Rambler?s Underground Gold Exploration Continues to Develop: Drills 5.50 metres of 2.00 g/T Gold and 7.96% Copper (Rambler Metals)

Date : 04/15/2008 @ 2:01AM
Source : UK Regulatory (RNS and others)
Stock : Rambler Metals Plc (RMM)
Quote : 7.625  -0.5 (-6.15%) @ 10:08AM
<< BackQuote Chart

 



Rambler?s Underground Gold Exploration Continues to Develop: Drills 5.50 metres of 2.00 g/T Gold and 7.96% Copper (Rambler Metals)

    FOR:  RAMBLER METALS & MINING PLC
TSX VENTURE SYMBOL:  RAB
AIM SYMBOL:  RMM
April 15, 2008
Rambler's Underground Gold Exploration Continues to Develop: Drills 5.50 metres of 2.00 g/T
Gold and 7.96%
Copper
LONDON, ENGLAND and BAIE VERTE, NEWFOUNDLAND AND LABRADOR--(Marketwire - April 15, 2008) -
Rambler Metals and
Mining plc (TSX VENTURE:RAB)(AIM: RMM) is pleased to announce drill intersections from its
underground diamond
drilling exploration program.
/T/
- RMUG08-44 returns 20.70 metres of 1.29 g/T Au with 2.22% Cu
    Including 5.50 metres of 2.00 g/T Au with 7.96% Cu
    Including 3.60 metres of 4.30 g/T Au with 0.55% Cu
- RMUG08-27 returns 2.10 metres of 2.73 g/T Au with 1.91% Cu
/T/
Gold Zone
The gold mineralization on the Rambler property is beginning to develop into a significant
portion of the
underground drill delineation program. Given the close proximity of the gold mineralization to
the existing
underground development any new gold resource that could be added would have a positive impact
on the economics
of the project. While access is limited with the current drill setup, plans have been made to
add a second,
smaller drill to the underground program which will have the ability to quickly test gold
occurrences from all
levels and any possible resource from recoverable pillars.
It is Rambler's intention to publish a NI43-101 compliant resource estimate at the end of the
month. Although,
there is not enough drilling data to include recent Au mineralization in this upcoming
NI43-101 resource
publication, Rambler expects to issue a resource update with this additional information
included by calendar
year end.
The table below summarizes the widths and grades and drill station of the recent holes.
/T/
----------------------------------------------------------------------------
Hole         From      To      Length     Length      Cu      Au       Drill
               (m)     (m)         (m)     (feet)     (%)   (g/T)      Level
----------------------------------------------------------------------------
RMUG08-25   14.40   22.40        8.00      26.25    0.02    0.68        1200
 Including  17.10   17.90        0.80       2.62    0.02    2.01
RMUG08-25   40.70   43.85        3.15      10.33    0.19    0.42        1200
 Including  41.40   41.85        0.45       1.48    1.01    1.10
RMUG08-25   47.85   52.35        4.50      14.76    0.06    0.48        1200
 Including  51.75   52.35        0.60       1.97    0.06    1.40
RMUG08-27   56.20   65.00        8.80      28.87    0.57    0.95        1200
 Including  62.90   65.00        2.10       6.89    1.91    2.73
RMUG08-44   29.80   50.50       20.70      67.91    2.22    1.29        1500
 Including  29.80   35.30        5.50      18.04    7.96    2.00
 Including  46.90   50.50        3.60      11.81    0.55    4.30
/T/
For more information and a complete listing of all RMM drill intersections, corresponding
maps, figures and
NI43-101 compliance information please visit our website at www.ramblermines.com.
Larry Pilgrim, P.Geo. is the Qualified Person responsible for the technical content of this
release and has
reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by
Rambler Metals and
Mining plc.
All tonnes are dry metric tonnes.
Drill intercepts quoted are core lengths; true widths for the gold zone are estimated to be in
excess of 60% of
the intersected core lengths. Analytical results for Rambler core in this press release were
determined at
Eastern Analytical, Springdale, NL. Samples are then shipped by courier to Activation
Laboratories Ltd.,
Ancaster Ontario, where a 34 element ICP analysis and gold fire assay are performed. The
results presented in
this release are based on assay data from Eastern Analytical and may or may not be used in any
NI43-101
resource estimate.
National Instrument 43-101 compliance information regarding sampling and analytical protocols
pertaining to the
Rambler Project can be accessed via the following link: http://www.ramblermines.com.
-30-
FOR FURTHER INFORMATION PLEASE CONTACT:
Rambler Metals and Mining Canada Limited
George Ogilvie, P.Eng.
President and CEO
(709) 532-4990
OR
Rambler Metals & Mining Plc
Leslie Little
Company Secretary
+44 (0) 20-7661-8104
Website: www.ramblermines.com
OR
Seymour Pierce Limited
Nandita Sahgal
+44 (0) 20-7107 8000
OR
Pelham Public Relations
Chelsea Hayes
+44 (0) 20-7743-6675
The TSX-Venture Exchange does not accept responsibility for the adequacy or accuracy of this
release.
-0-
								
Rambler Metals & Mining Plc
								
<< Back


Rambler Metals Plc Historical Chart Rambler Metals Plc Intraday Chart  
Period
noad


LSE and PLUS quotes are live. NYSE and AMEX quotes are delayed by at least 20 minutes.
All other quotes are delayed by at least 15 minutes unless otherwise stated.
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions :: Contact Us :: Request an Exchange :: Affiliate Scheme
Copyright1999-2008 ADVFN PLC. Copyright and limited reproduction :: Privacy Policy :: Investment Warning :: Advertise with us :: Data accreditations :: Investor Relations :: Press office :: Jobs
ADDITIONAL SERVICES AVAILABLE FROM ADVFN
Upgrade - Click here for more information on ADVFN premium services Money Words - ADVFN Financial Glossary Investor Training ADVFN Financial Bookshop Online Training Academy
38 site:2us 081123 13:44 Stock Message Boards ( 2001 | 2002 | 2003 | 2004 | 2005 | 2005 | 2007 )