Centamin plc ("Centamin", the "Group" or "the Company") (LSE: CEY, TSX: CEE) is pleased to announce its results for the second quarter ended 30 June 2015.

Operational Highlights(1),(2)

   --    Gold production of 107,781 ounces was in line with the first quarter and up 33% on Q2 2014. 

-- Cash cost of production of US$706 per ounce and all-in sustaining costs (AISC) of US$853 per ounce.

   --    2015 production guidance of between 430,000 and 440,000 ounces. 

-- With higher anticipated production and our continued focus on cost control, we expect to achieve below the previously guided cash cost of production of US$700 per ounce and AISC of US$950 per ounce.

   --    Record process plant throughput of 2.67Mt was 7% above the 10Mtpa nameplate capacity. 

-- Recovery of 90.3%, up by 2% over the first quarter, reflects on-going optimisation of the process plant.

-- Underground mining slightly above forecast with 282kt of ore mined at an average grade of 6.3g/t.

-- Underground drilling at Sukari continues to support further resource and reserve expansion potential.

-- Encouraging results from exploration programmes in Ethiopia, Burkina Faso and Côte d'Ivoire.

Financial Highlights(1),(2)

-- EBITDA of US$37.3 million was down 30% on Q1 2015, as lower operating costs were offset by a fall in realised gold prices and a reduction in gold sales volumes.

-- Centamin remains debt-free and un-hedged with cash, bullion on hand, gold sales receivable and available-for-sale financial assets of US$212.6 million at 30 June 2015.

-- Interim dividend of 0.97 cent per ordinary share versus an interim payment of 0.87 cent in 2014.

   --    Basic earnings per share of 1.65 cents; down 34% on Q1 2015. 

Legal Developments in Egypt

-- The Supreme Administrative Court appeal and Diesel Fuel Oil court case are both still on-going. Centamin is aware of the potential for the legal process in Egypt to be lengthy and it anticipates a number of hearings and adjournments before decisions are reached. Operations continue as normal and any enforcement of the Administrative Court decision has been suspended pending the appeal ruling.

 
                                  Q2 2015   Q1 2015   Q2 2014   Q1 2014 
------------------  -----------  --------  --------  --------  -------- 
 Gold produced         ounces     107,781   108,233    81,281    74,241 
 Gold sold             ounces     104,168   111,249    79,350    78,957 
 Cash cost of 
  production         US$/ounce        706       717       783       744 
 AISC                US$/ounce        853       858        NR        NR 
 Average realised 
  gold price         US$/ounce      1,188     1,216     1,291     1,298 
------------------  -----------  --------  --------  --------  -------- 
 Revenue              US$'000     124,192   135,231   102,624   102,725 
 EBITDA               US$'000      37,308    52,988    32,617    34,265 
 Profit before 
  tax                 US$'000      18,841    28,566    11,330    20,593 
 EPS                  US cents       1.65      2.50      0.99      1.87 
 Cash generated 
  from operations     US$'000      49,729    56,643    20,139    27,833 
------------------  -----------  --------  --------  --------  -------- 
 

(1) Cash cost of production, AISC, EBITDA and cash, bullion on hand, gold sales receivables and available-for-sale financial assets are non-GAAP measures and are defined at the end of the Financial Statements. AISC is defined by the World Gold Council, the details of which can be found at www.gold.org.

(2) Basic EPS, EBITDA, AISC, cash cost of production includes an exceptional provision against prepayments, recorded since Q4 2012, to reflect the removal of fuel subsidies which occurred in January 2012 (see Note 4 of the Financial Statements)

NR - Not Reported.

Andrew Pardey, CEO of Centamin, commented: "The first half of the year at Sukari focused on ramping up the productivity of the expanded plant and increasing the development of both the underground and open pit mining operations. At the same time Centamin is pleased to have generated strong cash flows, allowing both increased dividend payments to shareholders and continued investment in exploration, despite the continued pressure on the gold price. We are now beginning to reap the benefits of our investment in the higher processing capacity at Sukari, with expected further improvements in productivity in the quarters ahead. We remain confident of achieving our current guidance on gold production and low cash costs, and in generating free cash whilst we endeavour to generate additional value through our exploration programmes at Sukari and in Burkina Faso, Côte D'Ivoire and Ethiopia."

Centamin will host a conference call on Wednesday, 12th August at 9.00am (London, UK time) to update investors and analysts on its results. Participants may join the call by dialling one of the following three numbers, approximately 10 minutes before the start of the call.

UK Toll Free: 080 8237 0040

International Toll number: +44 20 3428 1542

Canada Toll free: 1866 404 5783

Participant code: 27847585#

A recording of the call will be available four hours after the completion of the call on:

UK Toll Free: 0808 237 0026

International Toll number: +44 20 3426 2807

Playback Code: 660948#

Via audio link at http://www.centamin.com/centamin/investors

________________________________

CHIEF EXECUTIVE OFFICER'S REPORT

Centamin's EBITDA of US$37.3 million was down 30% on the first quarter and up 14% on Q2 2014, as the expanded Sukari operation continued to deliver competitive returns under the weak gold price environment. Gold production was comparable with the first quarter and a 2% fall in the average realised gold price, coupled with a reduction in gold sales volumes, were partially offset by an $11 per ounce decrease in the cash cost of production to US$706 per ounce, mainly due to a reduction in the fuel price offset by a slight increase in open pit mining and processing costs.

All-in sustaining costs (AISC) of US$853 per ounce was below full year guidance, mainly due to the planned scheduling of certain sustaining capital cost items to later in the year and the above-mentioned reduction in the fuel price.

The cash generation further strengthened our balance sheet, which ended the period with US$212.6 million of cash, bullion on hand, gold sales receivable and available-for-sale financial assets. This reflects an increase of US$16.8 million during the quarter, net of a US$22.7 million payment in relation to the final dividend for 2014.

In line with our policy to maintain a return of capital to our shareholders, and supported by the robust cash flows from Sukari, I am pleased to announce today an interim dividend payment for the current financial year of 0.97 cent per share.

The second quarter delivered stronger than anticipated production with processing rates 7% above the 10Mtpa nameplate capacity, as finer material was fed to the milling circuit due to improved blasting and greater availability of the secondary crushers. Also of note was an improvement in metallurgical recoveries to 90.3%, above the forecast level of 88%. The increase was mainly driven by greater efficiencies in the fine-grinding circuit, in addition to a re-configuration of the final leaching stages and improved performance of the new carbon regeneration kiln. Work continues to ensure recoveries are sustained at these higher levels.

The open pit delivered total material movement of 13,671kt for the quarter, a decrease of 15% on Q1 2015, due to lower fleet utilization and productivity. Mined ore grades of 0.76g/t remained in line with our forecast.

The underground mine delivered 282kt of ore, a 7% increase on Q1 2015, at an average grade of 6.3g/t in line with the mining plan. The focus for the operation remains to consistently deliver ore at an average grade of at least 6g/t.

We continue to expect higher quarterly production rates of 450,000-500,000 ounces per annum in the second half of the year, driven by further improvements in plant throughput and progressive increases in open pit grades towards the reserve average of 1.05g/t. As previously announced, as a result of the stronger than expected production in the second quarter, we have updated our full year production guidance to between 430,000 and 440,000 ounces. With this higher expected production, and our continued focus on cost control, we expect to achieve below our previous full year guidance for cash cost of production of US$700 per ounce and AISC of US$950 per ounce.

Some progress has been made to date in optimising productivity from the various areas of the expanded Sukari operation and there remains scope for further significant improvements and production increases over the coming quarters. In particular, we remain confident that the expanded plant will achieve, in time, throughput levels materially above nameplate and that the underground operation will continue to deliver stable grades at the current mining rates. The additional shareholder value that can be gained from our continued drive to maximize productivity and reduce unit costs has the potential to be substantial and requires no material capital expenditure.

Further support for resource expansion and the long-term sustainability of high-grade production at Sukari from the underground mine continues to be provided by results from on-going exploration drilling, as highlighted in the following pages of this report. Exploration at our projects in Burkina Faso, Côte D'Ivoire and Ethiopia also continue to provide encouraging results.

Centamin remains committed to its policy of being 100% exposed to the gold price through its un-hedged position.

The two litigation actions, Supreme Administrative Court appeal (SAC Appeal) and Diesel Fuel Oil court case (DFO Case), progressed in line with our expectations during the half year and are described in further detail in Note 7 to the financial statements. In respect of the former, the Company continues to believe that it has a strong legal position and, in addition, that it will ultimately benefit from law 32/2014, which came into force in April 2014 and which restricts the capacity for third parties to challenge any contractual agreement between the Egyptian government and an investor. Law 32/2014 is currently under review by the Supreme Constitutional Court of Egypt. We are aware of the potential for the legal process in Egypt to be slow and for cases to be subject to delays and adjournments but we remain confident of the merits of the two cases.

2015 Interim Dividend

The Directors declared an interim dividend of 0.97 cent per share (US$0.0097) on Centamin plc ordinary shares (totalling approximately US$11 million). The interim dividend for the half-year period ending 30 June 2015 will be paid on 9 October 2015 to shareholders on the register on the Record Date of 4 September 2015.

London Stock Exchange (T+2)

EX-DIV DATE: 3 September 2015

RECORD DATE: 4 September 2015

LAST DATE FOR RECEIPT OF CURRENCY ELECTIONS: 18 September 2015

PAY DATE: 9 October 2015

Toronto Stock Exchange (T+3)

EX-DIV DATE: 2 September 2015

RECORD DATE: 4 September 2015

PAY DATE: 9 October 2015

The dates set out above are based on the Directors' current expectations and may be subject to change. If any of the dates should change, the revised dates will be announced by press release and will be available at www.centamin.com.

As a Jersey incorporated company, there is no requirement for Centamin plc to make any withholding or deduction on account of Jersey tax in respect of the dividend.

Shareholders who wish to elect to receive sterling dividends can mandate payments directly to their UK bank or building society by visiting the Investor Centre website at www.investorcentre.co.uk/je or by completing the dividend mandate form which is available at www.centamin.com and posting it back to the registrars in accordance with the instructions set out in the form. The currency election mandate will be applicable for shareholders with a UK bank account. Our registrars have also arranged a global payment service allowing payment directly to your designated account, please visit www.investorcentre.co.uk/je or www.centamin.com for details. The global payment service is a service provided by the registrars for shareholders registered on the LSE and transfer charges may apply.

The last date for shareholder currency elections and payment mandates to be received by the Company will be 18 September 2015. Please note, the registrars retain mandates previously provided by shareholders and will apply the instructions for this and future dividends. The currency conversion rate for those electing to receive sterling will be based on the foreign currency exchange rates on 18 September 2015. The rate applied will be published on the Company's website on 21 September 2015.

OPERATIONAL REVIEW

Sukari Gold Mine:

 
                                    Q2 2015  Q1 2015  Q2 2014  Q1 2014 
----------------------------------  -------  -------  -------  ------- 
OPEN PIT MINING 
Ore mined (1) ('000t)                 1,751    2,562    1,795    2,325 
Ore grade mined (Au 
 g/t)                                  0.76     0.78     0.70     0.61 
Ore grade milled 
 (Au g/t)                              0.75     0.95     0.81     0.85 
Total material mined 
 ('000t)                             13,671   15,996    9,861    9,749 
Strip ratio (waste/ore)                6.81     5.24      4.5      3.2 
----------------------------------  -------  -------  -------  ------- 
UNDERGROUND MINING 
Ore mined from development 
 ('000t)                                127      129      127      102 
Ore mined from stopes 
 ('000t)                                155      135      103      104 
Ore grade mined (Au 
 g/t)                                  6.30     6.01     5.56     6.95 
----------------------------------  -------  -------  -------  ------- 
Ore processed ('000t)                 2,667    2,478    1,957    1,486 
Head grade (g/t)                       1.32     1.48     1.37     1.69 
Gold recovery (%)                      90.3     88.3     88.1     88.6 
Gold produced - dump 
 leach (oz)                           4,715    4,814    4,968    4,113 
Gold produced - total 
 (2) (oz)                           107,781  108,233   81,281   74,241 
Cash cost of production(3) 
 (4) (US$/oz)                           706      717      783      744 
               Open pit mining          224      247      248      245 
               Underground mining        48       47       60       69 
               Processing               381      369      413      364 
               G&A                       53       54       62       66 
AISC(3) (4) (US$/oz)                    853      858       NR       NR 
----------------------------------  -------  -------  -------  ------- 
Gold sold (oz)                      104,168  111,249   79,350   78,957 
Average realised 
 sales price (US$/oz)                 1,188    1,216    1,291    1,298 
----------------------------------  -------  -------  -------  ------- 
 

(1) Ore mined includes 48kt @ 0.51g/t delivered to the dump leach pad in Q2 2015 (99kt @ 0.43 g/t in Q2 2014).

   (2)   Gold produced is gold poured and does not include gold-in-circuit at period end. 

(3) Cash cost exclude royalties, exploration and corporate administration expenditure. Cash cost and AISC are non-GAAP financial performance measures with no standard meaning under GAAP. For further information and a detailed reconciliation, please see "Non-GAAP Financial Measures" section below.

(4) Cash cost of production and AISC reflect an exceptional provision against prepayments to reflect the removal of fuel subsidies which occurred in January 2012 (refer to Notes 4 and 5 respectively to the financial statements for further details).

Health and safety - Sukari

The lost time injury (LTI) frequency rate for Q2 2015 was 0.16 per 200,000 man-hours (Q2 2014: 0.29 per 200,000 man-hours), with a total of 1,238,861 man-hours worked (Q2 2014: 1,375,221). Developing the health and safety culture onsite has resulted in improved reporting of incidents compared to previous periods and, although there remains further room for improvement, Centamin views its LTI frequency rate as a solid achievement considering Sukari is the first modern gold mine in Egypt.

Open pit

The open pit delivered total material movement of 13,671kt in the quarter, a decrease of 15% on Q1 2015 due to lower fleet utilization and productivity and a 39% increase on the prior year period. Mining focused on the Stage 3A and 3B areas and the northern and eastern walls of the open pit, in line with the mine plan.

Ore production from the open pit was 1.75Mt at 0.76g/t with an average head grade fed to the plant of 0.75 g/t, in line with the mine plan and our forecast. The ROM ore stockpile balance decreased by 878kt to 1,326kt by the end of the quarter.

Ore mining rates are scheduled to increase during the second half of the year and we continue to expect grades to progressively increase towards the reserve average of 1.05g/t as mining progresses through the upper portions of the next stage of pit development.

Underground mine

Ore production from the underground mine was 282kt, a 7% increase on Q1 2015 and a 23% increase on the prior year period. The ratio of stoping-to-development ore mined increased, with 55% of stoping ore (155kt) and 45% of development ore (127kt). Ore tonnages from stopes increased by 15% on the first quarter.

An average head grade of 6.3 g/t was mined in Q2 2015, with stope production grade of 7.1 g/t and development grade of 5.3 g/t.

Total development during the quarter, including the Amun and Ptah decline, was 2,091 metres. Development within mineralised areas of Amun accounted for 1,160 metres and took place between the 830 and 710 levels (230 to 350 metres below the underground portal), including extension of a portion of the Amun decline through low-grade ore. Ptah development in mineralised areas took place over 241 metres on the P810 and P790 levels.

Further work on the exhaust ventilation circuits for both the Amun and Ptah declines continued, ensuring sufficient ventilation as the decline extends deeper into the orebody.

A new drive, Hannibal, was developed over 91 metres through the second highest point of Sukari Hill. The objective of the target 120 metre incline is to provide access for future open pit development.

A total of 2,495 metres of grade control diamond drilling were completed, aimed at short-term stope definition, drive direction optimisation and underground resource development. Positive results continue and are discussed in the following section. A further 6,610 metres of drilling continued to test the depth extensions below the current Amun and Ptah zones, and included 666m drilled from the Hannibal drive to test for mineralisation around the top of Sukari Hill.

Processing

Quarterly throughput at the Sukari process plant was 2,667Mt, a 36% increase on the prior year reflecting the ramp-up of ore treatment through the new Stage 4 plant circuit. Processed tonnages were 8% above the first quarter and 7% above the nameplate capacity of 10Mtpa as finer material was fed to the milling circuit due to improved blasting and greater availability of the secondary crushers. Plant productivity of 1,361 tonnes per hour (tph) represented an 11% increase on the prior year period and a 6% increase on Q1 2015.

Plant metallurgical recoveries were 90.3%, a 2.4% increase on Q1 2015 and a 2.6% increase on the prior year period. This significant improvement was achieved through maintaining an improved grind size from the Stirred Media Detritors (SMDs) in the fine-grinding circuit, leading to improved solid leaching rates in the subsequent CIL circuit. In addition, the new carbon regeneration kiln and a reconfiguration of the Stage 1 leach tanks contributed to the improved overall plant recovery. Work continues to optimise the operational controls and improve circuit stability to ensure recoveries can be sustained at these higher levels.

The dump leach operation produced 4,715oz, a 2% decrease on the first quarter and a 5% decrease on the prior year period.

Exploration

Sukari

Drilling from underground remains a focus of the Sukari exploration programme as new development provides improved access to test potential high-grade extensions of the deposit. The ore body has not yet been closed off to the north, south or at depth and further underground drilling of the Sukari deposit will take place during 2015, predominantly from both the Amun and Ptah declines.

Selected results received during the second quarter from the underground drilling programme, which are in addition to those previously disclosed, include the following:

Amun

 
 Hole             Depth       Interval   Au (g/t) 
  Number                         (m) 
-----------  --------------  ---------  --------- 
              From     To 
-----------  ------  ------  ---------  --------- 
 UGRSD0405    182.9   184.0        1.1       79.0 
-----------  ------  ------  ---------  --------- 
 

Ptah

 
 Hole             Depth       Interval   Au (g/t) 
  Number                         (m) 
-----------  --------------  ---------  --------- 
              From     To 
-----------  ------  ------  ---------  --------- 
 UGRSD0131     95.2    97.0        1.8       18.3 
-----------  ------  ------  ---------  --------- 
 UGRSD0131    100.7   102.0        1.3       48.5 
-----------  ------  ------  ---------  --------- 
 UGRSD0164    313.9   319.2        5.3      147.2 
-----------  ------  ------  ---------  --------- 
 UGRSD0165    197.0   197.9        0.9       59.7 
-----------  ------  ------  ---------  --------- 
 UGRSD0165    202.7   203.3        0.6      109.0 
-----------  ------  ------  ---------  --------- 
 UGRSD0551     54.7    63.1        8.4        5.9 
-----------  ------  ------  ---------  --------- 
 UGRSD0563    277.0   285.0        8.0        5.1 
-----------  ------  ------  ---------  --------- 
 

Whilst exploration remains focused on Sukari Hill, there are seven other prospects that have been identified within the 160km(2) Sukari tenement area which are close enough such that ore could be trucked to the existing processing plant.

A resource and reserve update is nearing completion and should be released shortly.

Burkina Faso

Centamin's systematic exploration programme over the suite of tenements collectively known as the Batie West permits includes reverse circulation (RC), diamond, aircore and auger drilling, geophysical surveys, geochemical sampling and geological mapping. Numerous prospects are being tested, including Wadaradoo, Tonior, Napelapera, Hunter, Amimbiri, Kouglaga North, Danhal, Dounkou, Tiopolo and Kpere Batie prospects. During the quarter, Centamin has completed 32,094 metres of drilling, including 2,807 metres of diamond drilling.

Drill targets identified from the completed Induced Polarisation (IP) geophysical survey at Wadaradoo are being tested. Geochemical sampling work has commenced on the Danhal licence area to test the northern extension of the Batie shear zone.

A signed ministerial decree in relation to the Tiopolo mining licence application was issued on 5th March 2015. A subsequent application has been made to postpone development and continue exploration, as provisioned in the Burkina Faso Mining Code.

The strategy for 2015 is to continue to systematically explore the entire 160 km strike length of the belt and drill-test the numerous prospects. It is expected this will lead into further resource development work in late 2015 progressing into 2016.

Côte d'Ivoire

Centamin has three licences in Côte d'Ivoire covering a c.1,200 km(2) area across the border from Batie West in Burkina Faso. The objective for 2015 is to geologically assess the licence areas, and identify and undertake first pass RC drilling on priority targets, aimed at a path towards resource development in 2016.

Fieldwork continued with mapping, rock chip sampling and auger drilling geochemistry. Aircore drilling commenced during the period targeting the identified anomalies. An airborne magnetic and radiometric survey was completed over the permits and interpretation of the data is underway.

A further four licences are currently under application and are expected to be granted in 2015, and are planned to be covered by regional surface geochemistry aimed at identifying anomalies for first-pass drilling in 2016.

Ethiopia

Centamin continued exploration on its tenement in Una Deriam in northern Ethiopia where a total of 1,530 metres were drilled during Q2 2015.

Drilling continued to test continuity of mineralization and positive drill results along strike. Results received during the period received show broad zones of mineralisation including 18m @ 0.93g/t and 6m @ 1.83g/t.

Field work continued on the Ondonok Dabus licence, located in the west of Ethiopia close the regional capital of Asosa, with mapping, soil geochemistry (BLEG) and rock chip sampling being completed.

FINANCIAL REVIEW

Centamin has a strong and flexible financial position with no debt, no hedging and cash, bullion on hand, gold sales receivables and available-for-sale financial assets of US$212.6 million at 30 June 2015, up from US$195.8 million at 31 March 2015. For further information, please see the "Non-GAAP Financial Measures" section.

 
                                At 30 June 2015    At 30 June 
                                                    2014 
-----------------------------  -----------------  ---------------- 
 Cash at Bank                   US$175.0 million   US$106.4 
                                                    million 
-----------------------------  -----------------  ---------------- 
 Gold Sales Receivable          US$24.2 million    US$18.7 million 
-----------------------------  -----------------  ---------------- 
 Available for sale financial   US$0.3 million     US$0.3 million 
  assets 
-----------------------------  -----------------  ---------------- 
 Bullion on hand                US$13.1 million    US$7.9 million 
-----------------------------  -----------------  ---------------- 
 Total                          US$212.6 million   US$133.3 
                                                    million 
-----------------------------  -----------------  ---------------- 
 

Centamin's unit cash cost of production was US$706 per ounce, a decrease of US$11 versus Q1 2015 due to a reduction in the cost of fuel, offset by a slight increase in open pit mining and processing costs. On the basis of excluding the exceptional provision for fuel prepayments this equated to US$624 per ounce, a decrease of US$30 versus Q1 2015.

International fuel prices have been falling steadily and the average cost per litre has reduced by 23% compared with the first quarter (and 41% compared with the prior year period). The contribution of fuel costs to the overall cash cost of production has reduced by US$31 per ounce compared with the first quarter (and US$115 per ounce compared with the prior year period).

During the remainder of the year we expect the cash cost of production to further reduce, as increasing plant throughput and improving grades drive higher quarterly production rates and additional cost efficiencies.

A breakdown of capital expenditure for the Group during Q2 2015 is as follows:

 
                            US$ million 
 Open pit development                 - 
 Underground mine 
  development (1)                   7.6 
 Other sustaining                     - 
  capital expenditure 
                           ------------ 
 TOTAL SUSTAINING 
  CAPEX - SUKARI                    7.6 
 
 EXPLORATION CAPITALISED            5.4 
 
   (1)      Includes underground development drilling 

We continue to expect 2015 sustaining capital expenditure to be approximately US$70 million as advised at our Capital Markets Day in May 2015, with certain sustaining capital cost items being scheduled to later in the year.

AISC was below our full year guidance, mainly due to above-mentioned re-scheduling of sustaining capital costs and the reduction in the fuel price. Full year production is expected to be between 430,000 and 440,000 ounces of gold at below our previous forecast of US$700 per ounce cash cost of production and US$950 AISC.

EBITDA for the period was US$37.3 million, down 30% on the previous quarter. The key contributing factors were:

   (a)   a 9% or a US$11.3 million decrease in revenue; partially offset by 
   (b)   a 2% or a US$1.3 million decrease in mine production costs, and 

(c) a US$3.0 million decrease in inventory against a US$2.0 million increase in the previous quarter.

CORPORATE UPDATE

As noted in previous annual reports, certain additional responsibilities were undertaken by the Senior Independent Non-Executive Director, Ed Haslam while the roles of CEO and Chairman were combined. With Josef El-Raghy now acting solely as Chairman, following the appointment of Andrew Pardey as CEO in February 2015, certain of the responsibilities undertaken by Ed Haslam have reverted to the Chairman. In light of this, the role undertaken by Ed and the associated remuneration has been reviewed and his fees reduced accordingly. Ed Haslam will, however, continue to undertake certain additional functions, as Josef is an Executive Chairman. Accordingly, Ed's title has been changed to Deputy Chairman and Senior Independent Non-Executive Director.

Following the adoption of the new restricted share plan, the Company has granted 5,145,000 conditional awards to employees of the Group. The Remuneration Committee also proposed an amendment to the scheme rules, following feedback from shareholders and the proxy advisory organisation and the Company subsequently applied an amendment to the published scheme rules to include a malus claw back provision. In summary, the additional clause has been included so that an award holder who ceases to be an eligible employee for cause (see definition below) in the period after the award has vested but before the settlement of the deferred shares (i.e. during the two year holding period) shall immediately forfeit his/her rights in the award from the date of cessation. Cause is defined as "ceasing to be an Eligible Employee by reason of dismissal for gross misconduct, fraud or materially adversely affecting the Group's reputation".

A summary of the new restricted share plan is set out in note 14 of the Interim Condensed Consolidated Financial Statements.

LEGAL ACTIONS

As detailed in Note 7 of the accompanying interim condensed consolidated financial statements, the Group's appeal against the 30 October 2012 ruling by the Egyptian Administrative Court remains on-going. Centamin does not currently see the need to take the matter to proceedings outside of Egypt as Centamin remains of the belief that the Egyptian Supreme Administrative Court will rule in Centamin's favour, based on the legal merit of the case.

The Group continues to benefit from the full support of the Ministry of Petroleum and EMRA, both in the appeal and at the operational level.

It should be noted that law 32/2014, was passed in April 2014, restricting the capacity for third parties to challenge any contractual agreements between the Egyptian government and an investor. The Company's legal advisers have confirmed that Centamin is likely to benefit from this law in the SAC Appeal. The validity of law 32/2014 is currently being challenged in the Egyptian Constitutional Court but Centamin believes the challenge is unlikely to succeed and that the original claim in relation to the Sukari Concession Agreement, which was brought by a third party and is subject to an on-going court appeal, should, in due course, be dismissed under the provisions of law 32/2014.

In light of the on-going dispute with the Egyptian Government regarding the price at which diesel fuel oil (DFO) is supplied to the mine at Sukari, it has been necessary since January 2012 to advance funds to our fuel supplier, Chevron, based on the international price for diesel. The Company has fully provided against the prepayment of US$178.2 million as an exceptional item, of which US$12.4 million was provided for during Q1 2015. Refer to Note 4 of the accompanying interim condensed consolidated financial statements for further details on the impact of this exceptional provision on the Group's results for Q1 2015.

In November 2012 the Group received a further demand from Chevron for the repayment of fuel subsidies received in the period from late 2009 through to January 2012, for EGP403 million (approximately US$52.0 million at current exchange rates). No provision has been made in respect of the historic subsidies prior to January 2012 as, based on legal advice that it has received to date, the Company believes that the prospects of a court finding in its favour in relation to this matter are strong.

As disclosed previously, the Company has commenced proceedings in the Administrative Court in Egypt in relation to these matters. The Company remains of the view that an instant move to international fuel prices is not a reasonable outcome and will look to recover any funds advanced thus far at the higher rate should the court proceedings be successfully concluded. Please refer to Note 7 to the accompanying interim condensed consolidated financial statements and the most recently filed Annual Information Form (AIF) for further information.

With the exception of the relationships with EMRA and the Egyptian government referred to above, we do not believe there are any third party relationships which are critical to the Group's success or which would have a material impact upon the Group's position if the relationship broke down.

COST RECOVERY AND PROFIT SHARE

Based on the Company's calculation there was no 'Net Profit Share' due to EMRA as at 30 June 2015, nor is any likely to be due as at 30 June 2016. It is expected that there will be profit share due to EMRA for the Sukari Gold Mine ("SGM") financial year ending 30 June 2017, based on budgeted production, operating expense forecasts and gold price. Centamin elected to make advance payments against future profit share during 2013 and 2014 to the value of US$23.75 million, in order to demonstrate goodwill towards the Egyptian government. An additional US$5.0 million has been paid in Q2 2015.

OUTLOOK

The main operational focus at Sukari remains on continuing production growth whilst maintaining a strong control on costs, with the objective of generating substantial free cash flow even under the current challenging gold prices. As our interim dividend highlights, we intend to continue returning 15-30% of this free cash flow to our shareholders, in line with our dividend policy, and to allocate the remainder towards our medium and long-term objective of organic growth aimed at realising incremental shareholder value and returns.

Safety remains a priority and we continue to target a lost time injury frequency rate of zero.

Guidance for 2015 is between 430,000 and 440,000 ounces at below our previous forecast of US$700/oz cash cost of production and US$950/oz AISC. Production is expected to achieve the 450,000-500,000 ounce per annum target rate from H2 onwards.

In the open pit the focus will continue on the northern and eastern cutback to expose higher-grade ore from the second half of the year. This will allow the operation to be on a secure footing to sustain, on an annual basis, the required tonnage at around the reserve average grade of 1.05g/t.

Exploration at Sukari continues to prioritise extensions of the high-grade underground resource and reserve and we expect to continue to deliver positive news in line with the strong results to date. A resource and reserve update is nearing completion and should be released shortly.

Outside of Sukari, we expect a total exploration expenditure of approximately US$25 million in 2015, with the largest proportion on the advanced exploration programme in Burkina Faso. Our exploration tenements in Côte d'Ivoire and Ethiopia are green field exploration sites and therefore require lower exploration spend. In line with our overall exploration strategy, the actual expenditure on these projects is results-driven and the current estimated expenditures are therefore subject to on-going revisions.

We will continue to evaluate potential opportunities to grow the business through the acquisition of projects offering the potential for the Company to deliver on its strategic objectives.

Andrew Pardey

Chief Executive Officer

Set out below are the unaudited consolidated Financial Statements for the Group, including notes thereto, for the quarter and half year ended 30 June 2015.

RESPONSIBILITY STATEMENT

We confirm that to the best of our knowledge:

(a) the condensed set of interim consolidated financial statements for the quarter and half year ended 30 June 2015 has been prepared in accordance with International Accounting Standard 34 'Interim Financial Reporting' as adopted by the European Union and as issued by the International Accounting Standards Board ("IASB");

(b) the condensed set of interim consolidated financial statements, which has been prepared in accordance with the applicable set of accounting standards, gives a true and fair view of the assets, liabilities, financial position and profit or loss of the issuer, or the undertakings included in the consolidation as a whole as required by DTR 4.2.4";

(c) the interim management report includes a fair review of the information required by DTR 4.2.7R (indication of important events during the first six months and description of principal risks and uncertainties for the remaining six months of the year); and

(d) the interim management report includes a fair review of the information required by DTR 4.2.8R (disclosure of related parties' transactions and changes therein).

By order of the Board,

Chief Executive Officer Chief Financial Officer

   Andrew Pardey                                                                     Pierre Louw 
   12 August 2015                                                                    12 August 2015 

UNAUDITED INTERIM CONDENSED CONSOLIDATED

FINANCIAL STATEMENTS

FOR THE QUARTER AND HALF YEAR ENDED

30 JUNE 2015

CONTENTS

INDEPENDENT REVIEW REPORT TO CENTAMIN PLC 15

   UNAUDITED INTERIM CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME              17-18 

UNAUDITED INTERIM CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION 19

UNAUDITED INTERIM CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY 20

UNAUDITED INTERIM CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS 21

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS 22

Independent review report to Centamin Plc

Report on the condensed consolidated interim financial statements

Our conclusion

We have reviewed the condensed consolidated interim financial statements, defined below, in the Results for the second quarter and half year ended 30 June 2015 of Centamin Plc. Based on our review, nothing has come to our attention that causes us to believe that the condensed consolidated interim financial statements are not prepared, in all material respects, in accordance with International Accounting Standard 34 as adopted by the European Union and the Disclosure and

Transparency Rules of the United Kingdom's Financial Conduct Authority. This conclusion is to be read in the context of what we say in the remainder of this report.

What we have reviewed

The condensed consolidated interim financial statements, which are prepared by Centamin Plc, comprise:

1. the unaudited interim condensed consolidated statement of comprehensive income for the six months ended 30 June 2015;

2. the unaudited interim condensed consolidated statement of financial position as at 30 June 2015;

3. the unaudited interim condensed consolidated statement of changes in equity for the six months ended 30 June 2015;

4. the unaudited interim condensed consolidated statement of cash flows for the six months ended 30 June 2015; and

5. the explanatory notes to the unaudited interim condensed consolidated interim financial statements.

As disclosed in note 1, the financial reporting framework that has been applied in the preparation of the full annual financial statements of the group is applicable law, the International Financial Reporting Standards (IFRSs) as issued by the IASB and the International Financial Reporting Standards (IFRSs) as adopted by the European Union.

The condensed consolidated interim financial statements included in the Results for the second quarter and half year ended 30 June 2015 have been prepared in accordance with International Accounting Standard 34, 'Interim Financial Reporting', as adopted by the European Union and the Disclosure and Transparency Rules of the United Kingdom's Financial Conduct Authority.

What a review of condensed consolidated financial statements involves

We conducted our review in accordance with International Standard on Review Engagements (UK and Ireland) 2410, 'Review of Interim Financial Information Performed by the Independent Auditor of the Entity' issued by the Auditing Practices Board for use in the United Kingdom. A review of interim financial information consists of making enquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures.

A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing (UK and Ireland) and, consequently, does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

We have read the other information contained in the Results for the second quarter and half year ended 30 June 2015 and considered whether it contains any apparent misstatements or material inconsistencies with the information in the condensed consolidated interim financial statements.

Responsibilities for the condensed consolidated interim financial statements and the review

Our responsibilities and those of the directors

The Results for the second quarter and half year ended 30 June 2015, including the condensed consolidated interim financial statements, are the responsibility of, and have been approved by, the directors. The directors are responsible for preparing the results for the second quarter and half year ended 30 June 2015 in accordance with the Disclosure and Transparency Rules of the United Kingdom's Financial Conduct Authority.

Our responsibility is to express to the company a conclusion on the condensed consolidated interim financial statements in the results for the second quarter and half year ended 30 June 2015 based on our review. This report, including the conclusion, has been prepared for and only for the company for the purpose of complying with the Disclosure and Transparency Rules of the Financial Conduct Authority and for no other purpose. We do not, in giving this conclusion, accept or assume responsibility for any other purpose or to any other person to whom this report is shown or into whose hands it may come save where expressly agreed by our prior consent in writing.

Other matters

We have not audited nor reviewed the unaudited interim condensed consolidated statement of comprehensive income for the three months ended 30 June 2015 and the unaudited interim condensed consolidated statement of cash flows for the three months ended 30 June 2015.

(a) The maintenance and integrity of the Centamin plc website is the responsibility of the directors; the work carried out by the auditors does not involve consideration of these matters and, accordingly, the auditors accept no responsibility for any changes that may have occurred to the condensed consolidated interim financial statements since they were initially presented on the website.

(b) Legislation in the Jersey governing the preparation and dissemination of financial statements may differ from legislation in other jurisdictions.

PricewaterhouseCoopers LLP

Chartered Accountants

12 August 2015

London

UNAUDITED INTERIM CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME FOR THE THREE MONTHS ENDED 30 JUNE 2015

 
                                  Note  30 June 2015                            30 June 2014 
                                        --------------------------------------  -------------------------------------- 
                                        Before                                  Before 
                                         exceptional    Exceptional              exceptional    Exceptional 
                                         items          items          Total     items          items          Total 
                                         US$'000        (1)            US$'000   US$'000        (1)            US$'000 
                                                        US$'000                                 US$'000 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
Revenue                           3          124,192              -    124,192       102,624              -    102,624 
Cost of sales                     4         (87,139)       (10,893)   (98,032)      (69,944)       (14,332)   (84,276) 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
Gross profit                                  37,053       (10,893)     26,160        32,680       (14,332)     18,348 
Other operating 
 costs                            4          (7,299)              -    (7,299)       (6,729)              -    (6,729) 
Impairment of 
 available-for-sale 
 financial assets                 13            (56)              -       (56)         (408)              -      (408) 
Finance income                    4               36              -         36           119              -        119 
Profit before 
 tax                                          29,734       (10,893)     18,841        25,662       (14,332)     11,330 
Tax                                              (8)              -        (8)             -              -          - 
Profit for the 
 period                                       29,726       (10,893)     18,833        25,662       (14,332)     11,330 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
EMRA Profit share                                  -              -          -             -              -          - 
Profit for the 
 period after 
 EMRA Profit share                            29,726       (10,893)     18,833        25,662       (14,332)     11,330 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
Profit for the 
 period attributable 
 to: 
 - the owners 
 of the parent                                29,726       (10,893)     18,833        25,662       (14,332)     11,330 
 - Non-controlling                                 -              -          -             -              -          - 
  interests 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
 
Other comprehensive 
 income 
 Items that may 
 be reclassified 
 subsequently 
 to profit or 
 loss: 
Gains/(losses) 
 on available 
 for sale financial 
 assets (net of 
 tax)                                          (235)              -      (235)             -              -          - 
Other comprehensive 
 income for the 
 period                             13         (235)              -      (235)             -              -          - 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
Total comprehensive 
 income for the 
 period net of 
 tax                                          29,491       (10,893)     18,598        25,662       (14,332)     11,330 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
Total comprehensive 
 income for the 
 period attributable 
 to: 
 - the owners                                      ' 
 of the parent                                29,491       (10,893)     18,598        25,662       (14,332)     11,330 
                                                   -              -          -             -              -          - 
  *    Non-controlling interests 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
Earnings per 
 share: 
Basic (cents 
 per share)                       10           2.600        (0.953)      1.647         2.250        (1.256)      0.994 
Diluted (cents 
 per share)                       10           2.565        (0.940)      1.625         2.224        (1.242)      0.982 
 

(1() Refer to Note 4 for further details.

The above Unaudited Interim Condensed Consolidated Statement of Comprehensive Income should be read in conjunction with the accompanying notes.

UNAUDITED INTERIM CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME FOR THE SIX MONTHS ENDED 30 JUNE 2015

 
                                  Note  30 June 2015                            30 June 2014 
                                        --------------------------------------  -------------------------------------- 
                                        Before                                  Before 
                                         exceptional    Exceptional              exceptional    Exceptional 
                                         items          items          Total     items          items          Total 
                                         US$'000        (1)            US$'000   US$'000        (1)            US$'000 
                                                        US$'000                                 US$'000 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
Revenue                           3          259,671              -    259,671       205,349              -    205,349 
Cost of sales                     4        (173,554)       (24,840)  (198,394)     (131,847)       (28,755)  (160,602) 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
Gross profit                                  86,117       (24,840)     61,277        73,502       (28,755)     44,747 
Other operating 
 costs                            4         (13,970)              -   (13,970)      (12,351)              -   (12,351) 
Impairment of 
 available-for-sale 
 financial assets                 13               -              -          -         (730)              -      (730) 
Finance income                    4               98              -         98           256              -        256 
Profit before 
 tax                                          72,245       (24,840)     47,405        60,677       (28,755)     31,922 
Tax                                              (8)              -        (8)             -              -          - 
Profit for the 
 period                                       72,237       (24,840)     47,397        60,677       (28,755)     31,922 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
EMRA Profit share                                  -              -          -             -              -          - 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
Profit for the 
 period attributable 
 to: 
 - the owners 
 of the parent                                72,237       (24,840)     47,397        60,677       (28,755)     31,922 
 - Non-controlling                                 -              -          -             -              -          - 
  interests 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
Other comprehensive 
 income 
 Items that may 
 be reclassified 
 subsequently 
 to profit or 
 loss: 
Losses on available 
 for sale financial 
 assets (net of 
 tax)                                           (99)              -       (99)             -              -          - 
Other comprehensive 
 income for the 
 period                             13          (99)              -       (99)             -              -          - 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
Total comprehensive 
 income for the 
 period net of 
 tax                                          72,138       (24,840)     47,298        60,677       (28,755)     31,922 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
Total comprehensive 
 income for the 
 period attributable 
 to: 
 - the owners                                      ' 
 of the parent                                72,138       (24,840)     47,298        60,677       (28,755)     31,922 
                                                   -              -          -             -              -          - 
  *    Non-controlling interests 
                                        ------------  -------------  ---------  ------------  -------------  --------- 
 
Earnings per 
 share: 
Basic (cents 
 per share)                       10           6.321        (2.174)      4.147         5.413        (2.565)      2.848 
Diluted (cents 
 per share)                       10           6.242        (2.147)      4.095         5.352        (2.536)      2.816 
 

(1() Refer to Note 4 for further details.

The above Unaudited Interim Condensed Consolidated Statement of Comprehensive Income should be read in conjunction with the accompanying notes.

UNAUDITED INTERIM CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION

AS AT 30 JUNE 2015

 
                                Note       30 June  31 December 
                                              2015         2014 
                                       (Unaudited)    (Audited) 
                                           US$'000      US$'000 
NON-CURRENT ASSETS 
Property, plant and 
 equipment                       11        901,487      928,964 
Exploration and evaluation 
 asset                           12        138,017      123,999 
Prepayments                      5          28,750       23,750 
Interests in associates                          -            - 
Other receivables                              748          645 
                                      ------------  ----------- 
Total non-current assets                 1,069,002    1,077,358 
                                      ------------  ----------- 
 
CURRENT ASSETS 
 
Inventories                                130,658      140,628 
Available-for-sale 
 financial assets                13            323          409 
Trade and other receivables                 25,533       24,973 
Prepayments                      5             705        1,710 
Cash and cash equivalents       16a        174,978      125,659 
                                      ------------  ----------- 
Total current assets                       332,197      293,379 
                                      ------------  ----------- 
 
Total assets                             1,401,199    1,370,737 
                                      ------------  ----------- 
 
  NON-CURRENT LIABILITIES 
Provisions                                   3,196        3,015 
                                      ------------  ----------- 
Total non-current liabilities                3,196        3,015 
                                      ------------  ----------- 
 
CURRENT LIABILITIES 
Trade and other payables                    37,363       34,042 
Provisions                                   1,337          307 
                                      ------------  ----------- 
Total current liabilities                   38,700       34,349 
                                      ------------  ----------- 
 
Total liabilities                           41,896       37,364 
                                      ------------  ----------- 
 
Net assets                               1,359,303    1,333,373 
                                      ------------  ----------- 
 
EQUITY 
Issued capital                   8         665,010      661,573 
Share option reserve                         2,020        4,098 
Accumulated profits                        692,273      667,702 
                                      ------------  ----------- 
Total Equity                             1,359,303    1,333,373 
                                      ------------  ----------- 
 
 
TOTAL EQUITY ATTRIBUTABLE 
 TO: 
 
  *    owners of the parent        1,359,303  1,333,373 
                                           -          - 
  *    non-controlling interest 
Total Equity                       1,359,303  1,333,373 
                                   ---------  --------- 
 

The above Unaudited Interim Condensed Consolidated Statement of Financial Position should be read in conjunction with the accompanying notes.

UNAUDITED INTERIM CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY FOR THE SIX MONTHS ENDED 30 JUNE 2015

 
 
                                       Share 
                            Issued   options  Accumulated 
                           Capital   reserve      profits    Total Equity 
                           US$'000   US$'000      US$'000         US$'000 
                          --------  --------  -----------  -------------- 
Balance as at 1 January 
 2015                      661,573     4,098      667,702       1,333,373 
Profit for the period            -         -       47,397          47,397 
Other comprehensive 
 income for the period           -         -         (99)            (99) 
                          --------  --------  -----------  -------------- 
Total comprehensive 
 income for the period           -         -       47,298          47,298 
 
Dividend paid                    -         -     (22,727)        (22,727) 
Transfer of share based 
 payments                    3,437   (3,437)            -               - 
Recognition of share 
 based payments                  -     1,359            -           1,359 
Balance as at 30 June 
 2015                      665,010     2,020      692,273       1,359,303 
                          --------  --------  -----------  -------------- 
 
 
 
 
                                       Share 
                            Issued   options  Accumulated    Total Equity 
                           Capital   reserve      profits         US$'000 
                           US$'000   US$'000      US$'000 
                          --------  --------  -----------  -------------- 
Balance as at 1 January 
 2014                      612,463     5,761      594,624       1,212,848 
Profit for the period            -         -       31,922          31,922 
Other comprehensive              -         -            -               - 
 income for the period 
                          --------  --------  -----------  -------------- 
Total comprehensive 
 income for the period           -         -       31,922          31,922 
Issue of shares             48,218         -            -          48,218 
Own shares acquired 
 in the period             (1,743)         -            -         (1,743) 
Transfer of share based 
 payments                    1,521   (1,521)            -               - 
Recognition of share 
 based payments                  -       973            -             973 
 
Balance as at 30 June 
 2014                      660,459     5,213      626,546       1,292,218 
                          --------  --------  -----------  -------------- 
 
 

The above Unaudited Interim Condensed Consolidated Statement of Changes in Equity should be read in conjunction with the accompanying notes.

UNAUDITED INTERIM CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015

 
                                                                Six Months 
                                  Three Months Ended               Ended 
                                        30 June                   30 June 
                              Note        2015       2014       2015       2014 
                                       US$'000    US$'000    US$'000    US$'000 
Cash flows from operating 
 activities 
Cash generated in operating 
 activities                   16(b)     49,765     20,258    105,290     47,581 
Finance income                            (36)      (119)       (98)      (256) 
                                     ---------  --------- 
Net cash generated by 
 operating activities                   49,729     20,139    105,192     47,325 
                                     ---------  ---------  ---------  --------- 
 
Cash flows from investing 
 activities 
Acquisition of property, 
 plant and equipment                   (9,343)   (14,275)   (18,067)   (42,763) 
Exploration and evaluation 
 expenditure                           (6,130)   (10,579)   (14,721)   (13,078) 
Proceeds from sale / 
 (Acquisition) of financial 
 assets                                      -          -          -         91 
Cash acquired through 
 Ampella Mining Limited 
 asset acquisition                           -          -          -      9,254 
Finance income                              36        119         98        256 
                                     ---------  --------- 
Net cash used in investing 
 activities                           (15,437)   (24,735)   (32,690)   (46,240) 
                                     ---------  ---------  ---------  --------- 
 
Cash flows from financing 
 activities 
Dividend paid                         (22,727)          -   (22,727)          - 
Own shares acquired 
 during the period                           -    (1,743)          -    (1,743) 
Net cash provided by 
 financing activities                 (22,727)    (1,743)   (22,727)    (1,743) 
                                     ---------  ---------  ---------  --------- 
 
Net decrease in cash 
 and cash equivalents                   11,565    (6,339)     49,775      (658) 
 
Cash and cash equivalents 
 at the beginning of 
 the period                            163,351    111,957    125,659    105,979 
Effect of foreign exchange 
 rate changes                               62        780        456      1,077 
                                     ---------  ---------  ---------  --------- 
Cash and cash equivalents 
 at the end of the period      16      174,978    106,398    174,978    106,398 
                                     ---------  ---------  ---------  --------- 
 

The above Unaudited Condensed Consolidated Statement of Cash Flows should be read in conjunction with the accompanying notes.

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015

NOTE 1: ACCOUNTING POLICIES

Basis of preparation

These unaudited interim condensed consolidated financial statements have been prepared in accordance with International Accounting Standard 34 "Interim Financial Reporting" (IAS 34) as adopted by the European Union and as issued by the International Accounting Standards Board ("IASB") and the requirements of the Disclosure and Transparency Rules (DTR) of the Financial Conduct Authority (FCA) in the United Kingdom as applicable to interim financial reporting.

The unaudited interim condensed consolidated financial statements represent a 'condensed set of financial statements' as referred to in the DTR issued by the FCA. Accordingly, they do not include all of the information required for a full annual financial report and are to be read in conjunction with the Group's financial statements for the year ended 31 December 2014, which were prepared in accordance with International Financial Reporting Standards ("IFRS") as issued by the International Accounting Standards Board ("IASB") and adopted for use by the European Union and IFRS as issued by the IASB. The financial statements for the year ended 31 December 2014 have been filed with the Jersey Financial Services Commission. The financial information contained in this report does not constitute statutory accounts under the Companies (Jersey) Law 1991, as amended. The financial information for the year ended 31 December 2014 is based on the statutory accounts for the year ended 31 December 2014. Readers are referred to the auditor's report to the Group financial statements as at 31 December 2014 (available at www.centamin.com).

The accounting policies applied in these interim financial statements are consistent with those used in the annual consolidated financial statements for the year ended 31 December 2014 except for the adoption of a number of amendments issued by the IASB and endorsed by the EU which apply for the first time in 2015. The new pronouncements do not have a significant impact on the accounting policies, methods of computation or presentation applied by the Group and therefore the prior period consolidated financial statements have not been restated. The Group has not early adopted any amendments, standards or interpretations that have been issued but are not yet effective.

The preparation of these interim condensed consolidated financial statements requires the use of certain significant accounting estimates and judgment by management in applying the Group's accounting policies. There have been no changes to the areas involving significant judgment and estimates that have been set out in Note 4 of the Group's annual audited consolidated financial statements for the year ended 31 December 2014.

Going concern

These financial statements for the period ended 30 June 2015 have been prepared on a going concern basis, which contemplate the realisation of assets and liquidation of liabilities during the normal course of operations.

As discussed in Note 7, during the prior year the operation of the mine was affected by two legal actions. The first of these followed from a decision taken by Egyptian General Petroleum Corporation ("EGPC") to charge international, not local (subsidised) prices for the supply of DFO, and the second arose as a result of a judgment of the Administrative Court of first instance in relation to, amongst other matters, the Company's 160km(2) exploitation lease. In relation to the first decision, the Company remains confident that in the event that it is required to continue to pay international prices, the mine at Sukari will remain commercially viable. Similarly, the Company remains confident that the appeal it has lodged in relation to the decision of the Administrative Court will ultimately be successful, although final resolution of it may take some time. On 20 March 2013 the Supreme Administrative Court upheld the Company's application to suspend the decision until the merits of the Company's appeal are considered and ruled on, thus providing assurance that normal operations will be able to continue during this process.

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

In the unlikely event that the Group is unsuccessful in either or both of its legal actions, and that the operating activities are restricted to a reduced area, it is the director's belief that the Group will be able to continue as going concern.

The directors have a reasonable expectation that the Group will have adequate resources to continue in operational existence for the foreseeable future. Thus they continue to adopt the going concern basis of accounting in preparing these interim condensed consolidated financial statements.

NOTE 2: SEGMENT REPORTING

The Group is engaged in the business of exploration for and mining of metals only, which represents a single operating segment. The Board is the Group's chief operating decision maker within the meaning of IFRS 8.

Non-current assets other than financial instruments by country:

 
          30 June  31 December 
             2015 
      (Unaudited)         2014 
          US$'000    (Audited) 
                       US$'000 
 
 
Egypt                           994,960  1,017,003 
Ethiopia                         11,151     10,327 
Burkina Faso                     60,152     48,893 
Cote d'Ivoire                     1,940        977 
Australia                             1          2 
United Kingdom                        8        156 
                 ----------------------  --------- 
                             1 ,069,002  1,077,358 
                 ----------------------  --------- 
 

NOTE 3: REVENUE

An analysis of the Group's revenue for the period, from continuing operations, is as follows:

 
                         Three Months              Six Months 
                                Ended                   Ended 
                  30 June (Unaudited)     30 June (Unaudited) 
                     2015        2014        2015        2014 
                  US$'000     US$'000     US$'000     US$'000 
 
Gold sales        123,944     102,428     259,175     204,924 
Silver sales          248         196         496         425 
               ----------  ----------  ----------  ---------- 
                  124,192     102,624     259,671     205,349 
               ----------  ----------  ----------  ---------- 
 

NOTE 4: PROFIT BEFORE TAX

Profit for the period has been arrived at after crediting/(charging) the following gains/(losses) and expenses:

 
                    Three months ended                    Three months ended 
                     30 June 2015                          30 June 2014 
                          Before                                Before 
                     exceptional    Exceptional    Total   exceptional    Exceptional    Total 
                           items          items                  items          items 
                         US$'000        US$'000  US$'000       US$'000        US$'000  US$'000 
Finance income 
Interest received             36              -       36           119              -      119 
                    ------------  -------------  -------  ------------  -------------  ------- 
 

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 4: PROFIT BEFORE TAX (CONTINUED)

 
                        Three months ended                     Three months ended 
                         30 June 2015                           30 June 2014 
                              Before                                 Before 
                         exceptional    Exceptional     Total   exceptional    Exceptional     Total 
                               items          items                   items          items 
Expenses                     US$'000        US$'000   US$'000       US$'000        US$'000   US$'000 
Cost of sales 
Mine production 
 costs                      (67,746)        (8,845)  (76,591)      (49,471)       (14,651)  (64,122) 
Movement in inventory          (905)        (2,048)   (2,953)           905            319     1,224 
Depreciation and 
 Amortisation               (18,488)              -  (18,488)      (21,378)              -  (21,378) 
                        ------------  -------------  --------  ------------  -------------  -------- 
                            (87,139)       (10,893)  (98,032)      (69,944)       (14,332)  (84,276) 
                        ------------  -------------  --------  ------------  -------------  -------- 
 
 
                   Three months ended                      Three months ended 
                    30 June 2015                            30 June 2014 
                         Before                                  Before 
                    exceptional    Exceptional      Total   exceptional    Exceptional      Total 
                          items          items                    items          items 
Other operating         US$'000        US$'000    US$'000       US$'000        US$'000    US$'000 
 costs 
Fixed royalty 
 - attributable 
 to the Egyptian 
 government             (3,717)              -    (3,717)       (3,071)              -    (3,071) 
Corporate costs         (4,211)              -    (4,211)       (4,010)              -    (4,010) 
Other expenses             (29)              -       (29)          (27)              -       (27) 
Foreign exchange 
 gain, net                  763              -        763           541              -        541 
Provision for 
 restoration and 
 rehabilitation 
 - unwinding of 
 discount                  (90)              -       (90)         (134)              -      (134) 
Depreciation               (15)              -       (15)          (28)              -       (28) 
                        (7,299)              -    (7,299)       (6,729)              -    (6,729) 
                   ------------  -------------  ---------  ------------  -------------  --------- 
 
Impairment of 
 available for 
 sale financial 
 assets                    (56)              -       (56)         (408)              -      (408) 
                   ------------  -------------  ---------  ------------  -------------  --------- 
 
 
                    Six months ended                      Six months ended 
                     30 June 2015                          30 June 2014 
                          Before                                Before 
                     exceptional    Exceptional    Total   exceptional    Exceptional    Total 
                           items          items                  items          items 
                         US$'000        US$'000  US$'000       US$'000        US$'000  US$'000 
Finance income 
Interest received             98              -       98           256              -      256 
                    ------------  -------------  -------  ------------  -------------  ------- 
 

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2014 (CONTINUED)

NOTE 4: PROFIT BEFORE TAX (CONTINUED)

 
                        Six months ended                        Six months ended 
                         30 June 2015                            30 June 2014 
                              Before                                  Before 
                         exceptional    Exceptional      Total   exceptional    Exceptional      Total 
                               items          items                    items          items 
Expenses                     US$'000        US$'000    US$'000       US$'000        US$'000    US$'000 
Cost of sales 
Mine production 
 costs                     (132,331)       (22,135)  (154,466)      (92,233)       (27,533)  (119,766) 
Movement in inventory          1,734        (2,705)      (971)       (4,455)        (1,222)    (5,677) 
Depreciation and 
 Amortisation               (42,957)              -   (42,957)      (35,159)              -   (35,159) 
                        ------------  -------------  ---------  ------------  -------------  --------- 
                           (173,554)       (24,840)  (198,394)     (131,847)       (28,755)  (160,602) 
                        ------------  -------------  ---------  ------------  -------------  --------- 
 
 
                   Six months ended                        Six months ended 
                    30 June 2015                            30 June 2014 
                         Before                                  Before 
                    exceptional    Exceptional      Total   exceptional    Exceptional      Total 
                          items          items                    items          items 
Other operating         US$'000        US$'000    US$'000       US$'000        US$'000    US$'000 
 costs 
Fixed royalty 
 - Attributable 
 to the Egyptian 
 government             (7,771)              -    (7,771)       (6,145)              -    (6,145) 
Corporate costs         (6,909)              -    (6,909)       (7,670)              -    (7,670) 
Other expenses             (60)              -       (60)          (60)              -       (60) 
Foreign exchange 
 gain, net                  981              -        981         1,848              -      1,848 
Provision for 
 restoration and 
 rehabilitation 
 - unwinding of 
 discount                 (181)              -      (181)         (269)              -      (269) 
Depreciation               (30)              -       (30)          (55)              -       (55) 
                       (13,970)              -   (13,970)      (12,351)              -   (12,351) 
                   ------------  -------------  ---------  ------------  -------------  --------- 
 
Impairment of 
 available for 
 sale financial 
 assets                       -              -          -         (730)              -      (730) 
                   ------------  -------------  ---------  ------------  -------------  --------- 
 

Exceptional items

The directors consider that items of income or expense which are material by virtue of their unusual, irregular or non-recurring nature should be disclosed separately if the consolidated financial statements are to fairly present the financial position and underlying business performance. In order to allow a better understanding of the financial information presented within the consolidated financial statements, and specifically the Group's underlying business performance, the effect of exceptional items are shown below.

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 4: PROFIT BEFORE TAX (CONTINUED)

Exceptional items (continued)

 
                                      Three Months              Six Months 
                                             Ended                   Ended 
                               30 June (Unaudited)     30 June (Unaudited) 
                                  2015        2014        2015        2014 
                               US$'000     US$'000     US$'000     US$'000 
Included in Cost of sales 
Mine production costs          (8,845)    (14,651)    (22,135)    (27,533) 
Movement in inventory          (2,048)         319     (2,705)     (1,222) 
                            ----------  ----------  ----------  ---------- 
                              (10,893)    (14,332)    (24,840)    (28,755) 
                            ----------  ----------  ----------  ---------- 
 

In January 2012 the Company received a letter from Chevron to the effect that Chevron would not be able to continue supplying DFO to the mine at Sukari at local subsidised prices. It is understood that the reason that this letter was issued was that Chevron had received a letter instructing it to do so from the Egyptian General Petroleum Corporation ("EGPC"). It is further understood that EGPC itself took the decision to issue this instruction because it had received legal advice from the Legal Advice Department of the Council of State (an internal government advisory department) that companies operating in the gold mining sector in Egypt were not entitled to such subsidies. In addition, the Company received a demand from Chevron in 2012 for the repayment of fuel subsidies received in the period from late 2009 through to January 2012, for EGP403 million (approximately US$52.0 million at current exchange rates)..

The Group has taken detailed legal advice on this matter (and, in particular, on the opinion given by Legal Advice Department of the Council of State) and in consequence in June 2012 lodged an appeal against EGPC's decision in the Administrative Courts. Again, the Group believes that its grounds for appeal are strong and that there is every prospect of success. However, as a practical matter, and in order to ensure the continuation of supply, the Group has since January 2012 advanced funds to its fuel supplier, Chevron, based on the international price for diesel. As at the date of the financial statements, no final decision had been taken by the courts regarding this matter. Furthermore, the Group remains of the view that an instant move to international fuel prices is not a reasonable outcome and will look to recover funds advanced thus far should the court proceeding be concluded in its favour. However, management recognises the practical difficulties associated with re-claiming funds from the government and for this reason has, fully provided against the prepayment of US$10.9 million and US$24.8 million made during Q2 2015 and the HY 2015 respectively, as an exceptional item, as follows:

   (a)   a US$10.9 million and a US$24.8 million increase in cost of sales, 
   (b)   a US$2.0 million and a US$2.7 million increase in stores inventories, and 

(c) a US$2.0 million decrease and a US$2.7 million decrease in mining stockpiles and ore in circuit.

This has resulted in a net decrease of US$12.4 million and US$24.8 million in the profit and loss in Q2 2015 and HY 2015 respectively.

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 5: PREPAYMENTS

 
          30 June  31 December 
             2015 
      (Unaudited)         2014 
          US$'000    (Audited) 
                       US$'000 
 

Non-current Prepayments

 
Advance payment to EMRA (1)   28,750  23,750 
                              ------  ------ 
 

(1) With a view to demonstrating goodwill toward the Egyptian government, PGM made advance payments to EMRA which will be netted off against future Profit Share that becomes payable to EMRA.

 
        Six Months          Year 
             Ended         Ended 
                     31 December 
           30 June          2014 
              2015 
       (Unaudited)     (Audited) 
           US$'000       US$'000 
 

Current Prepayments

 
Prepayments        705  1,710 
Fuel prepayments     -      - 
                   ---  ----- 
Prepayments        705  1,710 
                   ---  ----- 
 
 
Movement in fuel prepayments (1) 
Balance at the beginning of the period            -         - 
Fuel prepayment recognised                   24,840    68,737 
Less: Provision charged to (2) : 
         Mine production costs (see Note 
          4)                               (22,135)  (61,564) 
         Property, plant and equipment            -   (6,953) 
         Inventories                        (2,705)     (220) 
Balance at the end of the period                  -         - 
                                           --------  -------- 
 
 

(1) The cumulative fuel prepayment recognised and provision charged as at 30 June 2015 is as follows:

   Fuel prepayment recognised (US$'000)                 186,606 

Provision charged to:

      Mine production costs (US$'000)                        173,484 
      Property, plant and equipment (US$'000)           11,852 
      Inventories (US$'000)                                               1,270 

(2) Refer to Note 4, Exceptional Items, for further details.

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 6: COMMITMENTS

The following is a summary of the Company's outstanding commitments as at 30 June 2015:

 
 Payments due            Total   < 1 year     1 to 5   >5 years 
                       US$'000    US$'000      years    US$'000 
                                             US$'000 
 Operating Lease 
  Commitments(1)           209         64        145          - 
                     ---------  ---------  ---------  --------- 
 Total commitments         209         64        145          - 
                     ---------  ---------  ---------  --------- 
 

(1) Operating lease commitments are limited to office premises in Jersey. As a result of the completion of Stage 4 in the prior year, the Group had no commitments for capital expenditure as at 30 June 2015.

NOTE 7: CONTINGENT LIABILITIES AND CONTINGENT ASSETS

Contingent Liabilities

Fuel Supply

In January 2012, the Group received a letter from Chevron to the effect that Chevron would only be able to supply DFO to the mine at Sukari at international prices rather than at local subsidised prices, which had the effect of adding approximately US$150 per ounce to the cost of production. It is understood that the reason that this letter was issued was that Chevron had received a letter instructing it to do so from the EGPC. It is further understood that EGPC itself issued this instruction because it had received legal advice from the Legal Advice Department of the Council of State (an internal government advisory department) that companies operating in the gold mining sector in Egypt were not entitled to such subsidies. In November 2012, the Group received a further demand from Chevron for the repayment of fuel subsidies received during the period from late 2009 through to January 2012, for EGP403 million (approximately US$52.0 million at current exchange rates).

The Group has taken detailed legal advice on this matter (and, in particular, on the opinion given by the Legal Advice Department of the Council of State) and in June 2012 lodged an appeal against EGPC's decision in the Administrative Courts. Again, the Group believes that its grounds for appeal are strong and that there is a good prospect of success. However, as a practical matter, and in order to ensure the continuation of supply whilst the matter is resolved, the Group has since January 2012 advanced funds to its fuel supplier, Chevron, based on the international price for fuel.

As at the date of this document, no decision had been taken by the courts regarding this matter. The Group remains of the view that an instant move to international fuel prices is not a reasonable outcome and will look to recover funds advanced thus far should the court action be successfully concluded. However, management recognises the practical difficulties associated with reclaiming funds from the government and for this reason has fully provided against the prepayment of US$186.6 million, as an exceptional item. Refer to Note 6 of the accompanying financial statements for further details on the impact of this exceptional provision on the Group's results for Q2 2015.

No provision has been made in respect of the historic subsidies prior to January 2012 as, based on legal advice, the Company believes that the prospects of a court finding in its favour in relation to this matter remain very strong.

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 7: CONTINGENT LIABILITIES AND CONTINGENT ASSETS (CONTINUED)

Supreme Administrative Court Appeal

On 30 October 2012, the Administrative Court in Egypt handed down a judgment in relation to a claim brought by, amongst others, an independent member of a previous parliament, in which he argued for the nullification of the agreement that confers on the Group rights to operate in Egypt. This agreement, the Concession Agreement, was entered into between the Arab Republic of Egypt, the Egyptian Mineral Resources Authority ("EMRA") and Centamin's wholly--owned subsidiary Pharaoh Gold Mines ("PGM"), and was approved by the People's Assembly as Law 222 of 1994.

In summary that judgment states that, although the Concession Agreement itself remains valid and in force, insufficient evidence had been submitted to Court in order to demonstrate that the 160km(2) exploitation lease between PGM and EMRA had received approval from the relevant Minister as required by the terms of the Concession Agreement. Accordingly, the Court found that the exploitation lease in respect of the area of 160km(2) was not valid although it stated that there was in existence such a lease in respect of an area of 3km(2) . Centamin, however, is in possession of the executed original lease documentation which clearly shows that the 160km(2) exploitation lease was approved by the Minister of Petroleum and Mineral Resources. It appears that an executed original document was not supplied to the Court at first instance.

Upon notification of the judgment the Group took various steps to protect its ability to continue to operate the mine at Sukari. These included lodging a formal appeal before the Supreme Administrative Court on 26 November 2012. In addition, in conjunction with the formal appeal the Group applied to the Supreme Administrative Court to suspend the initial decision until such time as the court was able to consider and rule on the merits of the appeal. On 20 March 2013 the Court upheld this application thus suspending the initial decision and providing assurance that normal operations would be able to continue whilst the appeal process was under way.

EMRA lodged its own appeal in relation to this matter on 27 November 2012, the day after the Company's appeal was lodged, supporting the Group's view in this matter. Furthermore, in late December 2012, the Minister of Petroleum lodged a supporting appeal and shortly thereafter publicly indicated that, in his view, the terms of the Concession Agreement were fair and that the exploitation lease was valid. The Minister of Petroleum also expressed support for the investment and expertise that Centamin brings to the country. The Company believes this demonstrates the government's commitment to the Group's investment at Sukari and the government's desire to stimulate further investment in the Egyptian mining industry.

The Company does not yet know when the appeal will conclude, although it is aware of the potential for the process in Egypt to be lengthy. The Company has taken extensive legal advice on the merits of its appeal from a number of leading Egyptian law firms who have confirmed that the proper steps were followed with regard to the grant of the 160km(2) lease. It therefore remains of the view that the appeal is based on strong legal grounds and will ultimately be successful. In the event that the appellate court fails to be persuaded of the merits of the case put forward by the Group, the operations at Sukari may be adversely effected to the extent that the Group's operation exceeds the exploitation lease area of 3km(2) referred to in the original court decision.

The Company remains confident that normal operations at Sukari will be maintained whilst the appeal case is heard.

Contingent Assets

There were no contingent assets at period-end (31 December 2014: nil).

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 8: ISSUED CAPITAL

 
 Fully Paid Ordinary                        Six Months                Year Ended 
  Shares                                       Ended 
                                           30 June 2015               31 December 
                                                                          2014 
                                            (Unaudited)                (Audited) 
                                         Number      US$'000       Number       US$'000 
 
Balance at beginning of the period    1,152,107,984  661,573    1,101,397,381   612,463 
Issue of shares (1)                               -        -       50,710,603    48,218 
Own shares acquired during the 
 period                                           -        -                -   (1,743) 
Transfer from share options reserve               -    3,437                -     2,635 
Balance at end of the period          1,152,107,984  665,010    1,152,107,984   661,573 
                                      -------------  -------   --------------  -------- 
 

(1) Relates to the ordinary shares that were admitted to trading as consideration for the acquisition of Ampella Mining Limited.

Fully paid ordinary shares carry one vote per share and carry the right to dividends.

The authorised share capital is an unlimited number of no par value shares.

As at the date of this report the Company held 5,993,041 ordinary shares in treasury (2)

(2) Refers to shares held by the trustee pursuant to the Deferred Bonus Share Plan

NOTE 9: RELATED PARTY TRANSACTIONS

The related party transactions for the three months ended 30 June 2015 are summarised below:

- Salaries, superannuation contributions, bonuses, consulting and Directors' fees paid to Directors during the three months ended 30 June 2015 amounted to US$416,599 (30 June 2014: US$679,839).

- Mr J El-Raghy is a Director and shareholder of El-Raghy Kriewaldt Pty Ltd ("ELK"), which provides office premises to the Company in Australia. All dealings with ELK are in the ordinary course of business and on normal terms and conditions. Rent paid to ELK during the three months ended 30 June 2014 amounted to US$11,539 (30 June 2014: US$12,689).

The related party transactions for the six months ended 30 June 2015 are summarised below:

- Salaries, superannuation contributions, bonuses, consulting and Directors' fees paid to Directors during the six months ended 30 June 2015 amounted to US$838,685 (30 June 2014: US$1,510,639).

- Mr J El-Raghy is a Director and shareholder of El-Raghy Kriewaldt Pty Ltd ("ELK"), which provides office premises to the Company in Australia. All dealings with ELK are in the ordinary course of business and on normal terms and conditions. Rent paid to ELK during the six months ended 30 June 2015 amounted to US$23,193 (30 June 2014: US$26,172).

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 10: EARNINGS PER SHARE

Basic earnings per share are calculated using the weighted average number of shares outstanding. Diluted earnings per share are calculated using the treasury stock method. In order to determine diluted earnings per share, the treasury stock method assumes that any proceeds from the exercise of dilutive stock options and warrants would be used to repurchase common shares at the average market price during the period, with the incremental number of shares being included in the denominator of the diluted earnings per share calculation. The diluted earnings per share calculation excludes any potential conversion of options and warrants that would increase earnings per share.

 
                                 Three Months               Six Months Ended 
                                     Ended                       30 June 
                                    30 June                    (Unaudited) 
                                  (Unaudited) 
                                2015           2014           2015           2014 
                               Cents          Cents          Cents          Cents 
                           Per Share      Per Share      Per Share      Per Share 
Basic earnings per 
 share                          1.65           0.99           4.15           2.85 
                       -------------  -------------  -------------  ------------- 
Diluted earnings per 
 share                          1.63           0.98           4.10           2.82 
                       -------------  -------------  -------------  ------------- 
 

Basic earnings per share

The earnings and weighted average number of ordinary shares used in the calculation of basic earnings per share are as follows:

 
                               Three Months         Six Months Ended 
                                   Ended                 30 June 
                                  30 June              (Unaudited) 
                                (Unaudited) 
                              2015        2014        2015        2014 
                           US$'000     US$'000     US$'000     US$'000 
Earnings used in the 
 calculation of basic 
 EPS                        18,833      11,330      47,397      31,922 
                        ----------  ----------  ----------  ---------- 
 
 
                                    Three Months               Six Months Ended 
                                        Ended                       30 June 
                                       30 June                    (Unaudited) 
                                     (Unaudited) 
                                   2015           2014           2015           2014 
                                    No.            No.            No.            No. 
Weighted average number 
 of ordinary shares 
 for the purpose of 
 basic EPS                1,143,422,483  1,140,333,682  1,142,857,680  1,120,934,917 
                          -------------  -------------  -------------  ------------- 
 

Diluted earnings per share

 
   The earnings and weighted         Three Months         Six Months Ended 
  average number of ordinary             Ended                 30 June 
          shares used in the            30 June              (Unaudited) 
      calculation of diluted          (Unaudited) 
          earnings per share 
             are as follows: 
                                    2015        2014        2015        2014 
                                 US$'000     US$'000     US$'000     US$'000 
Earnings used in the 
 calculation of diluted 
 EPS                              18,833      11,330      47,397      31,922 
                              ----------  ----------  ----------  ---------- 
 

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 10: EARNINGS PER SHARE (CONTINUED)

 
                                    Three Months               Six Months Ended 
                                        Ended                       30 June 
                                       30 June                    (Unaudited) 
                                     (Unaudited) 
                                   2015           2014           2015           2014 
                                    No.            No.            No.            No. 
Weighted average number 
 of ordinary shares 
 for the purpose of 
 diluted EPS              1,158,655,821  1,153,702,973  1,157,360,078  1,133,688,153 
                          -------------  -------------  -------------  ------------- 
 
 
Weighted average number 
 of ordinary shares 
 for the purpose of 
 basic EPS                     1,143,422,483  1,140,333,682  1,142,857,680  1,120,934,917 
Shares deemed to be 
 issued for no consideration 
 in respect of employee 
 options                          15,233,338     13,369,291     14,502,398     12,753,236 
                               -------------  -------------  -------------  ------------- 
Weighted average number 
 of ordinary shares 
 used in the calculation 
 of diluted EPS                1,158,655,821  1,153,702,973  1,157,360,078  1,133,688,153 
                               -------------  -------------  -------------  ------------- 
 

NOTE 11: PROPERTY, PLANT AND EQUIPMENT

 
 Six Months 
  Ended 30                             Land        Plant                        Mine 
  June 2015             Office          and          and       Mining    Development   Stripping    Capital 
  (Unaudited)        equipment    buildings    equipment    equipment     properties       Asset        WIP      Total 
                       US$'000      US$'000      US$'000      US$'000        US$'000     US$'000    US$'000    US$'000 
 Cost 
 Balance at 
  31 December 
  2014                   5,383        1,142      565,811      220,654        228,192           -    121,252  1,142,434 
 Additions                   6            -            2            -              -           -     15,502     15,510 
 Transfers                   3            -       19,429       16,532          4,665           -   (40,629)          - 
                   -----------  -----------  -----------  -----------  -------------  ----------  ---------  --------- 
 Balance at 
  30 June 2015           5,392        1,142      585,242      237,186        232,857           -     96,125  1,157,944 
                   -----------  -----------  -----------  -----------  -------------  ----------  ---------  --------- 
 
 Accumulated 
  depreciation 
 Balance at 
  31 December 
  2014                 (4,254)        (177)     (67,744)     (71,798)       (69,497)           -          -  (213,470) 
 Depreciation 
  and 
  amortisation           (303)          (4)     (15,199)     (14,494)       (12,987)           -          -   (42,987) 
                   -----------  -----------  -----------  -----------  -------------  ----------  ---------  --------- 
 Balance at 
  30 June 2015         (4,557)        (181)     (82,943)     (86,292)       (82,484)           -          -  (256,457) 
                   -----------  -----------  -----------  -----------  -------------  ----------  ---------  --------- 
 
 
 
   Year Ended 
   31 December 
   2014 (Audited) 
   Cost 
 Balance at 
  31 December 
  2013                   4,625     171     284,902     178,374     182,974     -     426,461   1,077,507 
 Additions                  17       -           8           -       6,979     -      61,252      68,256 
 Decrease 
  in rehabilitation 
  asset                      -       -           -           -     (5,161)     -           -     (5,161) 
 Acquisition 
  of subsidiary          1,080   1,131         814       1,224           -     -           3       4,252 
 Disposals               (571)   (160)       (724)       (391)           -     -       (574)     (2,420) 
 Transfers                 232       -     280,811      41,447      43,400     -   (365,890)           - 
                      --------  ------  ----------  ----------  ----------  ----  ----------  ---------- 
 Balance at 
  31 December 
  2014                   5,383   1,142     565,811     220,654     228,192     -     121,252   1,142,434 
                      --------  ------  ----------  ----------  ----------  ----  ----------  ---------- 
 
 Accumulated 
  depreciation 
 Balance at 
  31 December 
  2013                 (3,051)    (23)    (42,747)    (46,326)    (34,774)     -           -   (126,921) 
 Acquisition 
  of subsidiary          (765)   (146)       (649)     (1,224)           -     -           -     (2,784) 
 Depreciation 
  and amortisation       (730)     (8)    (24,456)    (24,373)    (34,723)     -           -    (84,290) 
 Disposals                 292       -         108         125           -     -           -         525 
                      --------  ------  ----------  ----------  ----------  ----  ----------  ---------- 
 Balance at 
  31 December 
  2014                 (4,254)   (177)    (67,744)    (71,798)    (69,497)     -           -   (213,470) 
                      --------  ------  ----------  ----------  ----------  ----  ----------  ---------- 
 Net book 
  value 
 As at 31 
  December 
  2014                   1,129     965     498,067     148,856     158,695     -     121,252     928,964 
                      --------  ------  ----------  ----------  ----------  ----  ----------  ---------- 
 As at 30 
  June 2015                835     961     502,299     150,894     150,373     -      96,125     901,487 
                      --------  ------  ----------  ----------  ----------  ----  ----------  ---------- 
 

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 12: EXPLORATION AND EVALUATION ASSETS

 
                                             Six Months          Year 
                                                  Ended         Ended 
                                                          31 December 
                                                30 June          2014 
                                                   2015 
                                            (Unaudited)     (Audited) 
                                                US$'000       US$'000 
Balance at the beginning of the 
 period                                         123,999        59,849 
Expenditure for the period                       14,018        28,841 
Acquisition of Ampella Mining Limited                 -        37,637 
Impairment of exploration and evaluation 
 asset                                                -       (2,328) 
                                           ------------  ------------ 
Balance at the end of the period                138,017       123,999 
                                           ------------  ------------ 
 

The exploration and evaluation asset relates to the drilling, geological exploration and sampling of potential ore reserves.

NOTE 13: AVAILABLE-FOR-SALE FINANCIAL ASSETS

The unrealised losses on available-for-sale investments recognised in other comprehensive income were as follows:

 
                                              Three Months              Six Months 
                                                     Ended                   Ended 
                                       30 June (Unaudited)     30 June (Unaudited) 
                                          2015        2014        2015        2014 
                                       US$'000     US$'000     US$'000     US$'000 
Loss on fair value of 
 investment - other comprehensive 
 income                                  (235)           -        (99)           - 
                                    ----------  ----------  ----------  ---------- 
 

The available for sale financial asset at period-end relates to a 6.66% (2014 : 11.34%) equity interest in Nyota Minerals Limited ("NYO"), a listed public company, as well as a 0.96% (2014 : 1.6%) equity interest in KEFI Minerals plc ("KEFI").

As a result of the prolonged decline in the fair value in the prior year of the investment in Nyota, the prior period devaluation had been recognised as an impairment loss in the Statement of Comprehensive Income as follows.

 
                            Three Months              Six Months 
                                   Ended                   Ended 
                     30 June (Unaudited)     30 June (Unaudited) 
                        2015        2014        2015        2014 
                     US$'000     US$'000     US$'000     US$'000 
Impairment loss         (56)       (408)           -       (730) 
                  ----------  ----------  ----------  ---------- 
 

NOTE 14: SHARE BASED PAYMENTS

Restricted Share Plan

The Company's new restricted share plan, as approved by shareholders at the recent AGM, allows the Company the right to grant Awards (as defined below) to employees of the Group. Awards may take the form of either conditional share awards, where shares are transferred conditionally upon the satisfaction of performance conditions; or share options, which may take the form of nil cost options or have a nominal exercise price, the exercise of which is again subject to satisfaction of applicable performance conditions.

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 14: SHARE BASED PAYMENTS (CONTINUED)

To date the Company has granted 5,145,000 conditional awards to employees of the Group.

Conditional share awards and options together constitute "Awards" under the Plan and those in receipt of Awards are "Award Holders".

A detailed summary of the scheme rules is set out in the 2015 AGM proxy materials which are available at www.centamin.com. In brief, Awards will vest following the passing of three years from the date of the Award and vesting will be subject to satisfaction of Performance Conditions. For the purpose of the Performance Conditions, the Award will be divided into up to three tranches to be assessed against separate Performance Conditions measured over a three year period. Although the precise Performance Conditions may vary between Awards, the Performance Conditions adopted at the date of the Plan which apply to the first grant are as follows:

   -       20% of the Award shall be assessed by reference to a target total shareholder return (TSR). 

- 50% of the Award shall be assessed by reference to absolute growth in earnings per share (EPS).

   -       30% of the Award shall be assessed by reference to compound growth in gold production. 

The above measures are assessed by reference to current market practice and the Remuneration Committee will have regard to market practice when establishing the precise Performance Conditions for future Awards.

Where the performance conditions have been met, in the case of Conditional Awards, 50% of the total shares under the Award will be issued or transferred to the Award Holders on or as soon as possible following the specified Vesting Date, with the remaining 50% being issued or transferred on the second anniversary of the Vesting Date.

Restricted Share Plan awards granted during the period:

 
                                    RSP 2015 
------------------------------  ------------ 
 Grant date                      4 June 2015 
------------------------------  ------------ 
 Number of instruments             5,145,000 
------------------------------  ------------ 
 TSR : Fair value at grant 
  date GBP (1)                        0.5150 
------------------------------  ------------ 
 TSR : Fair value at grant 
  date US$ (1)                        0.7894 
------------------------------  ------------ 
 EPS : Fair value at grant 
  date GBP (1)                        0.6520 
------------------------------  ------------ 
 EPS : Fair value at grant 
  date US$ (1)                        0.9994 
------------------------------  ------------ 
 Gold Production : Fair value 
  at grant date GBP (1)               0.6520 
------------------------------  ------------ 
 Gold Production : Fair value 
  at grant date US$ (1)               0.9994 
------------------------------  ------------ 
 Vesting period (years)                    3 
------------------------------  ------------ 
 Expected volatility              0 - 72.33% 
------------------------------  ------------ 
 Expected dividend yield (%)           1.97% 
------------------------------  ------------ 
 

(1) The vesting of 20% the awards granted under this plan are dependent on a TSR performance condition. As relative TSR is defined as a market condition under IFRS 2 "Share-based Payment", this requires that the valuation model used takes into account the anticipated performance outcome. We have therefore applied a Monte Carlo simulation model. The simulation model takes into account the probability of performance based on the expected volatility of Centamin and the peer group companies and the expected correlation of returns between the companies in the comparator group.

The remaining 80% of the awards are subject to EPS and gold production performance conditions. As these are classified as non-market conditions under IFRS 2 they do not need to be taken into account when determining the fair value. These grants have been valued using a Black-Scholes model.

The fair value calculated was then converted at the closing GBP:US$ foreign exchange rate on that day.

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 15: FINANCIAL INSTRUMENTS' FAIR VALUE DISCLOSURES

The Group has no financial instruments with fair values that are determined by reference to significant unobservable inputs, i.e. those that would be classified as level 3 in the fair value hierarchy, nor have there been any transfers of assets or liabilities between levels of the fair value hierarchy.

The Group's interest in Nyota Minerals Limited and KEFI Minerals plc is classified as an available for sale financial asset (see note 13). The Group carries its interest in Nyota Minerals Limited and KEFI Minerals plc at fair value, and measures its interest using Level 1 unadjusted quoted prices.

The director's consider that the carrying amounts of financial assets and financial liabilities carried at amortised cost approximate their amortised cost.

NOTE 16: NOTES TO THE STATEMENTS OF CASH FLOWS

(a) Reconciliation of cash and cash equivalents

For the purpose of the statements of cash flows, cash and cash equivalents includes cash on hand and at bank and deposits.

 
                               Three Months         Six Months 
                                   Ended               Ended 
                                  30 June             30 June 
                                (Unaudited)         (Unaudited) 
                                2015      2014      2015      2014 
                             US$'000   US$'000   US$'000   US$'000 
Cash and cash equivalents    174,978   106,398   174,978   106,398 
                            --------  --------  --------  -------- 
 

(b) Reconciliation of profit for the period to cash flows from operating activities

 
                                      Three Months         Six Months 
                                          Ended               Ended 
                                         30 June             30 June 
                                       (Unaudited)         (Unaudited) 
                                       2015      2014      2015      2014 
                                    US$'000   US$'000   US$'000   US$'000 
Profit for the period                18,833    11,330    47,397    31,922 
Add/(less) non-cash items: 
Depreciation / amortisation 
 of property, plant and 
 equipment                           18,503    21,406    42,987    35,215 
Inventory write off                       2         -         3         - 
Increase / (Decrease) 
 in provisions                          178     (533)     1,212       579 
Foreign exchange rate 
 (gain) / loss, net                 (1,169)     (342)   (1,451)     (743) 
Impairment of available-for-sale 
 financial assets                        56       408         -       730 
Share based payment expense             643       375     1,358       973 
 
Changes in working capital 
 during the period : 
(Increase) / Decrease 
 in trade and other receivables       (673)       848     (560)     4,906 
Decrease / (Increase) 
 in inventories                       9,609   (1,746)     9,970     4,920 
(Increase) / Decrease 
 in prepayments                     (4,329)       188   (3,995)       597 
Decrease / (Increase) 
 in trade and other payables          8,112  (11,676)     8,369  (31,518) 
 
Cash flows generated 
 from operating activities           49,765    20,258   106,290    47,581 
                                   --------  --------  --------  -------- 
 

(c) Non-cash financing and investing activities

There have been no non-cash financing and investing activities during the current or comparative period quarter other than the Ampella asset acquisition as disclosed in Note 12.

NOTES TO THE UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED 30 JUNE 2015 (CONTINUED)

NOTE 17: SUBSEQUENT EVENTS

The Directors declared an interim dividend of 0.97 cent per share (US$0.0097) on Centamin plc ordinary shares (totalling approximately US$11 million). The interim dividend for the half year period ending 30 June 2015 will be paid on 9 October 2015 to shareholders on the register on the Record Date of 4 September 2015.

Other than the above, there has not arisen in the interval between the end of the financial period and the date of this report any item, transaction or event of a material and unusual nature likely in the opinion of the Directors of the Company to affect significantly the operations of the company, the results of those operations, or the state of affairs of the Company in subsequent financial periods.

The accompanying Form 52 109FS Certification of interim filings are published, inter alia, for the purposes, of discharging the Company's obligations arising in connection with the listing of its shares on the Toronto Stock Exchange.

NON-GAAP FINANCIAL MEASURES

Three non-GAAP financial measures are used in this report:

1) EBITDA: "EBITDA" is a non-GAAP financial measure, which excludes the following from profit before tax:

   --      Finance costs; 
   --      Finance income; and 
   --      Depreciation and amortisation. 

Management believes that EBITDA is a valuable indicator of the Group's ability to generate liquidity by producing operating cash flow to fund working capital needs and fund capital expenditures. EBITDA is also frequently used by investors and analysts for valuation purposes whereby EBITDA is multiplied by a factor or "EBITDA multiple" that is based on an observed or inferred relationship between EBITDA and market values to determine the approximate total enterprise value of a company. EBITDA is intended to provide additional information to investors and analysts and does not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. EBITDA excludes the impact of cash costs and income of financing activities and taxes, and therefore is not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate EBITDA differently. The following table provides a reconciliation of EBITDA to profit for the year attributable to the Company.

Reconciliation of profit before tax to EBITDA:

 
                           Quarter        Quarter        Quarter        Quarter 
                             ended          ended          ended          ended 
                           30 June        30 June        30 June        30 June 
                              2015           2015           2014           2014 
                            Before      Including         Before      Including 
                       Exceptional    Exceptional    Exceptional    Exceptional 
                             items       items(1)          items       items(1) 
-------------------  -------------  -------------  -------------  ------------- 
                           US$'000        US$'000        US$'000        US$'000 
-------------------  -------------  -------------  -------------  ------------- 
 Profit before 
  tax                       29,734         18,841         25,662         11,330 
-------------------  -------------  -------------  -------------  ------------- 
 Finance income               (36)           (36)          (119)          (119) 
-------------------  -------------  -------------  -------------  ------------- 
 Depreciation 
  and amortisation          18,503         18,503         21,406         21,406 
-------------------  -------------  -------------  -------------  ------------- 
 
 EBITDA                     48,201         37,308         46,949         32,617 
-------------------  -------------  -------------  -------------  ------------- 
 
 
                         Half year      Half year      Half year      Half year 
                             ended          ended          ended          ended 
                           30 June        30 June        30 June        30 June 
                              2015           2015           2014           2014 
                            Before      Including         Before      Including 
                       Exceptional    Exceptional    Exceptional    Exceptional 
                             items       items(1)          items       items(1) 
-------------------  -------------  -------------  -------------  ------------- 
                           US$'000        US$'000        US$'000        US$'000 
-------------------  -------------  -------------  -------------  ------------- 
 Profit before 
  tax                       72,245         47,405         60,677         31,922 
-------------------  -------------  -------------  -------------  ------------- 
 Finance income               (98)           (98)          (256)          (256) 
-------------------  -------------  -------------  -------------  ------------- 
 Depreciation 
  and amortisation          42,987         42,987         35,215         35,215 
-------------------  -------------  -------------  -------------  ------------- 
 
 EBITDA                    115,134         90,294         95,636         66,881 
-------------------  -------------  -------------  -------------  ------------- 
 

(1) Profit before tax, Depreciation and amortisation and EBITDA includes an exceptional provision to reflect the removal of fuel subsidies (refer to Note 4 of the Financial Statements for further details).

2) Cash cost and all-in sustaining costs (AISC) per ounce calculation: Cash cost and AISC per ounce are non-GAAP financial measures. Cash cost of production per ounce is a measure of the average cost of producing an ounce of gold, calculated by dividing the operating costs in a period by the total gold production over the same period. Operating costs represent total operating costs less administrative expenses, royalties, depreciation and amortisation. Management uses this measure internally to better assess performance trends for the Company as a whole. The Company believes that, in addition to conventional measures prepared in accordance with GAAP, certain investors use such non-GAAP information to evaluate the Company's performance and ability to generate cash flow. The Company believes that these measures provide an alternative reflection of the Group's performance for the current period and are an alternative indication of its expected performance in future periods. Cash cost is intended to provide additional information, does not have any standardised meaning prescribed by GAAP and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. This measure is not necessarily indicative of operating profit or cash flow from operations as determined under GAAP. Other companies may calculate these measures differently.

During June 2013 the World Gold Council (WGC), an industry body, published a Guidance Note on the AISC metric, which gold mining companies can use to supplement their overall non-GAAP disclosure. AISC is an extension of the existing 'cash cost' metric and incorporates all costs related to sustaining production and in particular recognising the sustaining capital expenditure associated with developing and maintaining gold mines. In addition, this metric includes the costs associated with developing and maintaining gold mines. In addition, this metric includes the costs associated with corporate office structures that support these operations, the community and rehabilitation costs attendant with responsible mining and any exploration and evaluation costs associated with sustaining current operations. AISC per ounce is arrived at by dividing the dollar value of the sum of these cost metrics, by the ounces of gold produced.

Reconciliation of cash cost per ounce:

 
                                   Quarter        Quarter        Quarter        Quarter 
                                     ended          ended          ended          ended 
                                    30 June        30 June        30 June        30 June 
                                     2015           2015           2014           2014 
                                    Before        Including       Before        Including 
                                  Exceptional    Exceptional    Exceptional    Exceptional 
                                     items        items(1)         items        items(1) 
-----------------  -----------  -------------  -------------  -------------  ------------- 
 Mine production 
  costs (Note 
  4)                (US$'000)          67,746         76,591         49,471         64,122 
-----------------  -----------  -------------  -------------  -------------  ------------- 
 Less: Refinery 
  and transport     (US$'000)           (484)          (484)          (500)          (500) 
-----------------  -----------  -------------  -------------  -------------  ------------- 
 Cash cost of 
  production        (US$'000)          67,262         76,107         48,971         63,622 
-----------------  -----------  -------------  -------------  -------------  ------------- 
 
 Gold Produced 
  - Total              (oz)           107,781        107,781         81,281         81,281 
-----------------  -----------  -------------  -------------  -------------  ------------- 
 
 Cash cost per 
  ounce              (US$/oz)             624            706            602            783 
-----------------  -----------  -------------  -------------  -------------  ------------- 
 

Reconciliation of all-in sustaining costs per ounce:

 
                                                Quarter           Quarter        Quarter        Quarter 
                                                  ended             ended          ended          ended 
                                                 30 June           30 June        30 June        30 June 
                                                  2015              2015           2014           2014 
                                                 Before           Including       Before        Including 
                                               Exceptional       Exceptional    Exceptional    Exceptional 
                                                  items           items(1)         items          items 
-------------------------  -------------  -------------------  -------------  -------------  ------------- 
 Mine production 
  costs(2) (Note 
  4)                         (US$'000)                 67,746         76,591 
-------------------------  -------------  -------------------  -------------  -------------  ------------- 
 Royalties                   (US$'000)                  3,717          3,717 
-------------------------  -------------  -------------------  ------------- 
 Corporate and 
  administration 
  costs                       (US$'000)                 4,211          4,211 
-------------------------  -------------  -------------------  ------------- 
 Rehabilitation 
  costs                      (US$'000)                     90             90 
-------------------------  -------------  -------------------  ------------- 
 Underground development     (US$'000)                  7,617          7,617 
-------------------------  -------------  -------------------  ------------- 
 Other sustaining 
  capital expenditure        (US$'000)                      9              9 
-------------------------  -------------  -------------------  ------------- 
 By-product credit           (US$'000)                  (249)          (249) 
-------------------------  -------------  -------------------  ------------- 
 
 All-in sustaining 
  costs                      (US$'000)                 83,141         91,986 
-------------------------  -------------  -------------------  ------------- 
 
 Gold Produced 
  - Total                       (oz)                  107,781        107,781 
-------------------------  -------------  -------------------  ------------- 
 
 All-in sustaining 
  costs per ounce              (US$/oz)                   771            853        NR             NR 
-------------------------  -------------  -------------------  -------------  -------------  ------------- 
 

(1) Mine production costs, Cash costs, AISC, AISC per ounce and Cash cost per ounce, includes an exceptional provision against prepayments recorded since Q4 2012 to reflect the removal of fuel subsidies (refer to Note 4 of the Financial Statements for further details).

(2) Includes Refinery and transport.

(3) NR : Not Reported.

3) Cash and cash equivalents, Bullion on hand, Gold Sales Receivables and Available-for-sale Financial Assets: This is a non-GAAP financial measure any other companies may calculate these measures differently.

Reconciliation to cash and cash equivalents, bullion on hand, gold sales receivables and available-for-sale financial assets:

 
                                         Quarter     Quarter 
                                          ended       ended 
                                         30 June     30 June 
                                           2015        2014 
-------------------------------------  ----------  ---------- 
                                         US$'000     US$'000 
-------------------------------------  ----------  ---------- 
 Cash and cash equivalents 
  (Note 16)                               174,978     106,398 
-------------------------------------  ----------  ---------- 
 Bullion on hand (valued 
  at the period-end spot price)            13,089       7,948 
-------------------------------------  ----------  ---------- 
 Gold Sales Receivable                     24,198      18,668 
-------------------------------------  ----------  ---------- 
 Available-for-sale financial 
  assets (Note 13)                            323         332 
-------------------------------------  ----------  ---------- 
 
 Cash, Bullion, Gold Sales 
  Receivables and Available-for-sale 
  Financial Assets                        212,588     133,346 
-------------------------------------  ----------  ---------- 
 

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS

This document contains "forward-looking information" which may include, but is not limited to, statements with respect to the future financial or operating performance of Centamin plc ('Centamin' or 'the Company'), its subsidiaries (together 'the Group'), affiliated companies, its projects, the future price of gold, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and resource estimates, the timing and amount of estimated future production, revenues, margins, costs of production, estimates of initial capital, sustaining capital, operating and exploration expenditures, costs and timing of the development of new deposits, costs and timing of future exploration, requirements for additional capital, foreign exchange risks, governmental regulation of mining operations and exploration operations, timing and receipt of approvals, consents and permits under applicable mineral legislation, environmental risks, title disputes or claims, limitations of insurance coverage and regulatory matters. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "targets", "aims", "anticipates" or "believes" or variations (including negative variations) of such words and phrases, or may be identified by statements to the effect that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved.

Forward-looking statements involve known and unknown risks, uncertainties and a variety of material factors, many of which are beyond the Company's control which may cause the actual results, performance or achievements of Centamin, its subsidiaries and affiliated companies to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Readers are cautioned that forward-looking statements may not be appropriate for other purposes than outlined in this document. Such factors include, among others, future price of gold; general business, economic, competitive, political and social uncertainties; the actual results of current exploration and development activities; conclusions of economic evaluations and studies; fluctuations in the value of the US dollar relative to the local currencies in the jurisdictions of the Company's key projects; changes in project parameters as plans continue to be refined; possible variations of ore grade or projected recovery rates; accidents, labour disputes or slow-downs and other risks of the mining industry; climatic conditions; political instability, insurrection or war, civil unrest or armed assault; labour force availability and turnover; delays in obtaining financing or governmental approvals or in the completion of exploration and development activities; as well as those factors referred to in the section entitled "Risks and Uncertainties" section of the Management Discussion & Analysis filed on SEDAR at www.sedar.com and on the National Storage Mechanism. The reader is also cautioned that the foregoing list of factors is not exhausted of the factors that may affect the Company's forward-looking statements.

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of this document and, except as required by applicable law, the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

QUALIFIED PERSON AND QUALITY CONTROL

Information in this report which relates to exploration, geology, sampling and drilling is based on information compiled by geologist Mr Richard Osman and Christopher Boreham (Underground Manager) who are full time employees of the Company, and are members of the Australasian Institute of Mining and Metallurgy each with more than five years' experience in the fields of activity being reported on, and are 'Competent Persons' for this purpose and are "Qualified Persons" as defined in "National Instrument 43-101 of the Canadian Securities Administrators".

Refer to the technical report entitled "Mineral Resource and Reserve Estimate for the Sukari Gold Project, Egypt" dated 30 January 2014 and filed on SEDAR at www.sedar.com, for further discussion of the extent to which the estimate of mineral resources/reserves may be materially affected by any known environmental, permitting, legal, title, taxation, socio-political, or other relevant issues.

-------------------------------------------End of Announcement------------------------------------------

This information is provided by RNS

The company news service from the London Stock Exchange

END

IR GGUWWRUPAGQG

Centamin (LSE:CEY)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Centamin Charts.
Centamin (LSE:CEY)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Centamin Charts.