Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

16 January 2018

Anglo Asian Mining plc

Q4 & FY 2017 Production and operations review

Anglo Asian delivers total production in top percentile of forecast

Anglo Asian Mining plc ("Anglo Asian" or the "Company"), the AIM listed gold, copper and silver producer focused in Azerbaijan, is pleased to provide a production, sales and operations review for its Gedabek gold, copper and silver mining and production contract area ("Gedabek") in western Azerbaijan for the three months to 31 December 2017 ("Q4 2017") and the year ended 31 December 2017 ("FY 2017"). Note that all references to "$" are to United States dollars.

Overview

-- 71,461 gold equivalent ounces ("GEOs") produced during FY 2017 - at the uppermost level of the Company's forecast of 64,000 to 72,000 GEOs

-- Production for FY 2017 was just over one per cent. lower than FY 2016 of 72,304 GEOs despite suspension of mining for part of the year from the main open pit and the Gadir underground mine whilst production optimisation was carried out

-- Increased copper and silver production during FY 2017 with a small decrease in gold production

o 2.6 per cent. increase in copper produced to 1,991 tonnes of copper (FY 2016: 1,941 tonnes)

o 4.7 per cent. increase in silver produced to 172,853 ounces (FY 2016: 165,131 ounces)

o 8.8 per cent. decrease in gold produced to 59,617 ounces (2016: 65,394 ounces)

-- Solid upward trajectory in total production during 2017 reflecting the expansion initiatives undertaken at Gedabek with a significant increase in Q4 2017 due to the commencement of production in September from the new Ugur open pit mine as follows:

 
 2017 quarter    Total production 
  ended           (GEOs) 
--------------  ----------------- 
 31 March             14,577 
--------------  ----------------- 
 30 June              15,985 
--------------  ----------------- 
 30 September         17,714 
--------------  ----------------- 
 31 December          23,185 
--------------  ----------------- 
  Total - FY 
      2017            71,461 
--------------  ----------------- 
 

-- Net debt reduced by approximately 47 per cent. during FY 2017 to $18.3 million at 31 December 2017 (31 December 2016: $34.6 million)

-- Water treatment plant now producing around 200,000 litres of clean water per day and a six-metre raise of the tailings dam wall completed in Q4 2017

   --    Operational performance anticipated to be further enhanced in 2018 due to 

o Recommencement of mining operations from the main Gedabek open pit in Q1 2018

o Recommencement of flotation processing, independent of the agitation leaching plant, following installation of a second, dedicated crusher line targeted for Q2 2018 - this will increase processing capacity significantly

Anglo Asian CEO Reza Vaziri commented, "I am delighted to report that following a very strong performance in Q4 2017, Anglo Asian has delivered full year production at the very top of its published forecast range. This is a considerable achievement in itself, but when taken together with the recent expansion and production optimisation initiatives put in place and commencement of production from Ugur, it is clear that 2017 was an overwhelmingly successful year for Anglo Asian. The almost halving of net debt in the year is also a significant achievement as the Company returns to financial health.

"Anglo Asian is continuing to lay the foundations for long term sustainable production growth and to deliver value to its shareholders. Mining is expected to recommence at our main open pit at Gedabek in the near-term together with the installation of a second, dedicated crusher line for the flotation plant. These should significantly enhance our production profile throughout 2018. I look forward to providing further updates on forecast 2018 production and expansion and exploration objectives in the coming weeks."

Production and sales review

Q4 2017

-- 31 per cent. increase in total production expressed as GEOs for Q4 2017 to 23,185 GEOs (Q3 2017: 17,714 GEOs)

-- 52 per cent. increase in gold production for Q4 2017 to 21,931 ounces (Q3 2017: total 14,468 ounces) due to production from Ugur

-- Copper production for Q4 2017 totalled 119 tonnes (Q3 2017: 550 tonnes) from SART processing only. No flotation concentrate produced in Q4 2017 as the agitation leaching plant treated Ugur ore which does not contain copper

-- 18 per cent. increase in silver production for Q4 2017 to 47,478 ounces (Q3 2017: total 40,288 ounces)

-- Gold bullion sales of 18,520 ounces at an average of $1,278 per ounce (Q3 2017: 9,287 ounces at an average of $1,286 per ounce)

-- Copper concentrate shipments to the customer totalled 196 dry metric tonnes ("dmt") with a sales value of $1.0 million (excluding Government of Azerbaijan production share) (Q3 2017: 2,905 dmt with a sales value of $5.5 million)

FY 2017

-- Total production expressed as gold equivalent ounces was 71,461 GEOs (FY 2016: 72,304 GEOs) compared to target production of between 64,000 and 72,000 GEOs

-- Gold production for FY 2017 totalled 59,617 ounces (FY 2016: total 65,394 ounces) - lower production earlier in the year was partially offset by production from Ugur commencing in September 2017

-- Copper production for FY 2017 totalled 1,991 tonnes (FY 2016: 1,941 tonnes) despite flotation plant idled in Q4 2017

   --    Silver production for FY 2017 totalled 172,853 ounces (FY 2016: total 165,131 ounces) 

-- Gold bullion sales of 43,496 ounces at an average of $1,265 per ounce (FY 2016: sales of 53,281 ounces at an average of $1,253 per ounce)

-- Copper concentrate shipments to the customer totalled 8,497 dmt with a sales value of $16.8 million (excluding Government of Azerbaijan production share) (FY 2016: 6,830 dmt with a sales value of $12.3 million)

Company financial review

Net debt

The Company had net debt at 31 December 2017 of $18.3 million, a reduction of $16.3 million since 31 December 2016.

 
                                                        $m 
Kapital Bank                                           1.0 
Amsterdam Trade Bank and Gazprombank (Switzerland)     7.4 
International Bank of Azerbaijan                       2.1 
Atlas Copco equipment finance loan                     0.3 
 YapiKredit                                            2.2 
 Pasha Bank                                            3.7 
 Reza Vaziri - director's loan                         3.9 
                                                     ----- 
Total loans                                           20.6 
Cash on hand and at bank                             (2.3) 
                                                     ----- 
Net debt                                              18.3 
                                                     ----- 
 

The amount of the loan facility from Reza Vaziri is $4.0 million and the term of the loan has been extended until 8 January 2019. The amount currently outstanding under the facility is $3.9 million. The interest rate of the loan has been reduced from 10 per cent. to 7 per cent. from 9 January 2018 with all other terms of the loan remaining unchanged.

Operations review

The Company mined the following ore in the year ended 31 December 2017:

 
                 9 months to           3 months to          12 months to 
                 30 September          31 December           31 December 
                     2017                  2017                  2017 
            --------------------  --------------------  -------------------- 
                         Average               Average               Average 
                            gold                  gold                  gold 
 Mine        Ore mined     grade   Ore mined     grade   Ore mined     grade 
              (tonnes)     (g/t)    (tonnes)     (g/t)    (tonnes)     (g/t) 
----------  ----------  --------  ----------  --------  ----------  -------- 
 Open pit      712,444      1.18           -         -     712,444      1.18 
 Ugur - 
  o/pit         57,155      3.34     181,663      3.16     238,818      3.20 
 Gadir 
  - u/g         40,176      3.51      40,438      3.61      80,614      3.56 
 Gosha 
  - u/g         24,826      4.07       3,458      3.45      28,284      3.99 
----------  ----------  --------  ----------  --------  ----------  -------- 
 Total         834,601      1.52     225,559      3.24   1,060,160      1.89 
==========  ==========  ========  ==========  ========  ==========  ======== 
 

As previously reported, low grade ore (less than 1.5 grammes per tonne of gold) is being treated by heap leaching, whilst higher grade ore (more than 1.5 grammes per tonne of gold) is being processed through the agitation leaching plant.

During Q4 2017, Anglo Asian stacked 201,097 tonnes of dry crushed ore on to heap leach pads with an average gold content of 0.86 grammes of gold per tonne (Q3 2017: 173,616 tonnes with an average gold content of 1.02 grammes per tonne). The Company also heap leached uncrushed Run of Mine ("ROM") ore. During Q4 2017, Anglo Asian stacked 99,046 tonnes of ROM ore on to heap leach pads with an average gold content of 0.68 grammes of gold per tonne (Q3 2017: 87,979 tonnes with an average gold content of 0.95 grammes per tonne).

During Q4 2017, the Company processed 211,421 tonnes of ore with an average gold content of 2.92 grammes of gold per tonne through the agitation leaching plant (Q3 2017: 176,997 tonnes with an average gold content of 2.04 grammes per tonne through the combined agitation leaching and flotation plants).

During Q4 2017, the Company produced gold doré containing 21,924 ounces of gold and 12,634 ounces of silver at Gedabek (Q3 2017: 12,221 ounces of gold and 4,381 ounces of silver). During Q4 2017, the agitation leaching plant produced 16,952 and 9,777 ounces of gold and silver, respectively, and the heap leach operations produced 4,972 and 2,857 ounces of gold and silver, respectively. During FY 2017 the Company produced gold doré containing 52,534 ounces of gold and 22,728 ounces of silver (FY 2016: 60,937 ounces of gold and 10,288 ounces of silver).

During Q4 2017, the flotation plant was idled as the agitation leaching plant was processing Ugur ore which does not contain copper. During FY 2017, the flotation plant processed 374,202 tonnes of ore in the form of feed-stock of both milled ore and tailings from the agitation leaching plant (FY 2016: 531,840 tonnes). The gross metal contained within this feed-stock was 14,978 ounces of gold, 198,751 ounces of silver and 1,861 tonnes of copper (FY 2016: 15,808 ounces of gold, 335,820 ounces of silver and 2,331 tonnes of copper). Copper concentrate of 7,894 dmt was produced containing 1,310 tonnes of copper and 7,063 ounces of gold (FY 2016: copper concentrate of 6,931 dmt was produced containing 1,121 tonnes of copper and 4,430 ounces of gold).

During Q4 2017, SART processing produced 256 dmt of copper concentrate containing 119 tonnes of copper and 7 ounces of gold (Q3 2017: 333 dmt of copper concentrate containing 165 tonnes of copper and 4 ounces of gold). During FY 2017, SART processing produced 1,436 dmt of copper concentrate containing 681 tonnes of copper and 20 ounces of gold (FY 2016: 1,599 dmt of copper concentrate containing 820 tonnes of copper and 27 ounces of gold).

The following table summarises gold doré production and sales at Gedabek for FY 2016 and FY 2017:

 
                Gold produced*       Silver   Gold sales**  Gold Sales 
                      (ounces)    Produced*       (ounces)       price 
                                   (ounces)                  ($/ounce) 
Quarter ended 
31 March 2016           13,383        1,958         12,058       1,184 
30 June 2016            17,926        2,983         15,661       1,265 
H1 2016                 31,309        4,941         27,719       1,230 
30 Sept 2016            15,407        2,502         12,567       1,332 
31 Dec 2016             14,221        2,845         12,995       1,227 
H2 2016                 29,628        5,347         25,562       1,278 
FY 2016                 60,937       10,288         53,281       1,253 
 
31 March 2017            9,258        2,447          8,283       1,220 
30 June 2017             9,131        3,266          7,406       1,258 
H1 2017                 18,389        5,713         15,689       1,238 
30 Sept 2017            12,221        4,381          9,287       1,286 
31 Dec 2017             21,924       12,634         18,520       1,278 
H2 2017                 34,145       17,015         27,807       1,281 
FY 2017                 52,534       22,728         43,496       1,265 
--------------  --------------  -----------  -------------  ---------- 
NOTE 
 
 

* including Government of Azerbaijan's share

** excludes Government of Azerbaijan's share

The following table summarises copper concentrate production from both its SART and flotation plants for FY 2016 and FY 2017:

 
                     Concentrate     Copper       Gold     Silver 
                     production*   content*   content*   content* 
 2016                      (dmt)   (tonnes)   (ounces)   (ounces) 
 Quarter ended 31 
  March 
 SART processing             363        181         12      7,789 
 Flotation                 1,458        200        607     19,055 
 Total                     1,821        381        619     26,844 
 
 Quarter ended 30 
  June 
 SART processing             373        195          4     10,047 
 Flotation                 1,988        302      1,445     39,184 
 Total                     2,361        497      1,449     49,231 
 
 Quarter ended 30 
  Sept 
 SART processing             418        225          4      7,291 
 Flotation                 1,426        260      1,123     24,106 
 Total                     1,844        485      1,127     31,397 
 
 Quarter ended 31 
  December 
 SART processing             445        219          7      6,751 
 Flotation                 2,059        359      1,255     40,620 
 Total                     2,504        578      1,262     47,371 
 
 2017 
 Quarter ended 31 
  March 
 SART processing             428        210          5      5,523 
 Flotation                 2,312        396      1,815     31,399 
 Total                     2,740        606      1,820     36,922 
 
 Quarter ended 30 
  June 
 SART processing             419        187          4      4,717 
 Flotation                 3,203        529      3,005     37,735 
 Total                     3,622        716      3,009     42,452 
 
 Quarter ended 30 
  Sept 
 SART processing             333        165          4      9,097 
 Flotation                 2,379        385      2,243     26,810 
 Total                     2,712        550      2,247     35,907 
 
 Quarter ended 31 
  December 
 SART processing             256        119          7     34,844 
 Flotation                     -          -          -          - 
 Total                       256        119          7     34,844 
------------------  ------------  ---------  ---------  --------- 
 

* including Government of Azerbaijan's share.

Note that certain amounts for flotation production are different to those previously disclosed due to final reconciliation of production and sales.

The following table summarises total copper concentrate production and sales at Gedabek for FY 2016 and FY 2017. Note that sales of concentrates are initially recorded at provisional amounts until agreement of final assay:

 
 
             Concentrate     Copper       Gold     Silver    Concentrate     Concentrate 
             production*   content*   content*   content*        sales**         sales** 
                   (dmt)   (tonnes)   (ounces)   (ounces)          (dmt)          ($000) 
 Quarter 
  ended 
 31 March 
  2016             1,821        381        619     26,844          1,319           2,043 
 30 June 
  2016             2,361        497      1,449     49,231          1,582           3,019 
 H1 2016           4,182        878      2,068     76,075          2,901           5,062 
 
 30 Sept 
  2016             1,844        485      1,127     31,397          1,782           3,577 
 31 Dec 
  2016             2,504        578      1,262     47,371          2,147           3,615 
 H2 2016           4,348      1,063      2,389     78,768          3,929           7,192 
 FY 2016           8,530      1,941      4,457    154,843          6,830          12,254 
 
 31 March 
  2017             2,740        606      1,820     36,922          2,230           4,220 
 30 June 
  2017             3,622        716      3,009     42,452          3,166           6,104 
 H1 2017           6,362      1,322      4,829     79,374          5,396          10,324 
 
 30 Sept 
  2017             2,712        550      2,247     35,907          2,905           5,480 
 31 Dec 
  2017               256        119          7     34,844            196             977 
 H2 2017           2,968        669      2,254     70,751          3,101           6,457 
 FY 2017           9,330      1,991      7,083    150,125          8,497          16,781 
----------  ------------  ---------  ---------  ---------  -------------  -------------- 
 

* including Government of Azerbaijan's share.

** excluding Government of Azerbaijan's share.

Note that certain figures are different to those previously disclosed due to final reconciliation of concentrate production and sales.

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

**S**

For further information please visit www.angloasianmining.com or contact:

 
                    Anglo Asian Mining   Tel: +994 12 596 
 Reza Vaziri         plc                  3350 
-----------------  -------------------  ------------------ 
                    Anglo Asian Mining   Tel: +994 502 910 
 Bill Morgan         plc                  400 
-----------------  -------------------  ------------------ 
                    Anglo Asian Mining   Tel: +994 502 916 
 Stephen Westhead    plc                  894 
-----------------  -------------------  ------------------ 
 Ewan Leggat        SP Angel Corporate   Tel: +44 (0) 20 
                     Finance LLP          3470 0470 
                     Nominated Adviser 
                     and Broker 
-----------------  -------------------  ------------------ 
 Soltan Tagiev      SP Angel Corporate   Tel + 44 (0) 20 
                     Finance LLP          3470 0470 
-----------------  -------------------  ------------------ 
 Susie Geliher      St Brides Partners   Tel: +44 (0) 20 
                     Ltd                  7236 1177 
-----------------  -------------------  ------------------ 
 Lottie Wadham      St Brides Partners   Tel: +44 (0) 20 
                     Ltd                  7236 1177 
-----------------  -------------------  ------------------ 
 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

The Company's main operating location is the Gedabek contract area ("Gedabek") which is a 300 square kilometer area in the lower Caucasus mountains in western Azerbaijan. The Company developed Azerbaijan's first operating gold/copper/silver mine at Gedabek which commenced gold production in May 2009. Mining at Gedabek was initially from its main open pit which is an open cast mine with a series of interconnected pits. The Company also operates the high grade Gadir underground mine which is co-located at the Gedabek site, In September 2017, production commenced at the Ugur open pit mine, a recently discovered gold ore deposit at Gedabek. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

The Company produced 71,461 gold equivalent ounces ('GEOs') for the year ended 31 December 2017. Gedabek is a polymetallic project which demonstrates a high copper content at the main open pit mine, and an oxide gold-rich zone at Ugur. The Company therefore employs a series of flexible processing routes through which to optimise recoveries and efficiencies. The Company produces gold doré through agitation and heap leaching operations, copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant and also a copper and precious metal concentrate from its flotation plant, which is processing tailings from the agitation leach plant. A second dedicated crusher line is also currently being installed for the flotation plant to enable it to operate independently of the agitation leaching plant.

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company.

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCSFMFMIFASEIF

(END) Dow Jones Newswires

January 16, 2018 02:00 ET (07:00 GMT)

Anglo Asian Mining (LSE:AAZ)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Anglo Asian Mining Charts.
Anglo Asian Mining (LSE:AAZ)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Anglo Asian Mining Charts.