TIDMMAFL

RNS Number : 0356G

Mineral & Financial Invest. Limited

24 May 2017

MINERAL & FINANCIAL INVESTMENTS LIMITED

("Mineral & Financial", "MAFL", or the "Company")

Third Exploration Hole At Lagoa Salgada Highlights Three Mineralized Zones, Indicating It's Part Of Larger Mineralized System; Assays Of 9.80% Zinc Equiv(1)

HIGHLIGHTS:

   -   3(rd) hole strikes large mineralized zone with intercepts as high as 8m of 9.80% Zn equiv.(1) 

- Mineralization is respectively a 110m and 150m step-out from first and second holes (LS ST-01) of this drilling program and 200m from the historic LS 28 hole.

   -   Three higher grade mineralized channels encountered within a larger zone of mineralization. 
   -   Results  to date suggests that mineralization is part of a larger mineralized system. 
   -   Mineralisation remains open at depth and along strike 
   -   Remainder of drill-hole results expected  within 10 days. 

George Town, Cayman Island - May 24, 2017 - Mineral & Financial Investments is pleased to announce drill results from its 49%-owned subsidiary, TH Crestgate GmbH, a private Swiss based investment company. TH Crestgate has released the assay results from the third hole of its 4 hole drilling campaign in the Central Sector LS-1 Area of the Lagoa Salgada Project, hole LS ST-04. The holes were completed by TH Crestgate's wholly owned local subsidiary (Redcorp Empreedimentos Lda), on its 85%-owned Lagoa Salgada zinc-copper project in southern Portugal, 100km SE of Lisbon. This 4-hole drill program announced and initiated in December 2016 is focussed on the "Central Sector", which is immediately to the SE of the LS-1 historic resource, and is designed to complement historic drilling. The assay results from the final hole (LS ST-03) of the program are expected from ALS in Seville, Spain shortly.

LS ST-04 is an important hole as it was drilled to be perpendicular to the mineralization and cross mineralized structures 200m NE from historic hole LS-28. The hole confirms the mineralized area both in width and depth. The length of the intersection brings TH Crestgate one step closer to confirming the thesis that the mineralization will be large in tonnage.

Additionally, hole LS ST-04 confirms the presence of three main corridors of medium grade mineralization with intervals of 22 to 40 meters of 2.6% to 4.0 Zn Eq. Each of these corridors also hosts higher grade intervals of 5% Zn Eq.

This hole appears to confirm that the mineralized zone is a stock-work mineralization that is distinct, but adjacent to the massive sulphide mineralization that hosts the preliminary resource centred around LS-1 (see "Asset Description" below). The mineralization remains open at depth, to the east and to the west.

 
                                                                          Cu Equiv.   Zn Equiv. 
              Depth    Thickness    Cu     Zn     Pb      Au       Ag 
    Hole        (m)       (m)       (%)    (%)    (%)    (g/t)    (g/t)     (%)(1)      (%)(1) 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
              168 to 
 LS ST-04       408     240.00     0.13   0.77   0.45    0.01     6.69      0.75%       1.58% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
 LS ST-04     168 to 
  (C-1)         190      22.00     0.26   2.06   1.02    0.13     7.96      1.74%       3.66% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
              180 to 
  Including     190      10.00     0.52   4.03   1.99    0.01    15.57      2.44%       5.11% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
              181 to 
  Including     189      8.00      0.63   4.71   2.42    0.02    17.50      4.03%       8.45% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
 LS ST-04     287 to 
  (C-2)         310      23.00     0.26   1.14   0.97   0.02      6.87      1.25%       2.62% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
              287 to 
  Including     294      7.00      0.51   2.05   1.38    0.03    11.33      2.16%       4.42% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
              306 to 
  Including     310      4.00      0.43   2.38   1.83    0.01    11.50      2.42%       5.06% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
   LS ST-04   368 to 
      (C-3)     408      40.00     0.36   1.82   1.07    0.02    24.52      1.91%       4.01% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
              377 to 
  Including     393      16.00     0.64   3.20   1.71    0.02    40.00      3.28%       6.87% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
              382 to 
  Including     390      8.00      0.99   4.52   2.24    0.03    60.37      4.68%       9.80% 
-----------  -------  ----------  -----  -----  -----  -------  -------  ----------  ---------- 
 

85% ownership of project

Alastair Ford, Chief Operating Officer of Mineral and Financial, stated: "We continue to be encouraged by the results TH Crestgate is delivering from the Lagoa Salgada project. This latest hole indicates that we are dealing with a very large mineralized system, given the length of the mineralization.. This third hole's mineral characteristics are consistent with the first 2 holes, but immediately adjacent to the LS-1 resource. This hole further confirms our belief that Lagoa Salgada hosts numerous ore bodies."

LONG SECTION OF LS ST-04 HOLE

http://www.rns-pdf.londonstockexchange.com/rns/0356G_-2017-5-23.pdf

LONG SECTION OF HOLES LS ST-01 & LS ST-02

http://www.rns-pdf.londonstockexchange.com/rns/0356G_1-2017-5-23.pdf

MAP OF LOCATION OF LS-1 SECTOR RESOURCE AND

LOCATION OF "CENTRAL SECTOR" NEW AND HISTORICAL DRILL HOLES

http://www.rns-pdf.londonstockexchange.com/rns/0356G_2-2017-5-23.pdf

The 13,400-hectare Lagoa Salgada project currently has 17 identified gravimetric anomalies as well as a preliminary resource. The preliminary resource is located on one of these gravimetric anomalies, the LS-1 zone. The Central Sector is located within the LS-1 zone and is approximately 1200 meters SE of LS-1's 4.5 million tonne zinc / lead polymetallic preliminary resource. The 'Central Sector' was the subject of a 4 drill-hole program undertaken by a previous operator in the early 1990's. The current drill program is meant to confirm and expand the understanding and economic value of the Central Sector. The core from the 4th hole (LS ST-03) is currently with ALS and TH Crestgate expect assay results within the next 10 days

Asset Description

The Lagoa Salgada resource is focused on one gravimetric anomaly, LS-1. There are a total of 17 gravimetric anomalies on the property. These anomalies remain to be fully tested. The petrographic study focused on the LS-1 area of the Lagoa Salgada property and also indicated the presence of anomalously high levels of indium. The orebody is composed of a central stock work zone - a more than 700 m thick volcano-sedimentary complex - and a massive sulphide lens in the northwest. It is covered by more than one hundred meters of sediments of the Sado Tertiary basin (Lima et al., 2013, see below).

The historical, Canadian Institute of Mining (CIM) compliant, resource estimate, located on LS-1, completed in 2012 by Paul Daigle, P.Geo, is summarized below:

 
 Category                                             Gross                                                  Net Attributable 
----------------------  ----------------------------------------------------------------  ------------------------------------------------------ 
                                                                    Contained                                              Contained 
   LS-1                    Tonnes                Mineral    Grade    Metal         Units     Tonnes     Mineral    Grade    Metal          Units 
   Sector 
----------------------  ---------------------  ---------  -------  ------------  -------  ----------  ---------  -------  ------------  -------- 
                                                                                                       Pb 
                                                Pb (%)     2.94     190,686,436   Lbs.                  (%)       2.94     162,083,471   Lbs. 
----------------------  ---------------------  ---------  -------  ------------  -------  ----------  ---------  -------  ------------  -------- 
                                                                                                       Zn 
                                                Zn (%)     3.40     220,521,729   Lbs.                  (%)       3.40     187,443,469   Lbs. 
                                               ---------  -------  ------------  -------              ---------  -------  ------------  -------- 
                                                                                                       Cu 
                                                Cu (%)     0.34     22,052,173    Lbs.                  (%)       0.34     18,744,347    Lbs. 
                                               ---------  -------  ------------  -------              ---------  -------  ------------  -------- 
                                                                                                       Ag 
                                                Ag (g/t)   54.72    5,175,824     Oz.                   (g/t)     54.72    4,399,450     Oz. 
                                               ---------  -------  ------------  -------              ---------  -------  ------------  -------- 
                                                                                                       Au 
            Indicated               2,942,000   Au (g/t)   0.82     77,562        Oz.      2,500,700    (g/t)     0.82     65,927        Oz. 
----------------------  ---------------------  ---------  -------  ------------  -------  ----------  ---------  -------  ------------  -------- 
                                                                                                       Pb 
                                                Pb (%)     2.50     85,648,710    Lbs.                  (%)       2.50     72,801,404    Lbs. 
----------------------  ---------------------  ---------  -------  ------------  -------  ----------  ---------  -------  ------------  -------- 
                                                                                                       Zn 
                                                Zn (%)     1.80     61,667,071    Lbs.                  (%)       1.80     52,417,011    Lbs. 
                                               ---------  -------  ------------  -------              ---------  -------  ------------  -------- 
                                                                                                       Cu 
                                                Cu (%)     0.35     11,990,819    Lbs.                  (%)       0.35     10,192,196    Lbs. 
                                               ---------  -------  ------------  -------              ---------  -------  ------------  -------- 
                                                                                                       Ag 
                                                Ag (g/t)   51.00    2,548,073     Oz.                   (g/t)     51.00    2,165,862     Oz. 
                                               ---------  -------  ------------  -------              ---------  -------  ------------  -------- 
                                                                                                       Au 
            Inferred                1,554,000   Au (g/t)   0.78     38,971        Oz.      1,320,900    (g/t)     0.78     33,125        Oz. 
----------------------  ---------------------  ---------  -------  ------------  -------  ----------  ---------  -------  ------------  -------- 
                                                                                                       Pb 
                                                Pb (%)     2.79     276,335,146   Lbs.                  (%)       2.79     234,884,874   Lbs. 
----------------------  ---------------------  ---------  -------  ------------  -------  ----------  ---------  -------  ------------  -------- 
                                                                                                       Zn 
                                                Zn (%)     2.85     282,188,800   Lbs.                  (%)       2.85     239,860,480   Lbs. 
                                               ---------  -------  ------------  -------              ---------  -------  ------------  -------- 
                                                                                                       Cu 
                                                Cu (%)     0.34     34,042,992    Lbs.                  (%)       0.34     28,936,543    Lbs. 
                                               ---------  -------  ------------  -------              ---------  -------  ------------  -------- 
                                                                                                       Ag 
                                                Ag (g/t)   53.43    7,723,897     Oz.                   (g/t)     53.43    6,565,313     Oz. 
                                               ---------  -------  ------------  -------              ---------  -------  ------------  -------- 
                                                                                                       Au 
            Total                   4,496,000   Au (g/t)   0.81     116,532       Oz.      3,821,600    (g/t)     0.81     99,052        Oz. 
----------------------  ---------------------  ---------  -------  ------------  -------  ----------  ---------  -------  ------------  -------- 
 

Source: Tetra-Tech Wardrop.

References in this announcement to exploration results and resource updates have been approved for release by Joao Barros, BSc (Engineering), MSc (Geology), who has more than 14 years of relevant experience in the field of activity concerned. Mr Barros is a Member of the Portuguese Engineers Association. Mr. Barros, who is employed by Redcorp Empreedimentos Mineiros, Lda., a wholly owned subsidiary of TH Crestgate GmbH, consented to the inclusion of the material in the form and context in which it appears.

This report should be seen as indicative of possible mineral content and not definitive, as the sample group is insufficient to arrive at any economic conclusions.

For more information:

   Katy Mitchell, WH Ireland                               +44 161 832 2174 
   Jacques Vaillancourt, Chairman                       +44 0780 226 8247 

(1) Cu. and Zn. equivalency calculated using the following spot prices: Cu $5,782 /t; Zn $2,761/t; Pb $2,307/t; Au $1,252/oz.; Ag $18.33/oz.

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLPGUUCAUPMGBW

(END) Dow Jones Newswires

May 24, 2017 02:01 ET (06:01 GMT)

Mineral & Financial Inve... (LSE:MAFL)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Mineral & Financial Inve... Charts.
Mineral & Financial Inve... (LSE:MAFL)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Mineral & Financial Inve... Charts.