfully
consolidated.

The Ming and Ming West Mines exploited relatively narrow zones of high-grade copper and gold
mineralization.
Sections of this mineralization remain in the lower part of the Ming Mine and it is open to
depth. Rambler is
dewatering the Ming Mine concurrently with an underground drill delineation program to improve
the resource
dataset and to prepare the mine for the next phase of pre-development. The Lower Footwall Zone
is located
approximately 100 metres below and generally parallel to the historic Ming Mine workings.

Larry Pilgrim, P.Geo. is the Qualified Person responsible for the technical content of this
release and has
reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by
Rambler Metals and
Mining plc.

All tonnes are dry metric tonnes.

Drill intercepts quoted are core lengths; true widths for the Lower Footwall Zone are
estimated to be in excess
of 60-90% of the intersected core lengths. Analytical results for Rambler core are first
determined at Eastern
Analytical, Springdale, NL. Samples are then shipped by courier to Activation Laboratories
Ltd.("Actlabs'),
Ancaster Ontario, where a 34 element ICP analysis and gold fire assay are performed. The
results presented in
this release are based on assay data from Eastern Analytical and Actlabs'. ActLabs' data,
being the accredited
lab for this project, will supersede all other results.

National Instrument 43-101 compliance information regarding sampling and analytical protocols
pertaining to the
Rambler Project can be accessed via the following link: http://www.ramblermines.com.

/T/

                              Appendix 1

The table below summarizes the widths, grades and drill station of the
recent holes. All underground drill holes targeted the Lower Footwall Zone.
---------------------------------------------------------------------------
Target    Drill       Hole    From      To   Length   Length     Au     Cu
          Level                 (m)     (m)      (m)   (feet)  (g/t)    (%)
---------------------------------------------------------------------------
Lower
 Footwall  1800  RMUG08-54  147.50  149.50     2.00     6.56   0.08   2.46
                 RMUG08-54  156.50  172.40    15.90    52.17   0.10   1.46
                 including  156.50  162.50     6.00    19.69   0.12   1.95

Lower
 Footwall  1800  RMUG08-55  171.50  179.50     8.00    26.25   0.07   2.17

Lower
 Footwall  1800  RMUG08-59  175.50  182.50     7.00    22.97   0.10   2.14
                 including  175.50  179.50     4.00    13.12   0.15   3.10
                 RMUG08-59  198.00  203.00     5.00    16.40   0.07   1.93
                 RMUG08-59  248.30  250.30     2.00     6.56   0.08   1.81

Lower
 Footwall  1800  RMUG08-66   46.20   48.20     2.00     6.56   0.40   2.46
                 RMUG08-66   84.60   87.60     3.00     9.84   0.07   1.50

Lower
 Footwall  1800  RMUG08-67  109.20  121.00    11.80    38.71   0.17   1.47

Lower
 Footwall  1800  RMUG08-68  123.70  145.00    21.30    69.88   0.08   1.52
                 including  125.60  131.60     6.00    19.69   0.06   1.79
                 including  133.60  144.00    10.40    34.12   0.11   1.85
                 RMUG08-68  150.40  187.90    37.50   123.03   0.08   1.39
                 including  151.40  154.40     3.00     9.84   0.13   2.96
                 including  175.70  183.20     7.50    24.61   0.26   3.62

Lower
 Footwall  1900  RMUG08-69  117.00  119.00     2.00     6.56   0.12   3.74
                 RMUG08-69  147.30  153.40     6.10    20.01   0.06   1.84

Lower
 Footwall  1900  RMUG08-70  149.00  168.30    19.30    63.32   0.13   1.61
                 including  162.30  168.30     6.00    19.69   0.21   2.03
                 RMUG08-70  177.20  188.10    10.90    35.76   0.10   2.08

Lower
 Footwall  1900  RMUG08-71   99.40  101.10     1.70     5.58   0.24   3.66
                 RMUG08-71  120.50  133.10    12.60    41.34   0.12   1.76
                 including  121.50  130.00     8.50    27.89   0.17   2.42
                 RMUG08-71  148.60  154.60     6.00    19.69   0.15   2.60

Lower
 Footwall  1900  RMUG08-73  135.70  270.40   134.70   441.93   0.06   1.04
                 including  155.50  165.40     9.90    32.48   0.19   2.73
                 including  197.50  216.50    19.00    62.34   0.08   1.92
                 including  234.30  240.50     6.20    20.34   0.18   1.68

Lower
 Footwall  1900  RMUG08-74  174.70  191.00    16.30    53.48   0.10   1.54
                 RMUG08-74  227.50  232.60     5.10    16.73   0.06   1.92

/T/



-30-

FOR FURTHER INFORMATION PLEASE CONTACT:

Rambler Metals and Mining Canada Limited
George Ogilvie, P.Eng
President and CEO
(709) 532-4990

OR

Rambler Metals & Mining Plc
Leslie Little
Company Secretary
+44 (0) 20-7661-8104
Website: www.ramblermines.com

OR

Seymour Pierce Limited
Nandita Sahgal
+44 (0) 20-7107 8000

OR

Pelham Public Relations
Chelsea Hayes
+44 (0) 20-7743-6675

OR

Pelham Public Relations
Klara Kaczmarek
+44 (0) 20-3159-4395

The TSX-Venture Exchange does not accept responsible for the adequacy or accuracy of this
release.

								
Rambler Metals & Mining Plc



								
<< Back


Rambler Metals Plc Historical Chart Rambler Metals Plc Intraday Chart  
Period
noad


LSE and PLUS quotes are live. NYSE and AMEX quotes are delayed by at least 20 minutes.
All other quotes are delayed by at least 15 minutes unless otherwise stated.
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions :: Contact Us :: Request an Exchange :: Affiliate Scheme
Copyright1999-2008 ADVFN PLC. Copyright and limited reproduction :: Privacy Policy :: Investment Warning :: Advertise with us :: Data accreditations :: Investor Relations :: Press office :: Jobs
ADDITIONAL SERVICES AVAILABLE FROM ADVFN
Upgrade - Click here for more information on ADVFN premium services Money Words - ADVFN Financial Glossary Investor Training ADVFN Financial Bookshop Online Training Academy
30 site:2us 081123 13:51 Stock Message Boards ( 2001 | 2002 | 2003 | 2004 | 2005 | 2005 | 2007 )